Loading...
HomeMy WebLinkAboutSW6220504_Supplement-EZ Form_20220926SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 j Project Name �^ 2 Project Area ac Cameron Village 42.3088 3 Coastal Wetland Area ac - 4 Surface Water Area ac - 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 _ Permeable Pavement 0 16 ISand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 BayflIter 0 26 Filterra 0 FORMS LOADED IGNER CERTIFICATION 27 Name and Tltle: Or anization: Street address: _ Carlo Pardo, PE Bowman North Carolina, Ltd. 28 29 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 1 Phone numbers : 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here ,.,�� wlI101/frll7j,/ C A R ZS SI !�rrr••� SEAL = 051571 's it �; •• E,�G! Pi��;F� : � ��� rrrfllq��/O Signature of Designer Date DRAINAGE AREAS 1 _ Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 3 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 Type of SCM - Wet Pond Wet Pond Bypass 5 Total drainage area (sq ft 1842972 sf 1141886 sf 552343 sf 13073 6 Onsite drainage area (sq ft 1842972 sf 1141886 sf 552343 sf 13073 7 Offsite drainage area (sq ft 8 Total BUA in.project (sq ft 744489 sf 475548 sf 260413 sf 8528 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 496000 sf 308000 sf 188000 sf 10permitting) New BUA not on subdivided lots (subject to (sf) 248489 sf 167548 sf 72413 sf 8528 sf 11 JOffsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 67235 sf 46590 sf 18704 sf 1941 sf Roof (sg ft Roadway s ft 171236 sf 110940 sf 53709 sf 6587 sf Future (sq ft Other, please specify in the comment box below (sq ft 10018 sf 10018 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 17230 sf 17230 sf 16 ExistinQ BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 40.40% 41.65% 47.15% 19 Design storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft 40424 cf 21832 cf 71 21 Calculation method -for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Drainage Area #1 - Pool Impervious Area = 10,018sf Drainage Area #1 has been designed for an area of 1,866,124 sf with an impervious area of 900,331 sf. The future phase includes an additional 724,238 sf of drainage area with an additional impervious area of 424,783 sf WET POND 11 Drainage area number 1 2 2 1 Minimum required treatment volume cu ft) 40424 cf 21832 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM H: ? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes Yes 9 What is the method for clewatering the SCM for maintenance? Pump (preferred) Pump referred 10 If applicable. will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comely with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes M Is there an O&M Plan that complies with General DC 12 ? Yes Yes A17 Does the SCM follow the devices ecific MDC? Yes Yes Was the SCM designed by an NC licensedprofessional? Yes Yes T POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA 19 Has a sta a/stora a table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 251.00 250.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 252.00 251.00 221 Elevation of the bottom of the vegetated shelf (fmsl) 255.50 254.50 23 Elevation of the permanent pool fmsl 256.00 255.00 24 Elevation of the top of the vegetated shelf fmsl 256.50 255.50 25 Elevation of the temporary pool (fmsl) 257.80 256.30 26 Surface area of the main permanent pool (square feet) 51435 18440 27 Volume of the main permanent pool cubic feet 183364 cf 60353 cf 28 Avera a depth of the main pool feet 3.76 ft 3.59 ft 29 Average depth euation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 975.0 ft 593.0 ft 31 If using equation 3 width of submerged veg. shelf feet 3.0 ft 3.0 ft 32 Volume of the foreba (cubic feet 35620 cf 9396 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba inches 24 in 24 in 351 Design volume of SCM cu ft 146649 cf 36180 cf 361 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 5.0 in 2.50 in 38 If weir, weir height inches 39 If weir, weir length inches 40 Drawdown time for the tem ora ool (days) 3.01 3.16 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 j Are berms or baffles provided to improve the flowpath? Yes Yes 431 Depth of forebay at entrance inches 36 in 36 in 44 De th of fo bay at exit (inches) 30 in 30 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf H: 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1-, r 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met. No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Specie of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Hasa plantingtan been provided for the vegetated shelf? Yes Yes AUD171ONAL INFORMATION - Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 1:34 PM 9/26/2022