Loading...
HomeMy WebLinkAboutNCS000602_Granite Falls 2022 Annual Report_20220830Reporting Line Year BMP Measurable Goal Reporting Comments No. (July 1 - Ref. Metric June 30) Did Granite Falls submit the Annual Self -Assessment to NCDEQ prior to 1 1 1 August 31 each year? YES Did Granite Falls develop and distribute new fliers to raise general 9 1 3.B.1. stormwater awareness? YES If so, how many general stormwater 10 1 3.B.1. awareness fliers were distributed? 55 Did Granite Falls attend at least two community events to disperse stormwater outreach materials/awareness through the use of interactive educational games and 19 1 4.B.1. activities? YES If so, how many event attendees were engaged in stormwater outreach/received stormwater 20 1 4.B.1. information? 30 Did Granite Falls provide additional outreach supplement or alternative outreach opportunities if the primary 29 1 4.B.2. community event(s) were canceled? NO If so, how many attendees were 30 1 4.B.2. engaged in stormwater outreach? Did Granite Falls have WPCOG provide instruction and stormwater 39 1 5.B.1. educational activities to youth? YES If so, how many WPCOG youth education activities/events were 40 1 5.B.1. provided? 2 If so, how many WPCOG youth event 41 1 5.B.1. participants were reached? How many storm drains were Storm drains have metal 54 1 5.B.2. stenciled? 0 markers. Did Granite Falls create a presentation covering stormwater topics to be presented in digital classrooms and/or provided to Being developed for 59 1 5.B.3. teachers? Partial school year 2022-2023. If so, how many classroom presentations were provided by 60 1 5.B.3. teachers or staff? If so, how many students were 61 1 5.B.3. reached by classroom presentations? Did Granite Falls develop printed stormwater best practices materials 74 1 6.B.1. for local government distribution? YES Did Granite Falls provide one presentation about one of the six NPDES Minimum Control Measures at each annual WPCOG Water Quality Public Education and 75 1 7.B.1. Conference? YES Outreach. If so, how many attendees were reached during the annual WPCOG Water Quality Conference 76 1 7.B.1. stormwater presentation? 137 Did Granite Falls evaluate the target pollutants and audiences to identify Changes were not 85 1 8.B.1. where outreach can be improved? YES required at this time. If so, were any revisions made to 86 1 8.B.1. target pollutants? NO If so, were any revisions made to 87 1 8.B.2. target audiences? NO Did Granite Falls develop a 100 1 10.13.1. stormwater program web page? YES Was the annual selfassessment 101 1 10.13.2. uploaded to stormwater website? YES Did any links, contact information, or documents on the stormwater web 102 1 10.13.2. page need to be updated? How many hits did the stormwater 103 1 10.13.3. web page receive? 93 Did Granite Falls provide citizen education as part of the enforcement process for illicit discharges, illegal dumping and improper disposal of 116 1 11.13.3. waste? YES If so, how many educational citizen interactions were completed as part of the illicit discharge and illegal 117 1 11.13.3. dumping enforcement process? 5 Did Granite Falls establish a hotline for stormwater complaints and 126 1 12.13.1. information? YES Did Granite Falls identify specific staff who will serve as the hotline 127 1 12.13.2. contact(s)? YES How many stormwater hotline calls 128 1 12.13.3. were received? 8 Did Granite Falls stormwater hotline staff receive training in general stormwater awareness, complaint call protocols, appropriate contacts for referral, and typical stormwater 133 1 12.13.4. issues? YES Did Granite Falls publicize contact information on the municipal Facebook page, and the stormwater 138 1 12.13.5. program and WPCOG webpages? YES Did Granite Falls establish a web based complaint/ reporting/input 143 1 15.B.1. form? YES Did Granite Falls maintain a Facebook 152 1 16.13.1. page for stormwater messaging? YES Did Granite Falls utilize the Facebook page to promote public involvement in stormwater programs, events and projects and provide outreach/general stormwater 153 1 16.13.2. awareness messages? YES If so, how many posts were made on the Facebook page related to the 154 1 16.13.2. stormwater program? 1 Did Granite Falls participate in quarterly Water Resource Committee 167 1 17.13.1. meetings? YES If so, how many quarterly Water Resource Committee meetings did 168 1 17.13.1. Granite Falls participate in? 2 If so, how many attendees (total of all meetings) were at quarterly Water Resource Committee meetings that 169 1 17.13.1. Granite Falls participated in? 38 Did Granite Falls provide a survey to engage the public and gauge public interest in stormwater issues and the 182 1 18.13.1. stormwater program? YES Survey has been supplied but none have If so, how many surveys were been received from 183 1 18.13.1. completed? 0 citizens Did Granite Falls provide and promote volunteer stream cleanup 192 1 19.13.1. activities? YES If so, how many stream cleanup 193 1 19.13.1. events were held? 1 If so, how many stream cleanup 194 1 19.B.1. participants were there? 13 If so, how many trash bags were 195 1 19.B.1. filled during stream cleanup events? 12 Did Granite Falls provide materials for volunteer stream cleanup activities hosted by Granite Falls and 212 1 19.13.2. WPCOG? YES Did Granite Falls supplement or replace stream clean-up time with outdoor educational activities if streams do not have adequate litter 217 1 19.13.4. available for cleanup? YES If so, how many supplemental or replacement outdoor educational 218 1 19.B.4. activities were held? 1 If so, how many supplemental or replacement outdoor educational Activities provided at 219 1 19.13.4. activity participants were there? 13 Stream Clean -Up. Did Granite Falls update the existing MS4 map to include open channels, storm drain information and flow 232 1 20.13.1. direction? YES If so, was at least 20% of the MS4 233 1 20.13.1. area mapped? Yes Did Granite Falls add newly Mapping is in progress, constructed infrastructure to the constructed 242 1 20.B.2. existing MS4 map? YES infrastructure included Did Granite Falls review the IDDE 247 1 21.13.1. ordinance and update if needed? YES Did Granite Falls develop a written 252 1 22.13.1. IDDE Plan? YES Template for IDDE plan What date did Granite Falls submit and O&M plan was the written IDDE Plan to DEQ for provided to JP on 253 1 22.13.1. approval? #### 11/3/2020 Without repeat discharges priority IDDE areas were not applicable. Currently working with WM site maps and NPDES permit locations to generate priority areas. High pollution potential Did Granite Falls use the MS4 map to areas (such as locate priority areas likely to have industrial) are 254 1 23.13.1. illicit discharges? YES prioritized Did Granite Falls establish dry weather inspection procedures and a 259 1 24.B.1. schedule? YES Did Granite Falls establish procedures to track and document illicit 272 1 25.13.1. discharge investigations? YES Did Granite Falls screen priority areas 273 1 26.13.1. likely to have illicit discharges? YES None were found during If so, how many illicit discharges this permit cycle in high 274 1 26.13.1. were identified in priority areas? 0 risk areas Did Granite Falls evaluate and assess the IDDE plan/program and revise if 283 1 26.13.3. necessary? YES Did Granite Falls develop the IDDE 288 1 27.13.1. tracking sheet? YES How many verified IDDE issues were 289 1 27.13.2. identified? 5 Enforcement procedures are in place and are used, but no verified IDDE cases in Granite Falls were Did Granite Falls enforce illicit related to illegal discharge and illegal dumping dumping during this 294 1 27.13.3. violations? YES permit cycle One discharge investigation came from a mistaken illegal dumping report, but How many illicit discharge and illegal otherwise they were dumping violations/enforcement related to construction 295 1 27.13.3. actions were issued? 0 sediment and pet waste How many illicit discharge and illegal dumping violations/enforcement 296 1 27.13.3. actions were resolved? 0 See 295 Did Granite Falls establish and 309 1 27.13.4. maintain a list of chronic violators? YES The tracking sheet exists, but no chronic/repeat violators If so, how many chronic violators have been determined 310 1 27.13.4. were identified? 0 in Granite Falls Did Granite Falls identify staff and contractors likely to observe and identify illicit discharges, illicit connections, illegal dumping and 327 1 28.13.1. spills? YES Did Granite Falls train identified staff and contractors to identify and report illicit discharges, illicit connections, illegal dumping and 328 1 28.13.2. spills? YES How many staff and contractors were trained to identify and report illicit discharges, illicit connections, illegal 329 1 28.13.2. dumping and spills? 13 Did Granite Falls utilize social media and the stormwater webpage(s) to publicize contact information for 338 1 29.13.2. IDDE reporting? YES Did Granite Falls evaluate the IDDE 343 1 32.13.2. complaint response time? YES Reports are followed up on the same day or the following day depending on time of report. Resolution time follows within the periods outlined by issued NOVs with <24 reasonable time to Hours correct. No issued NOVS response, required further If so, what was the average response <5 days enforcement to correct 344 1 32.13.2. time for IDDE complaints / reports? resolved the issue Did Granite Falls train municipal staff on proper handling of construction 353 1 33.13.1. site runoff complaints? YES How many staff were trained on proper handling of construction site 354 1 33.13.1. runoff complaints? 13 How many construction site runoff complaints were received from 355 1 33.13.2. municipal staff? 4 Did Granite Falls administer a public survey to receive perspective on 368 1 34.13.1. construction site runoff? YES Did Granite Falls publicize the ability to report concerns about construction runoff issues via the online form on the Granite Falls and 369 1 34.13.4. WPCOG websites and social media? YES Did Granite Falls develop an ordinance that addresses 378 1 35.13.1. construction site waste? YES Did Granite Falls adopt an ordinance that addresses construction site 379 1 35.13.2. waste? YES Did Granite Falls train municipal staff on identifying and reporting 384 1 35.13.3. construction site waste violations? YES How many staff were trained on identifying and reporting 385 1 35.13.3. construction site waste violations? 13 Did Granite Falls track the number of low -density and high -density plan 406 1 36 reviews performed? YES If so, how many low density project 407 1 36 reviews were performed? 3 No submitted plans in If so, how many high density project this time frame hit HD 408 1 36 reviews were performed? 0 under WSW or Phase II If so, how many low density project 409 1 36 reviews were approved? 3 If so, how many high density project 410 1 36 reviews were approved? 0 See 408 Did Granite Falls maintain a current inventory of low -density projects and constructed SCMs, including SCM type or low -density acreage, location, last inspection date and type of 431 1 36 enforcement action (if any)? YES How many high density non - municipally owned SCM inspections 436 1 36 were performed? 6 How many low -density inspections 441 1 36 were performed? 3 How many post -construction 446 1 36 enforcement actions were issued? 0 Did Granite Falls train field and office staff in Stormwater Ordinance procedures and enforcement 451 1 38.13.1. actions? YES How many staff were trained in Stormwater Ordinance procedures 452 1 38.13.1. and enforcement actions? 13 How many post -construction notices 461 1 38.13.2. of violation were issued? 0 How many post -construction Civil 462 1 38.13.2. Citations were issued? 0 How many post -construction violations are still in process of 463 1 38.13.2. abatement? 0 Did Granite Falls review post - construction procedures and 476 1 39.13.1. documents and update as needed? YES How many pre -CO SCM inspections None were permitted 481 1 42.B.1. were completed? 0 during reporting period How many repeat pre -CO SCM None were permitted 482 1 42.B.1. inspections were completed? 0 during reporting period How many permitted projects with None were permitted 483 1 40.B.1. O&M Plans received their CO? 0 during reporting period How many SCM inspections were 484 1 42.13.2. completed by municipal staff? 6 How many SCM inspections performed by municipal staff were 485 1 42.13.2. failed? 0 How many qualified licensed professional SCM inspections completed with documentation 486 1 42.13.3. received? 6 How many SCMs are under annual 487 1 42.13.3. inspection enforcement? 0 Did Granite Falls conduct inspections of 20% of low -density projects this 488 1 42.13.4. year? YES Did Granite Falls provide educational materials about low density developments during the issuance of zoning permits, distributed through mailings, posted on social media, and 521 1 43.13.3. handed out at events? YES How many low density educational During plan review 522 1 43.13.3. materials were distributed? 3 process Did Granite Falls provide educational materials to developers about high density development during the issuance of zoning permits, distributed through mailings, posted on social media, and handed out at 531 1 44.13.2. events? YES During plan review How many high density educational process and responding 532 1 44.13.2. materials were distributed? 7 to developer inquiry's Did Granite Falls establish/maintain links to all post -construction ordinances, manuals, policies, checklists, design standards, and/or 541 1 44.13.3. other materials on the website? Did Granite Falls maintain a Pet 546 1 45.B.1. Waste Ordinance? YES Used on 1 IDDE case Did Granite Falls implement and involving pet waste 547 1 45.B.1. enforce the Pet Waste Ordinance? YES leaving a property Did Granite Falls develop educational awareness materials on fecal coliform pollution associated with 556 1 45.13.2. maintenance of septic systems? YES How many educational awareness materials on fecal coliform pollution associated with maintenance of 557 1 45.13.2. septic systems were distributed? 0 How many municipal facilities have 562 1 46.13.2. O&M Plans? 1 Did Granite Falls verify the municipal 563 1 47.13.1. facility list is complete? YES How many municipal facilities were identified to have stormwater 564 1 47.13.2. pollution potential / spill risk? 1 How many municipal facilities were inspected to ensure good housekeeping / spill prevention and 565 1 47.13.3. control measures are implemented? 19 How many municipal facilities implemented corrective action(s) 570 1 47.13.4. following inspection? 1 Did Granite Falls develop a written Included as part of spill response procedure plan for municipal O&M and 575 1 48.13.1 each facility that requires one? YES facility 0&M How many municipal facilities implemented spill response 576 1 48.13.2. procedure plans? 2 How many non -reportable spills were documented according to the spill 585 1 48.13.5. response SOP? How many reportable spills were documented according to the spill 586 1 48.13.5. response SOP? Did Granite Falls develop an MS4 O&M Plan to define required 595 1 49.B.1. procedures, inspections, schedules, YES documentation, and MS4 maintenance and evaluations? When did Granite Falls submit the Submitted alongside 596 1 49.13.2. MS4 O&M Plan to DEQ? #### IDDE plan Did Granite Falls provide comprehensive stormwater training 605 1 50.B.1. to municipal staff and contractors? YES How many comprehensive stormwater training sessions were 606 1 50.B.1. held? 1 How many municipal and contractor staff received comprehensive 607 1 50.B.1. stormwater training? 13 Did Granite Falls inspect the MS4 616 1 51.13.1. infrastructure? Yes How many MS4 catch basins were 617 1 51.13.1. inspected? 215 How many MS4 conveyances were 618 1 51.13.1. inspected? 215 How many MS4 issues were 619 1 51.13.1. documented? 6 How many MS4 cleanings/maintenance actions were 636 1 52.13.2. performed? 12 Did Granite Falls maintain an inventory of municipally -owned SCMs with information including type, year built, date of last Granite Falls does not 641 1 53.13.1. inspection and maintenance actions? have a municipal SCM How many municipally -owned SCMs 642 1 53.13.1. are in the inventory? 0 Did Granite Falls develop/maintain a Granite Falls does not SCM Operation and Maintenance have a municipal SCM, Plan for each municipally -owned but should one be built 643 1 53.13.2. SCM? NO it will require an O&M How many municipally -owned SCM Granite Falls does not 656 1 54.13.3. inspections were performed? 0 have a municipal SCM How many municipally -owned SCMs had documented 661 1 54.13.4. deficiencies/required maintenance? 0 See above How many municipally -owned SCM corrective actions/repairs were 662 1 54.13.4. performed? 0 See above Did Granite Falls ensure that only certified landscapers/applicators are applying pesticides, herbicides and 671 1 56.13.1. fertilizers? YES How many certified landscapers/applicators are applying 672 1 56.13.1. pesticides, herbicides and fertilizers? 8 Did Granite Falls establish standard operating procedures for vehicle and 681 1 57.13.1. equipment washing? YES Did Granite Falls implement standard operating procedures for vehicle and 682 1 57.13.3. equipment washing? YES Did Granite Falls ensure all municipal facilities have appropriate industrial 687 1 58.13.1. stormwater permit coverage? YES How many municipal facilities have industrial stormwater permit 688 1 58.13.1. coverage? 1 Did Granite Falls perform annual 689 1 59.13.1. municipal parking lot sweeping? YES Did Granite Falls remove litter/debris 690 1 59.13.1. from municipal parking lots weekly? YES Did Granite Falls track conveyances/infrastructure that have frequent problems with pollution to 691 1 59.13.2. prioritize their maintenance? YES Did Granite Falls distribute educational flyers regarding street 704 1 59.13.3. runoff pollution? YES How many educational flyers regarding street runoff pollution 705 1 59.13.3. were distributed? 35 Did Granite Falls service public waste 714 1 60.B.1. receptacles? YES How many trash bags were 715 1 60.B.1. used/collected? 1,500 Did Granite Falls collect litter on an 724 1 60.13.2. as -needed basis? YES How much trash was collected 725 1 60.13.2. (pounds)? 1,500 Did Granite Falls perform at least two leaf collections between October and 734 1 61.13.1. April? YES How many cubic yards of leaves were 735 1 61.13.1. collected? 86 Did Granite Falls train first responders on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 744 1 62.13.1. accident? YES How many first responders were trained on minimizing, collecting and disposing of fluids and other vehicular pollutants following an 745 1 62.13.1. accident? Did Granite Falls equip and maintain 754 1 62.13.2. spill kits in first responder vehicles? YES How many first responder spill kits 5 Ibs of 755 1 62.13.2. were maintained / refilled? absorbant How many public education materials about vehicle leaks / pollution Included on General 764 1 62.13.3. potential were distributed? 35 Runoff Information Flier Did Granite Falls enforce significant vehicle leaks from parked cars under 769 1 62.13.4. the IDDE ordinance? YES No significant vehicle leaks were found or How many enforcement actions were reported. Otherwise issued for significant vehicle leaks they will be treated as a 770 1 62.13.4. from parked cars? 0 discharge and recorded