HomeMy WebLinkAboutSW6220504_Plansheet SCM-1&2 - SCM Detail_20220606'STORMWATER MANAGEMENT NOTES: 1. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED. 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES. J. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY. 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ 24" RCP WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 3 1 �/ APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 35'-24" RCP ® 3.70% SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1" OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS. TOPSOIL SHALL CONTAIN AT LEAST 4-6% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL 1 LINES.) STORMWATER MANAGEMENT SYSTEM DETAILS NOT TO SCALE 3' MIN 4' MIN. EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 6" CLAY SOIL LINER ON INSIDE 6.0'x6.0' FACE OF SEEPAGE COLLAR EMBANKMENT SEE DETAIL 'STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 256.0 74990 0 0 0.5 256.5 79345 38584 38584 1.0 257.0 82250 40399 78983 (WQv) 2.0 258.0 88090 85170 164153 3.0 259.0 93565 90828 254980 4.0 260.0 97410 95488 350468 5.0 261.0 101310 99360 449828 5.5 261.5 103285 51149 500976 TRASH RACK REFER TO DETAIL THIS SHEET TOP OF EMBANKMENT ELEVATION=261.5 6" TOPSOIL ABOVE 100 YEAR STORM ELEVATION=259.31 6" CLAY LINER REFER TO DETAIL ON LITTORAL SHELF FOR INCREMENTAL EMERGENCY WEIR ELEVATION=259.1 3 WEIR 10 YEAR STORM ELEVATION =258.1 7 1 6 6FT LITTORAL" 1 1 SHELF -I r_. 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) 2 YEAR STORM ELEVATION=257.39 INTERMEDIATE WEIR ELEVATION=257.8 1 YEAR STORM ELEVATION=256.95 I.el Lo INV=256.0 1 ELEV=254.0- 1 4' MIN. ASTM C-923 SEAL BETWEEN KEY BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. ' L1�- PVC ELBOW SEE DETAIL -1 + .-i 1.0-INCH STORM ELEVATION=256.04 NORMAL POND ELEVATION=256.0 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 THE POND WHEN NECESSARY. REFER TO DETAIL CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION. 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. CONCRETE SHALL BE PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. L5'x5'xl.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. RISER EXISTING GRADE=259.0t THIS SHEET fOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=252.0 FOREBAY AREA \ STORM WEIR FOREBAY / \ DRAINAGE / BY OTHERS/ MAIN POND / \ ' o 0 0 � � � � AREA °°° •° TOTAL LITTORAL SHELF AREA=5,775SF REFER TO DETAIL \ \ FOR PLANTINGS / \ \\ \ FES FES \ \ STORM DRAINAGE \ a� BY Y OTHERS o \� 69Z SOD AREAS ABOVE \ / NORMAL POOL ELEVATION FOREBAY STORM DRAINAGE AND \\\ ° ° i \\ \\ \\ AREA STRUCTURE BY OTHERS 35'-24 RCP 03,70% (WATER -TIGHT) CONCRETE \\ SEEPAGE COLLAR \ OUTLET CONTROL' �\ STRUCTURE REFER TO DETAILS THIS SHEET \ \\ INV=256.0 TOP OF EMBANKMENTELEV=261.5 FOREBAY 6 / 6S/ / WEIR / FES / FOREBAY STORM \ _ - STORMWATER DRAINAGE MANAGEMENT \ \ � BY OTHERS \ � _ �EASEMENT WET POND PLAN VIEW (BOTTOM OF SEDIMENT STORAGE)=251.0 6" CLAY SOIL LINER MAIN POOL EMERGENCY 1$9 � /N�RME�/qTE WEIR c 1$�e 2 1 F �r^UCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 ON LITTORAL SHELF -- _ i I� - 6FT LITTORAL 6:1 = SHELF NOTES: 1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. TRASH RACK - CORROSIVE MATERIAL 5.5" 0 5.5 SPACING e GRAPHIC SCALE 30 0 15 30 1 INCH = 30 FEET 5.5" 1' f ; I e 5.5" NOTE: TRH RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL SCALE: N.T.S. CONCRETE SEEPAGE COLLAR SCALE: N.T.S. RISER 12' MIN. GRASS FOREBAY WEIR AT ELEV=255.0 MOM croi 1rT11Dr 4" PVC iH RISER URE FOREBAY TOP ELEV=258.0 WIDTH AT TOP=2.0 FT INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN SEDIMENT STORAGE TOP THE FOREBAY WHEN NECESSARY. REFER TO DETAIL FOREBAY STOR BOTTOM THIS SHEET FOR DEWATERING REQUIREMENTS. ELEV=254.0 NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/EXIT ELEV=253.5 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUS PLANTS 1 L� 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE `- 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=253.0 SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) SPACING PLANTING SEASON Jancus effusus Soft Rush SHALLOW WATER 241 PEAT POT 6' O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW WATER 241 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tabernoemontani Soft Stem Bulrush SHALLOW WATER 241 PEAT POT 6' O.C. SPRING/SUMMER Eupotoriodelphus maculatus Spotted Trumpetweed SHALLOW LAND 241 PEAT POT 6' O.C. SPRING/SUMMER Eupatorium purpureum Joe-Pye Weed SHALLOW LAND 241 PEAT POT 6' O.C. SPRING/SUMMER Rhynchospora colorata Starrush Whitetop I SHALLOW LAND 241 PEAT POT 6' O.C. SPRING/SUMMER #4 REBAR ® 12" OC IN FRONT & REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC, COVER FROM EDGE OR FACE OF COLLAR NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON -FLY ASH. 2. APPLY I" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES. 4. TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER. ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 TYPE 1: ASTM-D-2822-75 TYPE 1. (STORMWATER MANAGEMENT DESIGN WET DETENTION POND#1 RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 03030004 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 26.21 ACRES SITE IMPERVIOUS AREA TO POND: 10.92 ACRES OFF SITE DESIGN IMPERVIOUS AREA TO POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 10.92 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED THROUGH POND DRAINAGE AREA: 26.21 AC 26.21 AC CURVE NUMBER: 55.5 75.0 1.0" STORM EVENT: 0.323 CFS 0.005 CFS 1-YEAR STORM EVENT: 1.574 CFS 36.24 CFS 0.533 CFS 2-YEAR STORM EVENT: 4.631 CFS 53.41 CFS 0.678 CFS 10-YEAR STORM EVENT: 20.06 CFS 106.35 CFS 3.806 CFS 100-YEAR STORM EVENT: 56.79 CFS 198.82 CFS 20.77 CFS TYPICAL LITTORAL SHELF PLANTING SCHEDULE OPERATION & MAINTENANCE BMP element: Potentialproblem: How I will remediate the problem The entire SCM Trash/debris is present Remove the trash/debris The perimeter of the wet pond Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully, plant ground cover and water until it is established. Provide lime and a one-time fertilizer application The inlet device The inlet pipe is clogged (if applicable) Unclog the pipe. Dispose of the sediment in a location where it will not cause impacts to streams or the SCM The inlet pipe is cracked or otherwise damage (if applicable) Repair or replace the pipe Erosion is occurrtn in the Swale (if applicable Regrade the Swale if necessary and provide erosion control devices such as reinforced turf matting or riprap to avoid future erosion problems The forebay Sediment has accumulated to a depth greater than the artginal design depth for sediment storage Search for the source of the sediment and remedy the problem if possible" Remove the sediment and dispose of it to a location where it will not cause impacts to streams or the SCM Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprop if needed to prevent fufure erosion problems Weeds are present Remove the weeds, preferably by hand. If esticide is used, wipe, it on the plants rather than spraying The vegetated shelf Best professional practices show that pruning is needed to maintain optimal plant health Prune according to best professional practices Plants are dead, diseased or dying Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace, plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably, by hand. If pesticide is used, wipe. tt on fhe plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the on final design sediment storage depf� Search for the source of the sediment and remedy the problem if possible, Remove the sediment and dispose of it to a location where it will not cause impacts to streams or the SCM Algal growth covers over 50% of the area Consult a professional to remove and control the algal growth Cattails, phragmites or other invasive plants cover 50% of the basin surface Remove the plants by wipin them with pesticide (do no spray} The embankment Shrubs have started to grow on the embankment Remove shrubs immediately Evidence of muskrat or beaver activity is present Consult a professional to remove muskrats or beavers and repair any holes or erosion A tree has started to grow on the embankment Consult a dam safety specialist to remove the tree An annual innspection by an appropriate professional shows that the embankment needs Make all needed repairs immediately repair The outlet device Clogging has occurred Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM The outlet device is damaged Repair or replace the outlet device e receiving water Erosion or other signs of damage have occurred at the outlet. Repair the damage and improve the flow dissipation structure Dischargges from the wet pond seimeniationeinsihe oreceiving wa er ptact the local NCDEQ Regaionl Mice W zl T I � E vI ° w a aUJ�m CONSULTANT: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 5S3-6570 cpardo@bowman.com FIRM# F-1445 CARo� O FESS/�•.•�y Quo ti9`•. -v �. a SEAL 051571 %•��'l 0 E •'Q P���: '��►n iO4 r OWNER/DEVELOPER: Lee Humphrey Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 (Office) 910-206-1808 (cell) lee@doubledeng.com U z LEI ® }- Q Z `1 (D ::D J � Q U Z L_Li ® ®_ L. LJ Q --I CD U U W This document, together with the concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Bowman North Carolina, Ltd. shall be without liability to Bowman North Carolina, Ltd. U c z D 0 a= 0 Drawn Checked Approved Project No: 048019 Date: January 5, 2022 Title STORMWATER CONTROL MEASURE DETAILS Sheet No. S C M _ Al "STORMWATER MANAGEMENT NOTES: 1. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED. 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES. 3. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT l0 ACCESS THE STORMWATER CONTROL(S) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY. 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ 24" RCP WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 3 APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 204'-24" RCP ® 0.54% SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1" OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS. TOPSOIL SHALL CONTAIN AT LEAST 4-6% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.) STORMWATER MANAGEMENT SYSTEM DETAILS NOT TO SCALE 3' MIN 4' MIN. EMBANKMENT WIDTH 6" TOPSOIL FOR ALL - AREAS ABOVE THE NORMAL POND ELEVATION 6" CLAY SOIL LINER ON INSIDE 6.O'x6.0' FACE OF SEEPAGE COLLAR EMBANKMENT SEE DETAIL TRASH RACK REFER TO DETAIL THIS SHEET 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 3 6 6FT LITTORAL SHELF 1 ELEV=253.0- 1 4' MIN. ASTM C-923 SEAL BETWEEN KEY BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL, WLI FUND PLAN VILW STAGE STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 255.0 25040 0 0 0.5 255.5 27485 13131 13131 0.9 255.9 28745 11246 24377 (WQv) 1.0 256.0 29065 2891 27268 2.0 257.0 32275 30670 57938 3.0 258.0 35075 33675 91613 4.0 259.0 37925 36500 128113 TOP OF EMBANKMENT ELEVATION=259.0 REFER TO DETAIL FOR INCREMENTAL WEIR 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) 100 YEAR STORM ELEVATION=258 47 EMERGENCY WEIR ELEVATION=257.0 10 YEAR STORM ELEVATION=256.97 2 YEAR STORM ELEVATION=256.41 INTERMEDIATE WEIR ELEVATION=256.3 1 YEAR STORM ELEVATION=256.29 q 1.0-INCH STORM ELEVATION=255.05 7-7 NORMAL POND ELEVATION=255.0 PVC ELBOW Y' . ° ••: < :y.' SEE DETAIL 2 -�1 ` CONCRETE SHALL BE "_ZZI PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. 5'x5'xl.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION. 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. NOTE: PUMPS SHALL BE USED TO DRAIN THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=251.0 RISER (BOTTOM OF SEDIMENT STORAGE)=250.0 6" CLAY SOIL - LINER MAIN POOL EXISTING GRADE=262.0t f MERCEN�� wE/R , ?S�o IN�RMfO/qT ?56.3 2 1 rno nr croUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM--\ 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 6FT LITTORAL SHELF 6r NOTES: 1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. GRAPHIC SCALE 3 0 15 30 1 INCH = 30 FEET TRASH RACK CORROSIVE MATERIAL 0 5.5" SPACING o I � r \ i 0 i NOTE: TRASH RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL SCALE: N.T.S. CONCRETE SEEPAGE COLLAR SCALE: N.T.S. STORMWATER MANAGEMENT DESIGN WET DETENTION POND#2 RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 03030004 5.5" 5.5" RISER 3:1 5' MIN. GRASS FOREBAY WEIR AT ELEV=254.0 FOREBAY TOP ELEV=256.0 WIDTH AT TOP=2.0 FT RISER STRUCTURE 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. 4"x4" PVC TEE PERM. POND ELEV.=255.0 24"DIA. HOLE DRILLED J INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN SEDIMENT STORAGE TOP THE FOREBAY WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. FOREBAY BOTTOM ELEV=253.0 NORMAL POND ELEVATION BOTTOM OF SEDIMENT -� STORAGE/EXIT ELEV=252.5 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUS PLANTS 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE �- 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=252.0 SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) SPACING PLANTING SEASON lancus effusus Soft Rush SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER ris virginica Blue Flag Iris SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER ichoenoplectus tabernoemontani Soft Stem Bulrush SHALLOW WATER 149 PEAT POT 6' O.C. SPRING/SUMMER Eupotoriodelphus moculatus Spotted Trumpetweed SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER Eupatorium purpureum Joe-Pye Weed SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER Rhynchospora colorato Starrush Whitetop SHALLOW LAND 149 PEAT POT 6' O.C. SPRING/SUMMER #4 REBAR ® 12" OC IN FRONT & REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC. COVER FROM EDGE OR FACE OF COLLAR NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON -FLY ASH. 2. APPLY I" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES. 4. TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER. ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 TYPE 1: ASTM-D-2822-75 TYPE 1. DRAINAGE AREA TO POND: 12.68 ACRES SITE IMPERVIOUS AREA TO POND: 5,98 ACRES OFF DESIGN IMPERVIOUS AREA TO POND: 0.00 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.98 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED THROUGH POND DRAINAGE AREA: 12.68 AC 12.68 AC CURVE NUMBER: 54.4 75.3 1.0" STORM EVENT: 0.150 CFS 0.005 CFS i-YEAR STORM EVENT: 0.655 CFS 21.60 CFS 0.174 CFS 2-YEAR STORM EVENT: 2.257 CFS 31.26 CFS 0.945 CFS 10-YEAR STORM EVENT: 10.92 CFS 60.56 CFS 10.38 CFS 100-YEAR STORM EVENT: 31.91 CFS 111.73 CFS 20.07 CFS TYPICAL LITTORAL SHELF PLANTING SCHEDULE 4" PVC iH RISER URE OPERATION & MAINTENANCE BMP element: Potential roblem: How I will remediate the problem The entire SCM Trash/debris is present Remove the trash/debris The perimeter of the wet pond Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully, plant ground cover and water until it is established. Provide lime and a one-time fertilizer application The inlet device The inlet pipe is clogged (if applicable) Unclog the pipe. Dispose of the sediment in a location where it will not cause impacts to streams or the SCM The inlet pipe is cracked or Repair or replace the pipe otherwise damage (if applicable) Erosion is occurrin in the Regrade the swale if necessary swale (if applicable and provide erosion control devices such as reinforced turf matting or riprap to avoid future erosion problems The forebay Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy theproblem if the original design depth for possible. Remove sediment and dispose it in location it sediment storage of a where impacts to streams will not cause or the SCM Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent fufure erosion problems Weeds are present Remove the weeds, preferably, by hand. If pesticide is used, wipe, it on the plants rather than spraying The vegetated shelf Best professional practices show Prune according to best professional that pruning is needed to maintain optimal plant health practices Plants are dead, diseased or Determine the source of the problem: dying soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe, it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the on anal Search for the source of the sediment and remedy the problem design sediment storage depth if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM Algal growth covers over 50% Consult a professional to remove and of the area control the algal growth Cattails, phragmites or other Remove the plants by wipin them invasive plants cover 50% of with pesticide (do no spray the basin surface The embankment Shrubs have started to grow on Remove shrubs immediately the embankment Evidence of muskrat or beaver Consult a professional to remove activity is present muskrats or beavers and repair any holes or erosion A tree has started to grow on Consult a dam safety specialist the embankment to remove the tree An annual innspection by an Make all needed repairs immediately appropriate professional shows that the embankment needs repair The outlet device Clogging has occurred Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM The outlet device is damaged Repair or replace the outlet device e receiving water Erosion or other signs of damage have occurred at the Repair the damage and improve the flow dissipation structure outlet. Discharges from the wet pond cgntact the local NCDEQ Regaionl Office are cau ing erosi n or seaimen ation inhe receiving water CONSULTANT: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 cpardo@bowman.com p ;oFEss/oy,�y% SEAL 051571 •.'vG°I NEB.• O: i �' '•• ..••' ���� •,�4 0 E. OWNER/DEVELOPER: Lee Humphrey Double D Engineering,PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 (Office) 910-206-1808 (cell) lee@doubledeng.com Z LLJ ® �-- (D Q z Q U Z L AJ z ® � ® CD L. J Q J � U U (D Li LJLl This document, together with the concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Bowman North Carolina, Ltd. shall be without liability to Bowman North Carolina, Ltd. Drawn Checked Approved Project No: 048019 Date: January 5, 2022 Title STORMWATER CONTROL MEASURE DETAILS Sheet No. SCM-2