Loading...
HomeMy WebLinkAboutNCG520083_BIMS Inspection Report_20221003EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NCG520083 22/09/19 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 3 N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Calico Pit 4338 Calico Rd Lenoir NC 28645 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 12:00PM 22/09/19 21/03/01 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data 01:00PM 22/09/19 25/07/31 Name, Address of Responsible Official/Title/Phone and Fax Number David Hoffman,711 Complex Pl Lenoir NC 28645//828-754-5582/8287540188 Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Operations & Maintenance Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Brett Laverty DWR/Division of Water Quality/828-296-4500/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 DocuSign Envelope ID: B5F2BD7D-B38D-4589-967C-B2725472B137 10/3/2022 10/5/2022 NPDES yr/mo/day 22/09/19 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The site was inspected on Monday September 19, 2022, by Brett Laverty in the Asheville Regional Office. The dredge area extends approximately 650 feet along Lower Creek [11-39-(6.5)], which is a Class C and water supply IV stream. According to Mr. Hoffman, the site was last dredged in 2021. Currently, the stream bank is steep but well vegetated with kudzu. There were no signs of severe erosion or instability. The top of the stream bank is diked with a layer of sand to keep field runoff from discharging over the bank and causing severe erosion. According to Mr. Hoffman, the dikes remain in place during active dredging to prevent discharges to the stream from the dewatering sand piles. In other words, the dikes promote infiltration rather than runoff to the stream. Water samples were not collected during the last permit cycle due to the lack of discharges to Lower Creek. The permit requires warning signs to be placed on Lower Creek, a short distance upstream of the dredging operation to warn canoeists and recreation users of the operation. No signage was visible on the day of the inspection. Overall, the site appears to be stable with no serious compliance issues. NCG520083 17 (Cont.) Page#2 DocuSign Envelope ID: B5F2BD7D-B38D-4589-967C-B2725472B137 Permit:NCG520083 Inspection Date:09/19/2022 Owner - Facility: Inspection Type: Calico Pit Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Page#3 DocuSign Envelope ID: B5F2BD7D-B38D-4589-967C-B2725472B137