Loading...
HomeMy WebLinkAboutNCS000488_Valdese 2022 Annual Report_20220830Reporting Line Year BMP Measurable Goal Reporting Metric Comments No. (July 1 - Ref. June 30) Did Valdese submit the Annual Self -Assessment to NCDEQ prior to 1 1 1 August 31 each year? YES Did Valdese develop and distribute new fliers to raise general stormwater 9 1 3.B.1. awareness? YES If so, how many general stormwater awareness 10 1 3.B.1. fliers were distributed? 250 Did Valdese attend the annual Waldensian Festival to disperse stormwater outreach materials/awareness through the use of interactive educational 19 1 4.B.1. games and activities? YES If so, how many Waldensian Festival attendees were engaged in stormwater outreach/received 20 1 4.B.1. stormwater information? 400 Did Valdese provide additional outreach supplement or alternative outreach opportunities if the Waldensian annual Waldensian Festival 29 1 4.B.2. Festival was canceled? occurred. If so, how many attendees were engaged in additional/supplemental 30 1 4.B.2. stormwater outreach? Did Valdese have WPCOG provide instruction and stormwater educational 39 1 5.B.1. activities to youth? YES If so, how many WPCOG youth education activities/events were 40 1 5.B.1. provided? 2 If so, how many WPCOG youth event participants 41 1 5.B.1. were reached? 58 Did Valdese create a presentation covering stormwater topics to be presented in digital classrooms and/or 54 1 5.B.2. provided to teachers? YES If so, how many classroom presentations were provided by 55 1 5.B.2. teachers or staff? If so, how many students were reached by classroom 56 1 5.B.2. presentations? Did Valdese develop printed stormwater best practices materials for local government 69 1 6.B.1. distribution? YES Did Valdese provide one presentation about one of the six NPDES Minimum Control Measures at each annual WPCOG Water Quality 70 1 7.B.1. Conference? YES If so, how many attendees were reached during the annual WPCOG Water Quality Conference stormwater 71 1 7.B.1. presentation? 138 Did Valdese evaluate the target pollutants and audiences to identify Changes were where outreach can be not required at 80 1 8.B.1. improved? YES this time. If so, were any revisions made to target 81 1 8.B.1. pollutants? NO If so, were any revisions made to target 82 1 8.B.2. audiences? NO Did Valdese maintain and update the stormwater 95 1 10.B.1. program web page? YES Was the annual self - assessment uploaded to 96 1 10.13.2. stormwater website? YES Did any links, contact Updates have information, or been made to documents on the site, at time of stormwater web page report it is 97 1 10.13.2. need to be updated? NO accurate Did Valdese post the current SWMP, stormwater ordinance and annual assessment on the stormwater web 98 1 10.13.3. page? YES Did Valdese provide citizen education as part of the enforcement process for illicit discharges, illegal dumping and improper 111 1 11.13.3. disposal of waste? YES If so, how many educational citizen interactions were completed as part of the illicit discharge and illegal dumping enforcement 112 1 11.13.3. process? 5 Did Valdese identify specific staff who will serve as the hotline 121 1 12.13.1. contact(s)? YES Did Valdese maintain a hotline for stormwater complaints and 122 1 12.13.2. information? YES How many stormwater hotline calls were 123 1 12.13.3. received? 11 Did Valdese stormwater hotline staff receive training in general stormwater awareness, complaint call protocols, appropriate contacts for referral, and typical 132 1 12.13.4. stormwater issues? YES Did Valdese publicize contact information on the municipal Facebook page, and the stormwater program and 137 1 12.13.5. WPCOG webpages? YES Did Valdese establish a web based complaint/ 142 1 15.13.1. reporting/input tool? YES Did Valdese maintain a Facebook page for 151 1 16.13.1. stormwater messaging? YES If so, how many posts were made on the Facebook page related to the stormwater 152 1 16.13.1. program? 1 Did Valdese participate in quarterly Water Resource Committee 161 1 17.B.1. meetings? YES If so, how many quarterly Water Resource Committee meetings did Valdese 162 1 17.13.1. participate in? 2 If so, how many attendees (total of all meetings) were at quarterly Water Resource Committee meetings that Valdese 163 1 17.B.1. participated in? 38 Did Valdese provide a survey to engage the public and gauge public interest in stormwater issues and the 176 1 18.13.1. stormwater program? YES None have been provided If so, how many surveys by citizens at 177 1 18.B.1. were completed? 0 time of report Did Valdese provide and promote volunteer stream cleanup 186 1 19.6.1. activities? YES If so, how many stream cleanup events were 187 1 19.6.1. held? 1 If so, how many stream cleanup participants 188 1 19.B.1. were there? 24 If so, how many trash bags were filled during 189 1 19.13.1. stream cleanup events? 44 Did Valdese provide materials for volunteer stream cleanup activities hosted by Valdese and 206 1 19.13.2. WPCOG? YES Stream Clean- up occurred Did Valdese will publicize through a stream cleanup events to private group, the public on the WPCOG was publicized website, The Town through website, and flyers organization 211 1 19.13.3. distributed at Town Hall? NO website. Did Valdese update the existing MS4 map to include new infrastructure and 216 1 20.13.1. outfalls? YES Valdese has not had major construction during this reporting period but maps are maintained by town of Valdese If so, how many new contracted 217 1 20.13.1. outfalls were mapped? 0 staff Did Valdese review the IDDE ordinance and Adoption is in 226 1 21.B.1. update if needed? PARTIAL progress Did Valdese develop a 231 1 22.13.1. written IDDE Plan? YES Template for What date did Valdese IDDE plan and submit the written IDDE O&M plan was Plan to DEQ for provided to JP 232 1 22.13.1. approval? ##### on 11/3/2020 Without repeat discharges priority IDDE areas were not applicable. Currently working with WM site maps and NPDES permit locations to generate priority areas. High pollution Did Valdese use the MS4 potential areas map to locate outfalls (such as near high pollution risk industrial) are 233 1 23.13.1. areas? YES prioritized Did Valdese establish dry weather inspection procedures and a schedule to inspect 20% 238 1 24.13.1. of the town each year? YES Did Valdese establish procedures to track and document verified illicit discharges and trace 251 1 25.13.1. sources? YES Did Valdese screen priority areas likely to 252 1 26.13.1. have illicit discharges? YES None were If so, how many illicit found during discharges were this permit identified in priority cycle in high 253 1 26.6.1. areas? 0 risk areas Did Valdese evaluate and assess the IDDE plan/program and revise 262 1 26.13.3. if necessary? YES Did Valdese develop the GIS map layer for IDDE 267 1 27.6.1. tracking? YES How many verified IDDE 268 1 27.6.2. issues were identified? 4 Did Valdese enforce illicit discharge and illegal 273 1 27.6.3. dumping violations? YES How many illicit discharge and illegal dumping violations/enforcement 274 1 27.13.3. actions were issued? 2 How many illicit discharge and illegal dumping violations/enforcement 275 1 27.13.3. actions were resolved? 2 Did Valdese establish and maintain a list of chronic 288 1 27.13.4. violators? YES If so, how many chronic violators were 289 1 27.13.4. identified? 1 Did Valdese identify staff and contractors likely to observe and identify illicit discharges, illicit connections, illegal 306 1 28.13.1. dumping and spills? YES Did Valdese train identified staff and contractors to identify and report illicit discharges, illicit connections, illegal 307 1 28.13.2. dumping and spills? YES How many staff and contractors were trained to identify and report illicit discharges, illicit connections, illegal 308 1 28.13.2. dumping and spills? 16 Did Valdese utilize social media and the stormwater webpage(s) to publicize contact information for IDDE 317 1 29.6.2. reporting? YES Did Valdese evaluate the IDDE complaint response 322 1 32.6.2. time? YES Reports are followed up on the same day or the following day depending on time of report. Resolution time follows within the periods outlined by issued NOVs. No issued NOVS required If so, what was the further average response time enforcement to for IDDE complaints / <24 Hours response, correct the 323 1 32.13.2. reports? <3 days resolved issue Did Valdese train municipal staff on proper handling of construction 332 1 33.13.1. site complaints? YES How many staff were trained on proper handling of construction 333 1 33.13.1. site complaints? 16 How many construction site complaints were received from municipal 334 1 33.13.2. staff? 2 Did Valdese administer a public survey to receive perspective on 347 1 34.13.1. construction site runoff? YES Did Valdese publicize the ability to report concerns 348 1 34.13.4. about construction YES runoff issues via the online form on the Valdese and WPCOG websites and social media? Did Valdese develop an ordinance that addresses 357 1 35.6.1. construction site waste? YES Did Valdese adopt an ordinance that addresses Adoption is in 358 1 35.13.2. construction site waste? PARTIAL progress Did Valdese train municipal staff on identifying and reporting construction site waste 363 1 35.13.3. violations? YES How many staff were trained on identifying and reporting construction site waste 364 1 35.13.3. violations? 16 Did Valdese track the number of low -density and high -density plan 385 1 36 reviews performed? YES If so, how many low density project reviews 386 1 36 were performed? 0 If so, how many high density project reviews 387 1 36 were performed? 1 If so, how many low density project reviews 388 1 36 were approved? 0 The one HD project is still in the permitting phase, If so, how many high approval has density project reviews not yet been 389 1 36 were approved? 0 given Did Valdese maintain a current inventory of low - density projects and constructed SCMs, including SCM type or 410 1 36 low -density acreage, YES location, last inspection date and type of enforcement action (if any)? Valdese has no SCMs at the How many high density time of report. non -municipally owned The first one is SCM inspections were currently in its 415 1 36 performed? 0 planning phase Valdese has How many low -density not permitted inspections were any low density 420 1 36 performed? 0 sites How many post - construction enforcement actions 425 1 36 were issued? 0 Did Valdese train field and office staff in Stormwater Ordinance procedures and 430 1 38.13.1. enforcement actions? YES How many staff were trained in Stormwater Ordinance procedures and enforcement 431 1 38.13.1. actions? 16 How many post - construction notices of 440 1 38.13.2. violation were issued? 0 How many post - construction Civil 441 1 38.13.2. Citations were issued? 0 How many post - construction violations are still in process of 442 1 38.13.2. abatement? 0 Did Valdese review post - construction procedures and documents and 455 1 39.6.1. update as needed? YES How many pre -CO SCM inspections were 460 1 42.13.1. completed? 0 How many repeat pre -CO SCM inspections were 461 1 42.B.1. completed? 0 How many permitted projects with O&M Plans 462 1 40.B.1. received their CO? 0 How many SCM inspections were completed by municipal 463 1 42.13.2. staff? 0 How many SCM inspections performed by municipal staff were 464 1 42.13.2. failed? 0 How many qualified licensed professional SCM inspections completed with documentation 465 1 42.13.3. received? 0 How many SCMs are under annual inspection 466 1 42.B.3. enforcement? 0 Did Valdese conduct inspections of 20% of No low density low -density projects this projects to 467 1 42.13.4. year? YES inspect How many low density 468 1 42.13.4. violators were found? 0 How many low density violations were 469 1 42.13.4. enforced? 0 Did Valdese provide educational materials about low density developments during the issuance of zoning permits, distributed through mailings, posted on social media, and 510 1 43.B.3. handed out at events? YES How many low density educational materials 511 1 43.B.3. were distributed? Did Valdese provide educational materials to developers about high density development during the issuance of zoning permits, distributed through mailings, posted on social media, and handed 520 1 44.B.2. out at events? YES How many high density educational materials For the singular 521 1 44.B.2. were distributed? 1 HD project Did Valdese establish/maintain links to all post -construction ordinances, manuals, policies, checklists, design standards, and/or other materials on the 530 1 44.B.3. website? YES Did Valdese maintain a 535 1 45.B.1. Pet Waste Ordinance? YES Did Valdese implement and enforce the Pet 536 1 45.B.1. Waste Ordinance? YES Did Valdese develop educational awareness materials on fecal coliform pollution associated with maintenance of septic 545 1 45.13.2. systems? NO How many educational awareness materials on fecal coliform pollution associated with maintenance of septic systems were 546 1 45.B.2. distributed? 0 How many municipal facilities with the potential to generate stormwater pollution have a written O&M 551 1 46.13.2. Plan? 2 Did Valdese establish standard operating procedures for municipal facility inspections, a schedule of inspections, and a standard for report 552 1 47.B.1. documentation/tracking? YES How many municipal facilities are in the pollution prevention 553 1 47.13.2. inventory? 19 How many high potential municipal facilities received annual inspections for good housekeeping / pollution 554 1 47.13.3. prevention? 2 How many low potential municipal facilities were inspected for good housekeeping / pollution prevention (once per 555 1 47.13.3. permit term required)? 17 How many municipal facilities implemented corrective action(s) 564 1 47.13.3. following inspection? 0 Did Valdese develop a written spill response procedure plan for each facility that requires 569 1 48.B.1 one? YES How many municipal facilities implemented spill response procedure 570 1 48.13.2. plans? 2 How many non - reportable spills were documented according to the spill response 579 1 48.B.5. SOP? How many reportable spills were documented according to the spill 580 1 1 48.B.5. response SOP? Did Valdese develop an MS4 O&M Plan to define required procedures, inspections, schedules, documentation, and MS4 maintenance and 589 1 49.B.1. evaluations? YES When did Valdese Was submitted submit the MS4 O&M alongside the 590 1 49.6.2. Plan to DEQ? ##### IDDE plan Did Valdese provide comprehensive stormwater training to municipal staff and 599 1 50.13.1. contractors? YES How many comprehensive stormwater training 600 1 50.13.1. sessions were held? 1 How many municipal and contractor staff received comprehensive 601 1 50.13.1. stormwater training? 16 Did Valdese inspect the 610 1 51.13.1. MS4 infrastructure? YES How many MS4 catch 611 1 51.13.1. basins were inspected? 4 How many MS4 conveyances were 612 1 51.13.1. inspected? 4 How many MS4 issues 613 1 51.13.1. were documented? 1 How many miles of roadside/ROW conveyances were 614 1 51.13.1. inspected? 10 How many MS4 cleanings/maintenance 635 1 52.13.2. actions were performed? 1 Did Valdese maintain an inventory of municipally - owned SCMs with information including type, year built, date of last inspection and 640 1 53.B.1. maintenance actions? YES How many municipally - owned SCMs are in the 641 1 53.B.1. inventory? 0 Did Valdese develop/maintain a SCM Valdese does Operation and not have a Maintenance Plan for municipal SCM each municipally -owned at the time of 642 1 53.13.2. SCM? NO reporting How many municipally - owned SCM inspections 655 1 54.13.3. were performed? 0 How many municipally - owned SCMs had documented deficiencies/required 660 1 54.13.4. maintenance? 0 How many municipally - owned SCM corrective actions/repairs were 661 1 54.13.4. performed? 0 Did Valdese ensure that only certified landscapers/applicators are applying pesticides, herbicides and 670 1 56.13.1. fertilizers? YES How many certified landscapers/applicators are applying pesticides, herbicides and 671 1 56.13.1. fertilizers? 2 Did Valdese establish standard operating procedures for vehicle 680 1 57.13.1. and equipment washing? YES 520 Did Valdese implement standard operating procedures for vehicle 681 1 57.B.3. and equipment washing? YES Did Valdese ensure all municipal facilities have appropriate industrial stormwater permit 686 1 58.B.1. coverage? YES How many municipal 687 1 58.B.1. facilities have industrial 2 stormwater permit coverage? Did Valdese perform municipal street/curb 688 1 59.B.1. and gutter sweeping? NO How many lane miles 689 1 59.B.1. were swept? 0 Did Valdese distribute educational flyers regarding street runoff 698 1 59.B.2. pollution? YES How many educational flyers regarding street runoff pollution were 699 1 59.13.2. distributed? 85 Did Valdese service public waste 708 1 60.13.1. receptacles? YES How many trash bags 709 1 60.13.1. were used/collected? 200 Did Valdese collect litter from public right-of-way outside of Downtown on 718 1 60.13.2. an as -needed basis? YES How much trash was 719 1 60.13.2. collected (pounds)? 1,000 Did Valdese collect 728 1 61.13.1. leaves? YES How many cubic yards of 729 1 61.13.1. leaves were collected? 480 Did Valdese train first responders on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 738 1 62.13.1. accident? NO How many first responders were trained on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 739 1 62.13.1. accident? Did Valdese equip and maintain spill kits in first 748 1 62.13.2. responder vehicles? YES How many first responder spill kits were 10 401b bags stayed 749 1 62.13.2. maintained / refilled? dry How many public education materials about vehicle leaks / pollution potential were 758 1 62.13.3. distributed? Did Valdese enforce No significant significant vehicle leaks leak violations from parked cars under were 763 1 62.13.4. the IDDE ordinance? NO found/reported How many enforcement actions were issued for significant vehicle leaks 764 1 62.13.4. from parked cars? 0 See above