Loading...
HomeMy WebLinkAboutNCC204805_NOT Closeout Documents (2)_20220927North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Gaston Project: Stonewater Tie, Riverbend Upper 230 River basin: Catawba Person financially responsible: Duke Energy Carolinas, LLC - Michael D Project #: GASTO-2021-008 Robinson, Manager, Transmission Engineering Address: 526 South Church Street, PO Box 1006, Charlotte, NC 1. Project Location: Steam Plant Road, Mount Holly Pictures: Yes - Digital 2. Weather and soil conditions: Rain, Wet Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): David Galloway Inspection report: Sent Report 9. Corrective action needed: Title: Superintendent Date given/sent: February 24, 2022 10. Comments: On February 24, 2022, this site was inspected for compliance. During the inspection, ground cover sufficient to restrain erosion was observed on 80% or greater of the site. Please proceed with the removal of temporary erosion control measures and stabilization as per the approved construction sequence for the project. Please contact this office for a re -inspection once permanent ground cover sufficient to restrain erosion has been established on all areas of the site Reported by: Tyler Pearson Others present: Date of inspection: February 24, 2022 Time arriving on site: 8:45 AM Time leaving site: 10:45 AM cc: