HomeMy WebLinkAboutSW6220604_Plansheet 08 - Grading_Drainage Plan_20220926VILI DRIVE —
SEE SHEET 6
41
42
STA
ROADWAY INTERSECTION
207+05.2 = STA 400+00
43
370 HIGH POINT STA: 400+35.00
INTERSECTI
STA 207+05.2 (
STA 400+00 (S
365
360
355
350
345
340
335
330
325
320
ROADSIDE / SPECIAL DITCH SCHEDULE
ROAD SIDE
OR DITCH ID
BEGIN STATION
(STA)
END STATION
(STA)
DRAINAGE AREA
(AC)
10-YEAR FLOW BOTTOM WIDTH (BW) DEPTH (D) LENGTH
(CFS) (FT) (FT) (FT)
SIDE SLOPE (Z)
(z: 1)
AVE. SLOPE
(%)
LINING
LT
400+23
407+30
1.6
5.1 0 1 707
4
3.1
GRASS W/ N.A.G S75
RT
400+23
402+85
0.5
1.6 0 1 262
4
3.1
GRASS W/ N.A.G S75
LT
407+30
408+35
1.8
5.7 0 1 170
4
2.0
GRASS W/ N.A.G S75
HIGH POINT
VILI
EL= 360.50'
= PVI EL=
360.20'
GE) K= 27.11
-2.000
PRO. 6"
WATERLINE
CONNECT TO
PRO.
PROP
C/L ROADWAY GRADE
6" WATERLI14E
SEE S' ET
EX. GROUND AT
ROADWAY C/L
\
6°
DR 21
\
R�rN
3' MIN COVER—
F. H.
VER
(TYP)
PV
1-2"GV
BLOW -OFF ASSEMBLY
END 017
LINE
EX. GROUND AT
ROADWAY C/L
PROP. C/L ROADWAY
GRADE
LO ON
O
CO t0
CO M
tor\
O
O'd
CO M
In
M M
ON
O
00 I�
M
Cl) M
-qf'-
to
I�
C"
Cl) M
0)
to
Lo M
c
co M
Cl)
Cn N
to O
M M
OC")
tb
t=
O
co to
M M
MO
V)
M O
Ch
M M
1-CA
I�
00 I�
Cn
C'') M
N
N
CO O
V �
M M
V ~f,
to
Lo
a'
Cl) M
�00
('') M
c
co M
Oc0
�- InO
Cn
M M
�N
O O
Cn
C'� M
OI-
pp
Cn M
M M
00
to
1� tp
M t..)
Cl) M
Cp
co
M
400+00 401+00
402+00
403+00
404+00
405+00
406+00
407+00
408+00
370
365
360
355
350
345
340
335
330
325
320
409+00
5
VERTICAL SCALE: 1" = 5'
0
50 0 25 50 100
HORIZONTAL SCALE: 1" = 50'
.J THOMAS ENGINEERING, INC.
CIVIL ENGINEERING
&
PLANNING
143 Charlotte Avenue,
Suite 104
Sanford, North
Carolina
27330
(919)777-6010
phone
www.jthomasengineering.com
license no.
C-3389
PROFESSIONAL ENGINEER'S SEAL
04
� az
o
+
W z
�0
J
0)
W
V z
�c
o
It
z Q
a
Q
Q
a 1:
J
V
cn
O �=
� J H
�
O
J
a
W
�
� o
ZW
> 'zp
LLD
0 WWz
�+
w
O
O
J p�
V
W
Za�z
zQ
QF---
Jcn
Q�
� z aO
V
w
W
H
>
Q
Z
W
W
w
CD
z
a
'<
REVISIONS
13 JUN 2022: PER COMMENTS RECEIVED
IN 1ST
SUBMITTAL TO REGULATORY AGENCIES.
14 JUL 2020: REVISIONS PER COMMENTS RECEIVED IN
2ND SUBMITTAL TO HRW.
11 AUG 2022: REVISIONS PER COMMENTS
3RD SUBMITTAL TO HRW.
RECEIVED IN
26 SEP 2022: PER COMMENTS RECEIVED FROM NCDEQ
STORM WATER.
AGENCY REVIEW ONLY
Scale:
Drawn
by:
SEE SCALE BAR
JRT
Sheet:
Designed
by:
JRT
8 18
Reviewed by:
JRT
of
Project Number:
Date:
21-002
30 MAR 2022