Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-09137_Well Construction - GW1_20220930
WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information: Ricky Corriher --- FROM TO DESCRLPTION Well Contractor Name 21 .2n� 2464-A ft. `� i NC Well Contractor Certification Number - .-a. Frank A. Corriher& Sons Well Drilling, Inc. OM DIAMETER THICKNESS MATERIAL tL ft in. Company Name FROM TO DL4ME 2.Well Construction Permit#: 7 TER TjucxivEss MATERIAL List all applicable well construction permits t.e.UIC,County,State,Variance,etc.) +1 �7 ft tL 6 �8 ;y 1° SDR-21 PVC 3.Well Use(check well use): - ft. S C f Water Supply Well: FROM TO DIAMETER SLOT SIZE TffiCIINESS MATERIAL. ❑Agricultural ow cipaMblic fL fL in. ❑Geothermal(Heating/Cooling Supply) esid-eiZI Water Supply(single) g• fL in. ❑Industrial/Commercial ❑Residential Water Supply(shared) ❑Irri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: O ft 22 tL Bentonite Hole Plug ❑Monitoring ❑Recovery fL ft. Injection Well: ft. ft Q J ❑Aquifer Recharge ❑Groundwater Remediation ._ ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENTMETHOD ❑Aquifer Test ❑Stormwater Drainage ft tL ❑Experimental Technology ❑Subsidence Control ft ft ❑Geothermal(Closed Loop) ❑Tracer '0 atta o ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color hardness,soWroek type,grain s' eta (� t!:;, tL "Yt7 It. 4)Gv 4.Date Well(s)Completed: Vl/ Well ID# w m 5a ll Locatio l > 30 &AE' fL ft. Facili /Owner Name —o Facility ID#(ifapplicable) ft ft w fL fL HE 3 2022 Physi_I Addyess,City,and Zip ft. tL County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one ItUlong is sufficient) / 22.Ce ation• 35(� Q ' N 80p-QS -- w 6.Is(are)the well(s): 0 ermanent or ❑Temporary Signature of Ce ed Well Contractor Date By signing this form,I herebv certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or lti 0 15A NCAC 01C.0100 or 15A NCAC 01C.0100 Well Construction Standards and that a copv If this is'a repair,fill out known well construction information and explain the nature of the of this record has beer.provided to the well owner. repair under#11 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 39 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft.) For multiple wells list all depths ifdifferent(example-3©200'and 2@100) Submit this GW-1 within 30 days of well completion per the following: 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifwater level is above casing,use 6" 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 11.Borehole diameter: (in.) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Drill 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA Air Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) (C Vop Method of test: f n 13b.Disinfection type: Sterllene Amount: Form GaW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 I