Loading...
HomeMy WebLinkAbout20000535 Ver 1_Other Agency Comments_20000502DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO Regulatory Division Action ID No. 200020599 Ms. Mary Lou Rand Interim Town Manager Town of Garner 9007 1h Avenue Garner, North Carolina 27529 Dear Ms. Rand: May 2, 2000 * '?_ -9- ? ?? fir; NAY '? . ETLA"! K?ATER G` Reference is made to the Department of the Army (DA) Pre-Construction Notification received on April 13, 2000, submitted on your behalf by Mr. Leon Bakely of MacConnell & Associates, P.C., requesting nationwide permit authorization for impacts to approximately 0.25 acre of wetlands and 90 linear feet of stream associated with the construction of a road crossing for access to the Eagle Ridge Water Reclamation Facility located east of Woodnell Drive, in Garner, Wake County, North Carolina. The site is adjacent to an unnamed tributary of Swift Creek, in the Neuse River Basin. Reference is also made to the individual DA permit issued on February 7, 2000, to Sandler at Old Stage authorizing the discharge of fill material into waters of the United States, including wetlands, for completion of construction of the Eagle Ridge residential and golf course development (Action ID 199920576). We have determined that your proposed road crossing to provide access to the Eagle Ridge Reclamation Facility is directly related to, and would not occur but for, the development of the Eagle Ridge residential and golf course development. Accordingly, your project as now proposed is not eligible for authorization by nationwide permit and will require authorization as a modification to the existing individual DA permit. Any proposal to modify the existing individual permit should include a description of all actions taken to avoid and minimize impacts to waters of the United States, and a detailed plan of proposed mitigation for our consideration. Alternatively, it may be possible to modify the plans for your crossing such that no impacts to jurisdictional waters of the United States are involved and no permit is necessary (i.e., span all waters and wetlands). Should you choose to pursue the latter alternative, please forward a copy of your plans to our office for review and concurrence. Please be reminded that issuance of DA authorization must precede any placement of excavated or fill material within any waters of the United States on your property. Should you have questions or comments, please contact Mr. Todd Tugwell, Raleigh Regulatory Field Office, at telephone (919) 876-8441, Extension 26. Sincerely, S. Kenneth Jolly Chief, Raleigh Regulatory Field Office Copies Furnished: Mr. John Dorney North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Mr. Leon Bakely MacConnell & Associates, P.C. Post Office Box 3096 Cary, North Carolina 27519 Mr. Kenneth W. Bailyā€˛ Jr. Environmental Director Sandler at Old Stage 448 Viking Drive, Suite 225 Virginia Beach, Virginia 23452