Loading...
HomeMy WebLinkAbout20221227 Ver 1_More Info Received_202210041 Anderson, Mitchell L From:info marathonbuildersnc.com <info@marathonbuildersnc.com> Sent:Tuesday, October 4, 2022 1:31 PM To:Anderson, Mitchell L Subject:Re: [External] Marathon/ Steffel Attachments:Steffel rip rap .pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.      Good Afternoon Mr Anderson   I have attached the drawings with the measurements.   The height of the rip rap would be 12”‐16”   The width of the rip rap would be 3’ +/‐  The projection into the lake at full pond would be 0” +/‐    The length of the rip rap will be 30’ +/‐    If you look at the draing of the plan you will see that the rip rap is actually installed to the full pond location. At full pond  and no wave action the rip rap will not be in the lake.     Thank you   Jonathan         On Sep 30, 2022, at 1:52 PM, Anderson, Mitchell L <mitchell.anderson@ncdenr.gov> wrote:    Mr. Hinkle,     Thank you for this information.   Please provide the average height of proposed the rip‐rap and the average projection into the lake.  Ensure to differential the amount of rip‐rap above and below the OHWM (full pond).  These dimensions are indicated in the image below:     <image001.png>     Further, the amount in Linear Feet of shoreline that will be receiving rip‐rap is also required.     <image002.png>     Thank you,     Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  <image003.png>  c I W41 RHV San ilvNInHo RRHCI I O€1 1 I r? 3 ) 1.