HomeMy WebLinkAbout20060796 Ver 2_13052-BMP Packet 10-31-14_20141104
BMP DRY DETENTION POND
DESIGNCALCULATIONS
WATERFORD ON THE ROCKY RIVER – PH 4
Kannapolis, Cabarrus County, North Carolina
Prepared for:
Lennar Carolinas, LLC
11230 Carmel Commons Blvd.
Charlotte, NC 28226
Prepared by:
DPR Associates, Inc.
420 Hawthorne Lane
Charlotte, NC 28204
P. 704-332-1204
F. 704-332-1210
www.dprassociates.net
DPR Project No.: 13052
May 23, 2014
Rev. October 8, 2014
10-08-2014
_____________________ _____________________
DPR Associates, Inc. David D. Sherrill, PE
WATERFORD ON THE ROCKY RIVER – PH 4
TABLE OF CONTENTS
I. BMP/ DRY DETENTION POND DESIGN SUMMARY
II. BMP EXHIBITS AND CALCULATIONS
- Vicinity Map
- Aerial Photo
- Pre-Development Drainage and TOC Map
- Post-Development Drainage Map
- Soils Maps – Overall Site
- Impervious Area Calculations
- Run-Off Curve Number
III. BMP DRY DETENTION POND DESIGN AND CALCULATIONS
- Water Quality Volume
- Pond Volume & Surface
- Orifice Sizing & Dewatering Calcs
- Bouyance Weight of Anchor Calcs
IV. BMP HYDROGRAGH ANALYSIS
- Hydrograph Summary Report
- Hydrograph Pond Report
- Hydrograph Report
V. BMP APPENDIX
- USGS Map
- Post-Construction Storm Water Ordinance Map
- Run-Off Curve Number Chart
I. BMP/DPDS
ETENTION ONDESIGN UMMARY
Waterford on the Rocky River – Ph. 4 Subdivision
BMP DRY POND DESIGN SUMMARY
DPR Project No. 13052
October 20, 2014
The enclosed calculation package is to show the results of the BMP design for the proposed
Waterford, Phase 4 development. This development is located in Kannapolis (Cabarrus
County), North Carolina, off of Jim Johnson Road just north of NC Highway 73. The subject site
is approximately 35.6 acres and the existing conditions consist of rolling topography of woods
and grass lands that drain towards Rocky River. There is an existing buffer along the river
designated as River Stream Overlay District that varies from 25’ to 65’ from top of bank and
shall be undisturbed. The site will be developed as a single family subdivision. Phase 4 is part
of the previous approved 2006 overall plan of approximate 160 ac. No stormwater management
plan was required at the time. The overall build-upon-area (BUA) is less than 24%.
The intent of the proposed storm water BMP design for Phase 4 was to provide a TSS removal
to a practical extent. The 2 BMP dry detention ponds were proposed to handle the First-Inch
rainfall volume of the drainage area on the east side of the project and designed per standards
in the NCDENR BMP manual. Additional measures such as grass swales feeding into the BMP
ponds and the concrete level spreaders were proposed. The existing vegetative buffer within
the River Stream Overlay District zone was to remain undisturbed to provide extra water quality
treatment and to function as a filter to further remove pollutants.
Two BMP facilities are proposed for the site. BMP – Dry Pond #1 drainage area is
approximately 2.5 ac., BMP – Dry Pond #2 drainage area is approximately 16.5 ac. These BMP
facilities are designed to treat and control the 1-Inch of runoff volume. The watershed basins
st
and hydraulic path feeding into the conveyance system were delineated using survey topo and
existing conditions. With this information, hydraulic lengths, time of concentrations (TOC), and
basin slopes were determined. ToC of 5 min. was used for all post-developed conditions. The
composite curve numbers (CN) were calculated based on the hydrologic soil types and groups
from the U.S. Department of Agriculture, SCS Cabarrus County for the pre-developed and post-
developed conditions. The total impervious areas of the development were also calculated.
The water quality volume of the 1 st –Inch of rainfall was quantified using the Schueler simple
method. Hydraflow Hydrograph models were developed to determine the peak flows and peak
times for the 1-inch, 6-hour storm event using SCS Unit Hydrograph for the 6-hour storm
distribution and the Kannapolis rainfall intensity in inches per hour. The 10-yr and larger storm
events were analyzed, though no peak discharge controls were proposed for these larger storm
events. Each BMP pond was sized to contain the runoff volume for the 1 inch of rainfall of a 6-
st
hour storm. A hybrid form of level spreader was implemented along the top of dam to alleviate
overflow for storm events with volumes greater than the 1 st inch.
The enclosed calculation package will highlight the results of the stormwater plan for the
proposed residential development. Detailed maps, calculations, results and details are
included. Please see the enclosed Construction Documents and details for additional
information. The estimated pollutant removal calculation (for TSS) is on the following page.
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-BMP Narrative.doc
With the combined use of dry detention ponds, grass swales, level spreader outfalls and a 30’
min. riparian buffer, based on the formula for BMP’s in series in chapter 3 of the NCDENR
Stormwater Management manual, the expected final TSS removal at each BMP is 88% (see
below).
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-BMP Narrative.doc
II. BMPEC
XHIBITS AND ALCULATIONS
Waterford Ph. 4DPR ASSOCIATESPrepared by : DDS
DPR Job #: 13052Time of ConcentrationChecked by: HVN
Location: Kannapolis, NC(Pre-Developed)Date: 3-28-14
Rev.: 10-8-14
Time of Concentration Calculation
BMP #1
Sheet Flow
grass
Surface Description (table 3-1)
n
, Manning's roughness coeff.0.24
L
, Flow Length (L<= 300 ft)150(ft.)
(CMSWDM # 2.6.5.2)
P
, Two-yr 24-hr rainfall3.48(in.)
2
Elevation (upper) =670
Elevation (lower) =657
s
, Land Slope (%)
0.087(ft./ft.)
0.40.2
VSL
, Velocity = 0.22()()0.2253(ft./sec.)
0.80.50.4
TnLPS10.53
Time of Concentration, = 0.42() / =(min.)
(CMSWDM # 2.6.5.3)
T2
Shallow Concentrated Flow
unpaved
Surface Description
(paved/unpaved)
L, Flow Length375.0(ft.)
(CMSWDM # 2.6.5.4)
Elevation (upper) =657
Elevation (lower) =639
s, Watercourse slope0.048(ft./ft.)
c
, Manning's surface coeff.
16.13(ft/sec.)
0.5
c
V, Average velocity = (S)
3.53(ft/sec.)
Time of Concentration, = L / (60 x V) =
1.77
T(min.)
(CMSWDM # 2.6.5.3)
t
Channel Flow:
Wetted Perimeter =15.00Bottom Width (ft) =2.4
Hydraulic Radius =1.1Side Slope (X:1) = 3.0
Manning's Coefficient (n) =0.048Depth (ft) =2.0
Elevation (upper) =641Flow Length (ft) =4
Elevation (lower) =640.1Channel Area (sf) =16.7
Channel Slope (%) =0.225
Velocity (fps) =1.58
(CMSWDM # 2.6.5.5)
0.04
T(t) (min.) =(min.)
Time =12 (min.)
Total Time of Concentration, T =12.30
(min.)
C
Hydraulic Length = 529
Basin Slope = 0.060
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-TOC-Pre-Devl.xls Sheet: 1 of 1
Waterford Ph. 4DPR ASSOCIATESPrepared by: DDS
DPR Job #: 13052Time of ConcentrationChecked by: HVN
Location: Kannapolis, NC(Pre-Developed)Date: 3-7-2014
Rev.: 10-8-14
Time of Concentration Calculation
BMP #2
Sheet Flow
grass
Surface Description (table 3-1)
n
, Manning's roughness coeff.0.24
L
, Flow Length (L<= 300 ft)200(ft.)
(CMSWDM # 2.6.5.2)
P
, Two-yr 24-hr rainfall3.48(in.)
2
Elevation (upper) =711
Elevation (lower) =701
s
, Land Slope (%)
0.050(ft./ft.)
0.40.2
VSL
, Velocity = 0.22()()0.1915(ft./sec.)
0.80.50.4
TnLPS16.51
Time of Concentration, = 0.42() / =(min.)
(CMSWDM # 2.6.5.3)
T2
Shallow Concentrated Flow
unpaved
Surface Description
(paved/unpaved)
L, Flow Length1000.0(ft.)
(CMSWDM # 2.6.5.4)
Elevation (upper) =701
Elevation (lower) =663
s, Watercourse slope0.038(ft./ft.)
c
, Manning's surface coeff.
16.13(ft/sec.)
0.5
c
V, Average velocity = (S)
3.15(ft/sec.)
Time of Concentration, = L / (60 x V) =
5.30
T(min.)
(CMSWDM # 2.6.5.3)
t
Channel Flow:
Wetted Perimeter =34.14Bottom Width (ft) =12.0
Hydraulic Radius =2.3Side Slope (X:1) = 3.0
Manning's Coefficient (n) =0.048Depth (ft) =3.5
Elevation (upper) =663Flow Length (ft) =400
Elevation (lower) =641Channel Area (sf) =78.8
Channel Slope (%) =0.055
Velocity (fps) =1.27
(CMSWDM # 2.6.5.5)
5.25
T(t) (min.) =(min.)
Time =22 (min.)
Total Time of Concentration, T =21.81
(min.)
C
Hydraulic Length = 1,600
Basin Slope = 0.044
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-TOC-Pre-Devl.xls Sheet: 1 of 1
Project: Waterfod - Ph. 4 DPR ASSOCIATES, INC Prepared by: DDS
DPR Job #: 13052Checked by: HVN
Impervious Estimates
Location: Kannapolis, NCDate: 6-24-14
Travertine - BMP #1
Rev.: 10-8-14
Estimated Impervious Area Breakdown - PHASE 4-Travertine Trail - BMP #1
3,400 sf x 8.5 lots………………………………………………………………………28,900 sq ft=0.66 ac
(Avg. lot pad = 2,710 sf + 18'x25' D/W + 4'x10' sidewalk + 100 sf patio + 100 sf misc. allocation)
Streets:
Streets:
Streets & Sidewalks0,000 sq ft=0.00 ac
00,000 sq ft=0.00 ac
0,000 sq ft=0.00 ac
…0,000 sq ft=0.00 ac
Sidewalk (one side Phase 4B only):……………………………………………
Additional Impervious (Driveway within street R/W)
(Approx. 20 ft x 8 ft x 50 lots): ………………………………………………0,000 sq ft=0.00 ac
0,000 sq ft0.00 ac
Sub-Total
Pond @ W. S. ……………………………………………………………………..
0,000 sq ft=0.00 ac
Existing:
0,000 sq ft=0.00 ac
Total Impervious Are28,900 sq ft=0.66 ac
a
…………………………………………………………………
BMP 2 Site Area=…………………………………………….…………………………………………………..2.50 ac
24% Threshold………………………….…………………………………………………..0.60 ac
BMP Watershed Area=………………..…………..………………………………………………………………..2.50 ac
Impervious Area Summary
Imperv. Area% of Imp. Area of % of Imp. Area of
(Ac) Site AreaWS Area
Single Family0.6626.54%26.54%
Streets0.000.00%0.00%
Pond @ WS0.000.00%0.00%
Existing0.000.00%0.00%
Total0.6626.54%26.54%
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-Impervious Calcs.xlsplotted: 10/15/2014Sheet 1 of 1
Project: WATERFORD - PH 4 B DPR ASSOCIATES, INC Prepared by: DDS
DPR Job #: 13052Checked by: HVN
Impervious Estimates
Location: Kannapolis, NCDate: 6-24-14
Travertine - BMP #2
Rev.: 10-8-14
Estimated Impervious Area Breakdown - PHASE 4-B only (Travertine Trail)
3,400 sf x 41.5 lots………………………………………………………………………141,100 sq ft=3.24 ac
(Avg. lot pad = 2,710 sf + 18'x25' D/W + 4'x10' sidewalk + 100 sf patio + 100 sf misc. allocation)
Streets:
Streets:
Streets & Sidewalks94,928 sq ft=2.18 ac
00,000 sq ft=0.00 ac
0,000 sq ft=0.00 ac
…0,000 sq ft=0.00 ac
Sidewalk (one side Phase 4B only):……………………………………………
Additional Impervious (Driveway within street R/W)
(Approx. 20 ft x 8 ft x 50 lots): ………………………………………………10,000 sq ft=0.23 ac
104,928 sq ft2.41 ac
Sub-Total
Pond @ W. S. ……………………………………………………………………..
0,000 sq ft=0.00 ac
Existing:
0,000 sq ft=0.00 ac
Total Impervious Are246,028 sq ft=5.65 ac
a
…………………………………………………………………
BMP 2 Site Area=…………………………………………….…………………………………………………..15.40 ac
24% Threshold………………………….…………………………………………………..3.70 ac
BMP Watershed Area=………………..…………..………………………………………………………………..15.40 ac
Impervious Area Summary
Imperv. Area% of Imp. Area of % of Imp. Area of
(Ac) Site AreaWS Area
Single Family3.2421.03%21.03%
Streets2.4115.64%15.64%
Pond @ WS0.000.00%0.00%
Existing0.000.00%0.00%
Total5.6536.68%36.68%
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-Impervious Calcs.xlsplotted: 10/15/2014Sheet 1 of 1
Project: Waterford Ph. 4Prepared by: DDS
DPR ASSOCIATES, INC
DPR Job No.: 13052Checked by: HVN
RUN-OFF CURVE NUMBER
Location: KannapolisDate: 10-08-2014
(Charlotte-Meck Storm Water Design Manual
Pre-Developed CN for BMP #1
Total Drain. Area (Ac.)
1.50
Percentage
Site Soil TypeSoil Groupof Basin
CeB, ChA0%
B
EnB, PoDC100%
Hydrologic Soil Group Use
d
Percent of CN for WeightedCNWeightedTotalWeighted
Land UseNo. AcresDrainage AreaGroup BCNGroup CCNWeighted CN CN %
Grass land (Good Cond.)0.0%610.07474.074.00.0
0
Wood (Good Cond.)1.5100.0%550.07070.070.070.0
100%70.0
Tota
1.5
l
Composite Curve Number
(CN):
70
Post-Developed CN for BMP #1
Total Drain. Area (Ac.)
2.60
Percentage
Site Soil TypeSoil Groupof Basin
CeB, ChA12%
B
EnB, PoDC88%
Hydrologic Soil Group Used
Percent of CN for WeightedCNWeightedTotalWeighted
Land UseDrainage AreaGroup BCNGroup CCNWeighted CN CN %
No. Acres
Impervious (Onsite)32.7%9812.19885.998.032.0
0.85
Open space (Good Cond.)1.7567.3%617.57464.972.448.7
Tota100%80.8
2.60
l
Composite Curve Number
(CN):
81
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-CN.xls Sheet: 1 of 1
Project: Waterford Ph. 4Prepared by: DDS
DPR ASSOCIATES, INC
DPR Job No.: 13052Checked by: HVN
RUN-OFF CURVE NUMBER
Location: KannapolisDate: 10-08-2014
(Charlotte-Meck Storm Water Design Manual
Pre-Developed CN for BMP #2
Total Drain. Area (Ac.)
16.00
Percentage
Site Soil TypeSoil Groupof Basin
CeB, ChA27%
B
EnB, PoDC73%
Hydrologic Soil Group Use
d
Percent of CN for WeightedCNWeightedTotalWeighted
Land UseNo. AcresDrainage AreaGroup BCNGroup CCNWeighted CN CN %
Grass land (Good Cond.)50.5%6116.57454.070.535.6
0
Wood (Good Cond.)1.549.5%5514.97051.166.032.6
100%68.2
Tota
1.5
l
Composite Curve Number
(CN):
68
Post-Developed CN for BMP #2
Total Drain. Area (Ac.)
15.00
Percentage
Site Soil TypeSoil Groupof Basin
CeB, ChA35%
B
EnB, PoDC66%
Hydrologic Soil Group Used
Percent of CN for WeightedCNWeightedTotalWeighted
Land UseDrainage AreaGroup BCNGroup CCNWeighted CN CN %
No. Acres
Impervious (Onsite)39.0%9833.89864.298.038.2
5.85
Open space (Good Cond.)9.1561.0%6121.07448.569.542.4
Tota100%80.6
15.00
l
Composite Curve Number
(CN):
81
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-CN.xlsSheet: 1 of 1
III. BMPDPD&C
ETENTION OND ESIGN ALCULATIONS
Project: Waterford Phs. 4 DPR ASSOCIATES, INC Prepared By: DDS
Job No.: 13052Checked By: HVN
DRY POND DESIGN
Location: Kannapolis, NCDate: 6-24-14
Rev.10-14-14
DESIGN CRITERIA PER KANNAPOLIS BMP ORDINANCE
* BMP PH 4 - DRY DETENTION POND #1
* Total Drainage Area (A) PHASE 4A:2.65ac
27.0%
* Total Impervious Area "A imp" USED =0.72ac
(See attached Impervious Calcs)
* Total Water Quality Volume To Treat (First 1" of Rainfall):
WQ = (P/12) (A) (R) (43560) =
2,819
cf
vv
(Simple Method, Schueler)
P: Water Quality Design Storm, 1st Inch of Rainfall 1inch
A: Drainage Area (Impervious Area Only)2.65ac.
R: 0.05 + 0.009 (I) = 0.293
v
I: % of Impervious Area27.0%
* Estimated Storm Water Volume 1-yr, 6-hr Post-Dev:
Qv = (P-0.2S)^2/ (P+0.8S) * A * (43560/12) =
6,123cf
(SCS Method)
2.05inch
P: Design Storm, 1-yr 6-hr Storm Rainfall depth
2.65ac.
A: Drainage Area
2.35inch
S = 1000/CN-10 =
81
CN: Curve Number
* Estimated Storm Water Volume 10-yr, 6-hr Post-Dev:
Qv = (P-0.2S)^2/ (P+0.8S) * A * (43560/12) =
18,365cf
(SCS Method)
3.56inch
P: Design Storm, 10-yr 6-hr Storm Rainfall depth
2.65ac.
A: Drainage Area
2.05inch
S = 1000/CN-10 =
83
CN: Curve Number
BMP Storage Volume Provided:
StageSurface AreaIncremental StorageTotal Storage
(ft) (sf)(cf)(cf)
Bottom of Pond
639.050000
640.01,5001,0001,000
Top of Dam
641.02,5002,0003,000
Static Water Quality Evelation @640.91ft
* Orifice Calcs For Detawering Time 2 days (48 hrs)
cf
2,819
1-in Storm Volume
sf
1,476
Average Surface Area
Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)^(1/2))
(NCDENR, Orifice Equation)
0.005
a =where:
A= Resevoir Area, sf1,476
0.95
Max. Orifice Diameter (inch), d =h= Falling Head, ft1.91
c= Discharge Coefficient0.6
1.0t= Time (48 Hrs), sec.
Orifice Diameter (inch) Used, d =172,800
g= Accelleration, ft/sq.sec32.2
a= Orifice Area (sf)
d= Orifice Diameter (inch)
printed 11/3/2014
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-BMP WQ.xlspage 1 of 1
Project: Waterford Phs. 4 DPR ASSOCIATES, INC Prepared By: DDS
Job No.: 13052Checked By: HVN
DRY POND DESIGN
Location: Kannapolis, NCDate: 6-24-14
Rev.10-14-14
DESIGN CRITERIA PER KANNAPOLIS BMP ORDINANCE
* BMP PH 4 - DRY DETENTION POND #2
* Total Drainage Area (A) PHASE 4A:15.35ac
36.7%
* Total Impervious Area "A imp" USED =5.63ac
(See attached Impervious Calcs)
* Total Water Quality Volume To Treat (First 1" of Rainfall):
WQ = (P/12) (A) (R) (43560) =
21,191
cf
vv
(Simple Method, Schueler)
P: Water Quality Design Storm, 1st Inch of Rainfall 1inch
A: Drainage Area (Impervious Area Only)15.35ac.
R: 0.05 + 0.009 (I) = 0.380
v
I: % of Impervious Area36.7%
* Estimated Storm Water Volume 1-yr, 6-hr Post-Dev:
Qv = (P-0.2S)^2/ (P+0.8S) * A * (43560/12) =
35,464cf
(SCS Method)
2.05inch
P: Design Storm, 1-yr 6-hr Storm Rainfall depth
15.35ac.
A: Drainage Area
2.35inch
S = 1000/CN-10 =
81
CN: Curve Number
* Estimated Storm Water Volume 10-yr, 6-hr Post-Dev:
Qv = (P-0.2S)^2/ (P+0.8S) * A * (43560/12) =
106,378cf
(SCS Method)
3.56inch
P: Design Storm, 10-yr 6-hr Storm Rainfall depth
15.35ac.
A: Drainage Area
2.05inch
S = 1000/CN-10 =
83
CN: Curve Number
BMP Storage Volume Provided:
StageSurface AreaIncremental StorageTotal Storage
(ft) (sf)(cf)(cf)
Bottom of Pond
636.08,50000
637.010,5009,5009,500
Top of Pond
638.013,00011,75021,250
Static Water Quality Evelation @637.99ft
* Orifice Calcs For Detawering Time 2 days (48 hrs)
cf
21,191
1-in Storm Volume
sf
10,622
Average Surface Area
Area of Outlet Orifice (sf), a =(2)(A)h^(1/2))/(c)(t)(2g)^(1/2))
(NCDENR, Orifice Equation)
0.036
a =where:
A= Resevoir Area, sf10,622
2.58
Max. Orifice Diameter (inch), d =h= Falling Head, ft1.99
c= Discharge Coefficient0.6
2.0t= Time (48 Hrs), sec.
Orifice Diameter (inch) Used, d =172,800
g= Accelleration, ft/sq.sec32.2
a= Orifice Area (sf)
d= Orifice Diameter (inch)
T:\PROJECTS\2013 PROJECTS\13052\CALCS\BMP\13052-BMP WQ.xlspage 1 of 1
IV. BMPHA
YDROGRAPH NALYSIS
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8
Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph
No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription
(origin)(cfs)(min)(min)(cuft)(ft)(cuft)
2SCS Runoff0.0002n/a0------------------BMP #1, Pre-Developed, MARR
4SCS Runoff0.4921147972------------------BMP/Dry Det. Pond 1, Post Dev 1inch
5Reservoir0.02212929554639.81807BMP 1 Routed 1inch-6hr
10SCS Runoff0.0002n/a0------------------BMP #2, Pre-Developed, MARR
12SCS Runoff2.84811475,629------------------BMP/Dry Det. Pond 2, Post Dev 1inch
13Reservoir0.08912935,24512636.535,014BMP 2 Routed 1inch-6hr
13052-Hydraflow-BMPs-WQ.gpwReturn Period: 3 YearMonday, Nov 3, 2014
Pond Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Pond No. 1 - Dry Detention Pond #1
Pond Data
Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 639.00 ft
Stage / Storage Table
Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft)
0.00639.0050000
1.00640.001,5001,0001,000
2.00641.002,5002,0003,000
Culvert / Orifice StructuresWeir Structures
[A][B][C][PrfRsr][A][B][C][D]
= 4.001.000.000.00= 0.000.000.000.00
Rise (in)Crest Len (ft)
= 4.001.000.000.00= 0.000.000.000.00
Span (in)Crest El. (ft)
No. Barrels= 1100Weir Coeff.= 3.333.333.333.33
Invert El. (ft)= 639.00639.000.000.00Weir Type= ------------
= 20.000.500.000.00= NoNoNoNo
Length (ft)Multi-Stage
Slope (%)= 0.500.000.00n/a
N-Value= .013.013.013n/a
= 0.600.600.600.60= 0.000(by Contour)
Orifice Coeff.Exfil.(in/hr)
= n/aYesNoNo= 0.00
Multi-StageTW Elev. (ft)
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
StageStorageElevationClv AClv BClv CPrfRsrWr AWr BWr CWr DExfilUserTotal
ftcuftftcfscfscfscfscfscfscfscfscfscfscfs
0.000639.000.000.00------------------------0.000
0.10100639.100.01 ic0.01 ic------------------------0.006
0.20200639.200.01 ic0.01 ic------------------------0.010
0.30300639.300.01 ic0.01 ic------------------------0.013
0.40400639.400.02 oc0.01 ic------------------------0.015
0.50500639.500.02 oc0.02 ic------------------------0.017
0.60600639.600.02 oc0.02 ic------------------------0.019
0.70700639.700.02 oc0.02 ic------------------------0.020
0.80800639.800.02 oc0.02 ic------------------------0.022
0.90900639.900.02 oc0.02 ic------------------------0.023
1.001,000640.000.03 oc0.02 ic------------------------0.025
1.101,200640.100.03 oc0.03 ic------------------------0.026
1.201,400640.200.03 oc0.03 ic------------------------0.027
1.301,600640.300.03 oc0.03 ic------------------------0.029
1.401,800640.400.03 oc0.03 ic------------------------0.030
1.502,000640.500.03 oc0.03 ic------------------------0.031
1.602,200640.600.03 oc0.03 ic------------------------0.032
1.702,400640.700.03 oc0.03 ic------------------------0.033
1.802,600640.800.03 oc0.03 ic------------------------0.034
1.902,800640.900.04 oc0.03 ic------------------------0.035
2.003,000641.000.04 oc0.04 ic------------------------0.036
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 2
BMP #1, Pre-Developed, MARR
Hydrograph type= SCS RunoffPeak discharge= 0.000 cfs
Storm frequency= 3 yrsTime to peak= n/a
Time interval= 2 minHyd. volume= 0 cuft
Drainage area= 1.550 acCurve number= 70
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 12.00 min
Total precip.= 2.64 inDistribution= Synthetic
Storm duration= 6.00 hrsShape factor= 484
BMP #1, Pre-Developed, MARR
Q (cfs)Q (cfs)
Hyd. No. 2 -- 3 Year
0.100.10
0.090.09
0.080.08
0.070.07
0.060.06
0.050.05
0.040.04
0.030.03
0.020.02
0.010.01
0.000.00
020406080100120
Time (min)
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 4
BMP/Dry Det. Pond 1, Post Dev 1inch-6hr Storm
Hydrograph type= SCS RunoffPeak discharge= 0.492 cfs
Storm frequency= 3 yrsTime to peak= 147 min
Time interval= 1 minHyd. volume= 972 cuft
Drainage area= 2.650 acCurve number= 81
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 1.00 inDistribution= Custom
Storm duration= Custom Storm.cdsShape factor= 484
BMP/Dry Det. Pond 1, Post Dev 1inch-6hr Storm
Q (cfs)Q (cfs)
Hyd. No. 4 -- 3 Year
0.500.50
0.450.45
0.400.40
0.350.35
0.300.30
0.250.25
0.200.20
0.150.15
0.100.10
0.050.05
0.000.00
0306090120150180210240270300
Time (min)
Hyd No. 4
Precipitation Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 4
BMP/Dry Det. Pond 1, Post Dev 1inch-6hr Storm
Storm Frequency= 3 yrsTime interval= 1 min
Total precip.= 1.0000 inDistribution= Custom
Storm duration= Custom Storm.cds
Incremental Rainfall Precipitation
Precip (in)Precip (in)
Hyd. No. 4 : BMP/Dry Det. Pond 1, Post Dev 1inch-6hr Storm - 3 Year
0.100.10
0.090.09
0.080.08
0.070.07
0.060.06
0.050.05
0.040.04
0.030.03
0.020.02
0.010.01
0.000.00
0306090120150180210240270300
Time (min)
Custom Design Storm -- Custom Storm.cds
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 5
BMP 1 Routed 1inch-6hr
Hydrograph type= ReservoirPeak discharge= 0.022 cfs
Storm frequency= 3 yrsTime to peak= 292 min
Time interval= 1 minHyd. volume= 955 cuft
Inflow hyd. No.= 4 - BMP/Dry Det. Pond 1, Post Dev 1inch-6hr StormMax. Elevation= 639.81 ft
Reservoir name= Dry Detention Pond #1Max. Storage= 807 cuft
Storage Indication method used.
BMP 1 Routed 1inch-6hr
Q (cfs)Q (cfs)
Hyd. No. 5 -- 3 Year
0.500.50
0.450.45
0.400.40
0.350.35
0.300.30
0.250.25
0.200.20
0.150.15
0.100.10
0.050.05
0.000.00
018036054072090010801260144016201800
Time (min)
Hyd No. 5Hyd No. 4Total storage used = 807 cuft
Pond Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Pond No. 4 - BMP Dry Detention Pond #2
Pond Data
Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 636.00 ft
Stage / Storage Table
Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft)
0.00636.008,50000
1.00637.0010,5009,5009,500
2.00638.0013,00011,75021,250
Culvert / Orifice StructuresWeir Structures
[A][B][C][PrfRsr][A][B][C][D]
= 4.002.500.000.00= 0.000.000.000.00
Rise (in)Crest Len (ft)
= 4.002.500.000.00= 0.000.000.000.00
Span (in)Crest El. (ft)
No. Barrels= 1100Weir Coeff.= 3.333.333.333.33
Invert El. (ft)= 636.00636.000.000.00Weir Type= ------------
= 20.000.500.000.00= NoNoNoNo
Length (ft)Multi-Stage
Slope (%)= 0.500.000.00n/a
N-Value= .013.013.013n/a
= 0.600.600.600.60= 0.000(by Contour)
Orifice Coeff.Exfil.(in/hr)
= n/aYesNoNo= 0.00
Multi-StageTW Elev. (ft)
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
StageStorageElevationClv AClv BClv CPrfRsrWr AWr BWr CWr DExfilUserTotal
ftcuftftcfscfscfscfscfscfscfscfscfscfscfs
0.000636.000.000.00------------------------0.000
0.10950636.100.01 oc0.01 ic------------------------0.013
0.201,900636.200.04 oc0.04 ic------------------------0.040
0.302,850636.300.06 oc0.06 ic------------------------0.058
0.403,800636.400.07 oc0.07 ic------------------------0.073
0.504,750636.500.09 oc0.09 ic------------------------0.086
0.605,700636.600.10 oc0.10 ic------------------------0.097
0.706,650636.700.11 oc0.11 ic------------------------0.106
0.807,600636.800.11 oc0.11 ic------------------------0.111
0.908,550636.900.12 oc0.12 ic------------------------0.121
1.009,500637.000.13 oc0.13 ic------------------------0.130
1.1010,675637.100.14 oc0.14 ic------------------------0.138
1.2011,850637.200.15 oc0.15 ic------------------------0.146
1.3013,025637.300.15 oc0.15 ic------------------------0.153
1.4014,200637.400.16 oc0.16 ic------------------------0.160
1.5015,375637.500.17 oc0.17 ic------------------------0.167
1.6016,550637.600.17 oc0.17 ic------------------------0.173
1.7017,725637.700.18 oc0.18 ic------------------------0.179
1.8018,900637.800.19 oc0.19 ic------------------------0.185
1.9020,075637.900.19 oc0.19 ic------------------------0.191
2.0021,250638.000.20 oc0.20 ic------------------------0.197
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 10
BMP #2, Pre-Developed, MARR
Hydrograph type= SCS RunoffPeak discharge= 0.000 cfs
Storm frequency= 3 yrsTime to peak= n/a
Time interval= 2 minHyd. volume= 0 cuft
Drainage area= 16.000 acCurve number= 68
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 22.00 min
Total precip.= 2.64 inDistribution= Synthetic
Storm duration= 6.00 hrsShape factor= 484
BMP #2, Pre-Developed, MARR
Q (cfs)Q (cfs)
Hyd. No. 10 -- 3 Year
0.100.10
0.090.09
0.080.08
0.070.07
0.060.06
0.050.05
0.040.04
0.030.03
0.020.02
0.010.01
0.000.00
020406080100120
Time (min)
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 12
BMP/Dry Det. Pond 2, Post Dev 1inch-6hr Storm
Hydrograph type= SCS RunoffPeak discharge= 2.848 cfs
Storm frequency= 3 yrsTime to peak= 147 min
Time interval= 1 minHyd. volume= 5,629 cuft
Drainage area= 15.350 acCurve number= 81
Basin Slope= 0.0 %Hydraulic length= 0 ft
Tc method= UserTime of conc. (Tc)= 5.00 min
Total precip.= 1.00 inDistribution= Custom
Storm duration= Custom Storm.cdsShape factor= 484
BMP/Dry Det. Pond 2, Post Dev 1inch-6hr Storm
Q (cfs)Q (cfs)
Hyd. No. 12 -- 3 Year
3.003.00
2.002.00
1.001.00
0.000.00
0306090120150180210240270300
Time (min)
Hyd No. 12
Precipitation Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 12
BMP/Dry Det. Pond 2, Post Dev 1inch-6hr Storm
Storm Frequency= 3 yrsTime interval= 1 min
Total precip.= 1.0000 inDistribution= Custom
Storm duration= Custom Storm.cds
Incremental Rainfall Precipitation
Precip (in)Precip (in)
Hyd. No. 12 : BMP/Dry Det. Pond 2, Post Dev 1inch-6hr Storm - 3 Year
0.100.10
0.090.09
0.080.08
0.070.07
0.060.06
0.050.05
0.040.04
0.030.03
0.020.02
0.010.01
0.000.00
0306090120150180210240270300
Time (min)
Custom Design Storm -- Custom Storm.cds
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8Monday, Nov 3, 2014
Hyd. No. 13
BMP 2 Routed 1inch-6hr
Hydrograph type= ReservoirPeak discharge= 0.089 cfs
Storm frequency= 3 yrsTime to peak= 293 min
Time interval= 1 minHyd. volume= 5,245 cuft
Inflow hyd. No.= 12 - BMP/Dry Det. Pond 2, Post Dev 1inch-6hr StormMax. Elevation= 636.53 ft
Reservoir name= BMP Dry Detention Pond #2Max. Storage= 5,014 cuft
Storage Indication method used.
BMP 2 Routed 1inch-6hr
Q (cfs)Q (cfs)
Hyd. No. 13 -- 3 Year
3.003.00
2.002.00
1.001.00
0.000.00
03006009001200150018002100240027003000
Time (min)
Hyd No. 13Hyd No. 12Total storage used = 5,014 cuft
V. BMPA
PPENDIX
HYDROLOGY
CHAPTER 2
Table 2-12
1
Runoff Curve Numbers
Curve numbers for
------------------------------Cover description -------------------------------- -----hydrologic soil group-----
Average percent
2/
Cover type and hydrologic condition impervious area A B C D
Fully developed urban areas (vegetation established)
3/
Open space (lawns, parks, golf courses, cemeteries, etc.) :
Poor condition (grass cover < 50%) .................... 68 79 86 89
Fair condition (grass cover 50% to 75%) ............ 49 69 79 84
Good condition (grass cover > 75%) ................... 39 61 74 80
Impervious areas:
Paved parking lots, roofs, driveways, etc.
(excluding right-of-way) ..................................... 98 98 98 98
Streets and roads:
Paved; curbs and storm sewers (excluding
right-of-way) ....................................................... 98 98 98 98
Paved; open ditches (including right-of-way) .... 83 89 92 93
Gravel (including right-of-way) .......................... 76 85 89 91
Dirt (including right-of-way) .............................. 72 82 87 89
Urban districts:
Commercial and business ............................................ 85 89 92 94 95
Industrial ..................................................................... 72 81 88 91 93
Residential districts by average lot size:
1/8 acre or less (town houses) ..................................... 65 77 85 90 92
1/4 acre ........................................................................ 38 61 75 83 87
1/3 acre ........................................................................ 30 57 72 81 86
1/2 acre ........................................................................ 25 54 70 80 85
1 acre ........................................................................... 20 51 68 79 84
2 acres ......................................................................... 12 46 65 77 82
Agricultural Lands
Woods
poor hydrologic condition ....................................... 45 66 77 83
fair hydrologic condition ......................................... 36 60 73 79
good hydrologic condition ...................................... 30 55 70 77
Developing urban areas
Newly graded areas
(pervious areas only, no vegetation) ........................... 77 86 91 94
1 Average runoff condition, and Ia = 0.2S.
e CNÓs. Other assumptions are as follows: impervious areas
2 The average percent impervious area shown was used to develop the composit
area directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open
space in good hydrologic condition.
CNÓs shown are equivalent to those of pasture. Composite CNÓs ma
3
Source: Source: 210-VI-TR-55, Second Edition, June 1986
2.4.5 Runoff Coefficient
The runoff coefficient (C) is the variable of the rational method least susceptible to precise
determination and requires judgment and understanding on the part of the design engineer. While
engineering judgment will always be required in the selection of runoff coefficients, typical
coefficients represent the integrated effects of many drainage basin parameters. Table 2-4 gives
the recommended runoff coefficients for the Rational Method.
Table 2-4
Recommended Runoff Coefficient Values
Description of Area Runoff Coefficient (C)
Lawns 0.30
Wooded 0.25
Streets 0.95
Gravel Areas 0.55
Drives, walks, roofs 0.95
Bare soils 0.45
Residential (including streets):
Single-Family (Lot < 20,000 square feet - SF) 0.60
Single-Family (Lot > 20,000 square feet - SF) 0.50
Multi-family, Attached 0.70
Industrial:
Light areas 0.70
Heavy areas 0.80
Office Parks 0.75
Shopping Centers 0.80
Note: The above runoff coefficients are valid for 2-year to 10-year storm frequencies
only. Coefficients must be accompanied with a C factor when used for less frequent,
f
higher intensity storms.