HomeMy WebLinkAboutSW6220504_Comment Response_20220926 (2)Bowman Project: Cameron Village Location: Club Pond Road, Raeford, Hoke County Jurisdiction: NCDEQ Date: 8/22/22 Subject: SW Comments SW6220504 4006 Barrett Drive, Suite 104 Raleigh, North Carolina, 27609 TEL (919) 553-6570 Comment Response General Design Comments Response Please provide the riprap sizing calculations (This item is required per ✓ Riprap sizing calculations have been included. General MDC 4 and 15A NCAC 02H A 042(2)(f)). It is noted that the riprap apron size information is included on plan sheet EC-1, however, I did not see the calculations showing how these numbers were derived/showing that they are adequately sized. There appears to be some new BUA being added to the site (on Club Pond ✓ Third column has been added on the Drainage Areas Page Road & Eaton Lane) that does not drain to the SCM. The amount of untreated showing the bypass impervious areas not draining to the new BUA appears to be less than the amount of existing BUA for the site (17,230 sf) so it does not need to be treated (since the net increase in BUA for SCM. The project density has been updated on page 3 of the stormwater application. The total BUA has been updated. the site is being treated), but it does need to be accounted for in the Entire Site Column of the Drainage Areas Page of the Supplement-EZ Form (see below comment). The BUA amounts shown in the wet pond drainage area columns won't add up to the entire site column since there is some BUA located on - site, but not located within the drainage area of either SCM (While not required, you can include a bypass drainage area on this form so that the BUA values in the 3 drainage area columns (wet pond 1, wet pond 2, and bypass) add up to the entire site column (The form is not set up to do this, it would just be for clarity)). You will need to update the total amount of BUA within the project area ("entire site") and, depending on the exact amount of BUA located on -site but not within an SCM drainage area, you may need to recalculate/update the project density. Bowman 4006 Barrett Drive, Suite 104 Raleigh, North Carolina, 27609 TEL (919) 553-6570 Wet Pond 1 Design Comments Response Plan sheet SCM-1 shows a 5" diameter drawdown orifice being drilled into a ✓ Drawdown pipe revised to 6". 4" diameter PVC pipe. Please either increase the diameter of the PVC pipe so that it is as large as or larger than the drawdown orifice or reduce the size of the drawdown orifice so that it will fit within the PVC pipe (provide revised drawdown calculations if changing the size of the drawdown orifice). NOTE: It is noted that wet pond 1 is adequately sized for what is currently ✓ n/a being permitted (Drainage area of 1,141,886 sf with 475,548 sf of BUA) as well as the future build -out conditions (Drainage area of 1,866,124 sf with 900,331 sf of BUA). The permit will be written to reflect what is currently being permitted, but a note will be added to the permit indicating that the wet pond is oversized to handle a drainage area of 1,866,124 sf with 900,331 sf of BUA. Su lement-EZ Form Comments Response Cover Page: ✓ Setback has been included. - Line 7 — Please indicate the width of the required vegetated setback 30 ft from the surface waters to the west of the project site. Drainage Area Page: ✓ The total BUA has been updated per previous comment. - Entire Site Column: Existing BUA is recorded on Line 15. The project density has o General — Please ensure that all of the BUA located within the project area (not just the portions of the portions of the been included in Line 18 and updated on page 3 of the stormwater application. project area draining to the wet ponds) is accounted for in this column o Line 15 — Please ensure that the existing BUA is recorded in this column. o Line 18 Please include the %BUA for the project area (this information should match the information shown in Section IV, 8 of the Application). Drainage Area Page: ✓ The BUA allocated to individual lots recorded on Line 9. - Entire Site Column: o Line 9/Line 12, Roof — The BUA allocated to the individual lots should be recorded on Line 9 (new BUA on subdivided lots), not under Line 12 (breakdown of BUA not on subdivided lots). Bowman 4006 Barrett Drive, Suite 104 Raleigh, North Carolina, 27609 TEL (919) 553-6570 Drainage Area Page: ✓ Line 10 has been revised. - Entire Site Column: o Line 10 — Line 10 should be the sum of the items shown on Line 12 (the BUA located in common areas/not allocated to the individual lots). Wet Pond Page Response Lines 25/35/40 — The design volume of the SCM is typically the volume that ✓ Lines 25/35/40 have been revised to provide additional can be stored above the permanent pool surface and below the bypass weir (@ treatment capacity for the SCMs. 257.8' for wet pond 1 and @ 256.3' for wet pond 2), i.e., the volume that gets drawn down via the drawdown orifice only. You can keep the design volume as the minimum required treatment volume if you wish, however increasing the design volume up to the bypass weir provides additional treatment capacity for the SCMs.