Loading...
HomeMy WebLinkAbout19960722 Ver 1_Fax_1999081308/12/1999 20:47 8565855 t. WAKE COUNTY ENGINEERING Department of Environmental Services Erosion, Flood and Stormwater Services (919) 856-7449 PAX: (919) 856-5855 PO Box 550, Raleigh, NC 27602 FAX COVER SHEET DATE: -13-y9 TO: (Gd ? .?? ?r? c r.,l ??? rec. FAX N[JM BM- NC LAMER OF PAGES (including, covcz): 3 FAX IS SENT BY: ?< < ev PAGE 01 IF YOU AO NOT RECEIVE ALL PAGES CLEARLY, CALL BACK AS SOON AS POSSIBLE REIMA KS: Cjue q 7 N6vby L??AS,.?yess7/s- 1?? pd eec r?,r... w ? fti G? /if . / W,1?w T ?*l f 5??6 nytttov I65Kds Cep"?sa 5,0 ozy/?,A A11e,1 WI r' Ceti K °k 05 ?? d . ` LA.`S sr ?ar? ?.? ?Vik To protect and improve the quality of Wake County's environment and ensure a healthy future for its citizens through cooperation, education, management and enforcement -Printed on Nec"I&d Papor- 08/12/1999 20:47 8565855 ENGINEERING PAGE 02 WAKE COUNTY Department of Environmental Services Erosion, Flood and Stormwater Services (919) 856-7449 FAX: (919) 856-5855 PO gox 550, Raleigh, NC 27602 08/13/99 Arland Community Development 3211 Bramer Drive, Suite F- Raleigh, N C 27602 Phone #: 9I9/872-3525 Fax #: 9191 - ATIN: John Meyers RE: Letter of Disapproval Project Name, Eagle Ridge Stream, Relocation Submitted By: John R McAdams Co any Project #: 99-0107 P O Box 14005 Date Received: 6-28-99 Date Processing Initiated. 7-14-99 Disturbed Acres: 0 Watershed: Neuse 03-04-02 Research Triangle Park Phone #: 919/361-5000 Fax #: 919/361-2269 Submittal Revision ? flan Review Fee: $0.00 band Disturbance Fee: Pending Dear Mr. Meyers: The Erosion and Sedimentation Control Plan submitted for the subject project has been reviewed by this office- Based upon a thorough review of the submitted plans and supporting materials, we find the plan as submitted to be unacceptable and said plan is hereby disapproved by the authority grated to this office by North Carolina General Assembly through Chapter 392 of the Sessions Laws of North Carolina, 1973 (hereinafter refer as Erosion and Sedimentation Control Ordinance of Wake County). The reasons for disapproval of the submitted plan and any recommendations are listed and explained on the enclosed form which is incorporated as a part of this letter of disapproval. You may submit a Revised Erosion and Sedimentation Control plan for approval covering those items as outlined on the enclosed form Under the authority of Erosion and Sedimentation Control Ordinance, this office has 1.5 days from the date of receipt to approve or disapprove your revised plan. However, if you wish to contest the disapproval of this plan, you must request an administrative hearing within 15 days of your receipt of this Letter of Disapproval. This request must be in the foram of a written demand, conforming to the requirements of A9glg Section 11(1) of the Ordinance. A copy of the petition must be served on this Division and to the Director of the Department of Environmental Services. Reasons for Disapproval: First let me tell you that I was impressed with the detailed design packet submitued with your last submission and after reviewing the new calculations we can accept the use of temporary matting. There are still some issues that To protect and improve the quality of Wake County's environment and ensure a healthy future for its citizens through cooperation, education, management and enforcement - Printed on Recycled Paper- 08/12/1999 20:47 8565855 ENGINEERING PAGE 03 need to be addressed. There are some design elements that we are unwilling to accept and there are others that need to be spelled out in more detail. I want to make sure your design intentions are understood by the contractor. (1.) The design specifications for your channel relocation still show side slopes that are not acceptable (1.5:1). For all practical purposes this will be a grassed channel with temporary liner until the selected bank vegetation forms a stable root mass. We can accept no less than 2:1 side slopes even,with a vegetative cover of shrubs and vines. (2.) In the last review it was stated that the 2:1 side slopes would be allowed only if you show stable vegetation that was slope adapted. You have provided a list of plants to be used, which does not sufficiently describe the process. I will need to see a detailed planting plan, describing type of vegetation, spacing (density) of plants in each zone, and installation method to be used. I would like this broken down into zones (stream bottom, mean low water, mean water level and mean high water). There needs to be details and or instructions on how the planting will be installed in the matting in order not to undermine the integrity of the matting. I am especially concerned about what is refered to in the N.C. Sediment and Erosion Control Design Manual Section (6.72)(attached) as tho "reed bank zone" and how the installation of the type vegetation to be used (rushes,reed grasses, cattails, etc.) will affect the stablity of the texmpoary matting in the stream bottom. (3.) Another issue is the use of rye grass in the hydro seeding mixture. While rye grass does gerrainate quickly it is too competative when mixed with other grasses and hurts more than, it helps. Please remove rye grass from the mixture. (4.) I would still like a note on the plat} as follows NO'T'E; The water from the existing channel is not to be diverted into the new channel until vegetation in the new channel is stable and only at the direction of bake County Environmental Engineer/Planner. Pending approval of a revised plan or a decision on an appeal, commencement or continuation of any land- disturbing activity associated with this project will constitute a violation of the Sedimentation and Erosion Control Ordinance of Wake County. Please feel free to contact this office at your convenience if you have any questions or if we can provide any assistance in resolving this matter. Sincerely, W. Jake or End ental Engineer/Planner I cc: Scott Mitchell, John R. McAdams Company, Designer John Dorney, NC Division of Water Quality