HomeMy WebLinkAbout20130777_Email_20141029Wanucha, Dave
From: Slaughter, Johnathan H
Sent: Wednesday, October 29, 2014 9:54 AM
To: Wanucha, Dave
Subject: RE: R -3101 sediment loss follow -up Site 41
Bullet I has been addressed. The issue of why it wasn't already done prior to your arrival has also been addressed with
the project superintendent's boss. We aren't going to tolerate that.
From: Wanucha, Dave
Sent: Wednesday, October 29, 2014 9:36 AM
To: Slaughter, Johnathan H
Cc: Souther, Zachary S; Johnston, Gregory W
Subject: R -3101 sediment loss follow -up Site 41
Heath,
Thanks for taking the time to review the project and explain some of the issues you all have encountered. As I
understand it from our site visits on October 27, there were a few tasks we discussed that need to be completed relative
to the sediment loss that occurred following the 5.9 inch storm event over a 4 -day period (Oct 13 —16).
• The debris and sediment that remain in the riparian area along the fence line near the culvert under US 21 need
to be removed, the trib redirected to its original channel and organic core fiber matting laid;
• At the waste site, remove captured sediment from northern basin and repair /reconstruct as needed;
• At the waste site, repair /reconstruct the southern basin as needed; and,
• Several slope drains along US 21 need to be repositioned to discharge at the same elevation as the wattle energy
dissipaters.
The NDPES records reviewed on site were compliant and all other areas we reviewed looked to be in order. When you
get the chance, please rescan the waste site plans and send electronically. The plans you sent previously were cut -off to
8 % x 11 rendering the plan sheets unreadable for the most part.
Let me know if the above listed tasks were not as discussed.
Dave W
Please be advised: Beginning October 23, 2014, the Winston Salem Regional Office (WSRO) of the NC Department of Environment
and Natural Resources (NCDENR) will begin moving to a new location. Starting October 22, 2014 at 5:00 pm, our new main
telephone number will change to 336 -776 -9800. If you contact staff" at their prvious telephone number, you will be directed to their
new direct telephone number. All regional office services, including file review, will continue and all appointments need to be
prescheduled with WSRO staff' during this transition. If you have any questions or concerns, please contact the main number provided
above during our normal hours of operation, 8:00 aim to 5:00 pm.
I'f'ective October 22, 20 Id at 5::00 pin, aia� ollice tdelnhone number will change to 335 "176 97031
Dave Wanucha
NC DENR Winston Salem Region Office
NC Division of Water Resources
Transportation Permitting Unit
Winston - Salem, NC
Cell (336) 403 -5655
01'fice )336) T76 9703
E-mail correspondence to and from this address may besubject
to the North Carolina Public Records Law and may be disclosed to third parties.
smallomrr*qwna*ncwm and nnmmImeona*,immuNwommww o puumpZcon:JmI mw and may u*aimmmwammli'dpmmwm