Loading...
HomeMy WebLinkAbout310349_Sludge Survey (Other)_20221006RECEIVED SEP 26 2022 NC DEQ/DWR PLAN OF ACTION (POA) FOR LAGOON SLUDGE Rthereffehr Facility Number: 31 - 349 County: Duplin Facility Name: Benny Kennedy - New Ground Farm Certified Operator Name: Christopher A. Turneroperator#: AWA 26079 **Attach a copy of Lagoon Sludge Survey Form and volume worksheets Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5_ Lagoon 6 a. Lagoon Name/ Identifier 1 b. Total Sludge Depth (ft) 5.07' c. Sludge Depth to be Removed for Compliance (ft) 0.40 d. Sludge Volume to be Removed (gallons) 129,517 e. Sludge PAN (Ibs/1000 gal) 1 0 f. Liquid PAN (Ibs11000 gal) 2.0 g. PAN of Sludge (Ibs) (d x e)/1000 1295.17 Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26. SPOA 3-22-2010 Page 1 of 2 NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe use is planned, specify the product to be used. In regards to my sludge problems noted on this farm I am aware and will remove sludge as soon as can afford to do so. I do not have pigs right now and don't know if I will get any back. I realize I will have to incorporate a sludge maintenance plan to land apply any sludge. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey indicating non-compliance. Sludge Survey Date: 6/8/2022 Benny Kennedy Facility Owner/Manager (print) Facility k • ner/Manager (si Compliance Due Date: 8/8/2024 Phone: Date: 9/23/2022 Return this form to: Animal Feeding Operations Unit NC Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 SPOA 3-22-2010 Page 2 of 2