Loading...
HomeMy WebLinkAbout20221375 Ver 1_More Info Received_20221004Strickland, Bev From: J P <wcquilt@gmail.com> Sent: Tuesday, October 4, 2022 3:03 PM To: Perez, Douglas J Subject: Re: [External] 401 water quality survey Attachments: Shoreline Stabilization Application Form.pdf; Catawba Notification Form.pdf; Catawba Notification Form.docx; Catawba Notification Form.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Doug, Thank you for the information. I have completed both the on line application and the Catawba Riparian Buffer form. I have attached copies below. In summary I propose adding —200 cubic feet of RipRap, and will not remove any existing landscaping, trees, or shrubbery. Please let me know what I need to do next. Thanks, Joe Presing > On Sep 28, 2022, at 14:18, Perez, Douglas J <doug.perez@ncdenr.gov> wrote: > > Hello, > > I am currently in training and thus not able to answer phone calls, so email is the best way to get ahold of me. > For your project, you will need written approval from NCDWR: > https://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting/application- forms-help-documents > If you go to the link above, scroll down to the shoreline header and you will find the online application. (YOU DO NOT have to do the pre -file notification). > Please include in application the following: > Current photos of your shoreline and the buffer > A plat of your property (can be obtained from your local county GIS website) > Aerial photos (can be obtained from your local county GIS website) > A work/site diagram that includes the following: > Length of shoreline (in linear feet) > Measurement (in feet) of proposed work ABOVE full pond or top of bank > Measurement (in feet) of proposed work BELOW full pond or top of bank > A vicinity location map (can be obtained from Google Maps) > A signed version (by all parties involved) of the Catawba Riparian Buffer form (attached here in two formats; just use one) > > Should you have any difficulties or questions along the way, please feel free to reach out. > Thank you, > 1 > Doug Perez > > > Original Message > From: J P <wcquilt@gmail.com> > Sent: Wednesday, September 28, 2022 2:17 PM > To: Perez, Douglas J <doug.perez@ncdenr.gov> > Subject: [External] 401 water quality survey > > CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> > > > Doug, > My name is Joe Presing and we live on Lake Norman in Mooresville and wish to add a small amount of riprap to our existing riprap. I spoke with Dennis Whitaker at Duke Energy regarding the permit from Duke and he explained my first step would be to contact you regarding a 401 water quality survey. > > I have left you a few voice messages on your office and cell phone. Please let me know what my next steps should be and how best to stay in contact? > > Thanks, > Joe 2 I. Applicant Information I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* wcquilt@gmail.com Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was submitted on: Owner Information: Name: * Joseph Presing Email: * wcquilt@gmail.com Phone Number: * (860)748-7456 (xxx)xxx-xxxx Mailing Address: * Street Address 170 W Maranta Rd. Address Line 2 City State / Province / Region Mooresville NC Postal / Zip Code Country 28117-6337 United States Is there an agent working on the project? * Yes No II. Project Information Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Presing RipRap Repair If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Upload Map: 170WMarantaVicinityLatLongPDF.pdf 746.04KB pdf only Latitude: * 30.605557 Longitude: *-80.877180 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* 170WMarantaGISTopographicViewProp... 2.13MB pdf only Please use the diagram at the link below: https://edocs.deq. nc.gov/WaterResources/O/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* 170WMarantaShorelinePhotoAndDimen... 708.44KB pdf only 4. Location of the property (where work is to be conducted) Nearest Town: * Mooresville County: * Iredell Lake/ river/ ocean adjacent to Lake Norman property: * Subdivisions name or site address: * 170 W Maranta Rd (Enclave Lot 10) Include phase/lot number Directions to site: * Rte 77 Exit 36. Take Rt150 West 3/4 mile to Bluefield Rd. Right onto Bluefield. Travel North 1/4 mile to Carriage Club Dr. Left onto Carriage Club. Travel 1/10 mile to Glencoe Ln. Left onto Glencoe. Travel 1/2 mile to bottom of hill to Maranta Rd. Left onto W Maranta Rd. Travel 1/2 mile. 170 W Maranta is on the right. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: 170 W Maranta Rd. is a residential dwelling. Residential, undeveloped, etc. 6. Property Size 0.48 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We wish to add RipRap to the existing RipRap because the shoreline is eroding in 2 places. The loss of shoreline soil is undercutting a tree at the shoreline. We will add landscape cloth prior to adding the riprap in order to contain the soil from erosion. We will not remove any trees, and will leave shrubbery at shoreline or replace with similar. We will not disturb anything below water level other than the addition of the riprap. 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 5 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted: * (number of trees, for instance) The land is mostly lawn, with 5 large trees, and some shrubbery at the shoreline. None of the vegetation will be impacted. Sketch: pdf only Sign and Submit Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Joseph Presing Signature: * 0106r` &-qAIIt"F CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Contractor/agent: Sign Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Signature Contractor/agent: Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Contractor/agent: Signature Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: