HomeMy WebLinkAboutSW3210302_Supplement-EZ Form_20221005SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name
2 Project Area (ac)---------
3 Coastal Wetland Area (ac)
P
Surface Water Area ac)
Is this roect Hi h or Low Densit ?
Does this project use an off -site SCM?
COMPLIANCE WITH 02H .1003(4)
7 Width of vegetated setbacks provided (feet) N/A
8 1 Will the vegetated setback remain vegetated? N/A
9 If BUA is proposed in the setback, does it meet NCAC 02H. 1 003(4)(c-d)? N/A _
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
1
Infiltration S stem
12
1 Bioretention Cell
_
13
JWet Pond
14
1 Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
_
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
1 Treatment Swale
22
Dry Pond
StormFilter
Silva Cell
23
24
25
Bayfilter
26
Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title:Daniel Shabelde_en, Engineer
28
Or anization:
Shabeldeen Engineering, PA
29
Street address:
3145 Tate Blvd. SE
Cit ,State, Zip:
Hickory, NC 28602
31
Phone numbers :
828.320.7252
32
Email:
dan@shabeldeen-engineering.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Signatur f Designer
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so number of low densit drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
343,879
6
Onsite drainage area (sq ft)
338,379
7
Offsite drainage area (sq ft
5,058
8
Total BUA in project (sq ft)
290,479
9
New BUA on subdivided lots (subject to permitting)
(sq ft
sf
10permitting)
New BUA not on subdivided lots (subject to
s
sf
11
Offsite BUA (sq ft
sf
12
Breakdown of new BUA not on subdivided lots:
Parkin (sq ft
6822 sf
Sidewalk (sq ft)
sf
Roof (sq ft
27000 sf
Roadway s ft
18384 sf
Future (sq ft
sf
Other, please specify in the comment box
below (sq ft
238273 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft
sf
15permitting)
Existing BUA that will remain (not subject to
s ft
sf
16
Existing BUA that is already permitted (sq ft
sf
17
Existing BUA that will be removed (sq ft
sf
18
Percent BUA
84%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
23633 cf
21
1 Calculation method for design volume
Simple
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Paved and gravel areas for equipment storage
WET POND
area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
I Yes
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
932.25
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
932.75
22
Elevation of the bottom of the vegetated shelf (fmsl)
940.00
23
Elevation of the permanent pool (fmsl)
940.00
24
Elevation of the top of the vegetated shelf (fmsl)
941.00
25
Elevation of the temporary pool (fmsl)
942.00
26
Surface area of the main permanent pool (square feet)
7526
27
Volume of the main permanent pool (cubic feet)
38008 cf
28
Average depth of the main pool (feet)
5.10 ft
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
5713 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
54 in
351
Design volume of SCM (cu ft)
24246 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2.5
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.1
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
66 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
fescue
54
Has a P antinq plan been provided for the vegetated shelf?
Yes
DITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 1 10:12 AM 10/5/2022