HomeMy WebLinkAbout310789_Compliance Evaluation Inspection_20220919 (2)(V2
?acility umber
. Division ofWateraResources
O Division of Soil and;Water'Con servation
O Other Agency
Type of Visit: p Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:
Farm Name:
Owner Name:
Arrival Time:
r ` Cr,,✓ahGv)I ."
Departure Time:
Mailing Address:
Physical Address:
Facility Contact:
So
Owner Email:
Phone:
County:
Region:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
cAND
Latitude:
Integrator:
Phone:
Certification Number:
Certification Number:
Longitude:
Swim
Design Current
CapacityPop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
°Design Current
Wet Poultry Capacity Pop.
Layer
Non -Layer
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑NA ❑NE
❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) 0 Yes 0 No ❑'IAA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No [ TA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ENo ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3
5/12/2020 Continued
Facility Number: \ - ) s%c‘
Date of Inspection: 1 1 tcl
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
a. If yes, is waste level into the structural freeboard?
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No ❑.PEA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
❑ Yes
❑NA ❑NE
i
❑NA/❑NE
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑' No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN El PAN > 10% or 10 lbs. El Total Phosphorus El Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
❑ Yes IYNo ❑ NA ❑ NE
61\--10 ❑NA ❑NE
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA El NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box.
❑ WUP El Checklists El Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0/No ❑ NA ❑ NE
El Waste Application ❑ Weekly Freeboard El Waste Analysis ❑ Soil Analysis El Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield El 120 Minute Inspections El Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [ No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 5/12/2020 Continued
❑ Yes ❑ No ❑ NA .❑ NE
❑ Yes ❑'No ❑NA ❑NE
❑ Yes No El NA ❑ NE
❑ Yes 0No ❑ NA ❑ NE
❑ Yes No El NA ❑ NE
Facility Number: 3 ( -
Date of Inspection: el, / (
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
the appropriate box(es) below.
❑ Failure to complete annual sludge survey
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑Failure to develop a POA for sludge levels
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Er\ -TO ❑ NA
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [/]DNA
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ‘ ❑ NA
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ Yes
❑ Yes
❑ Yes ❑ No ❑ NA
No ❑ NA
❑ NA
❑ NA
❑ NE
❑ NE
❑ NE
❑ NE
❑ NE
F:‹—E
❑ NE
❑ NE
❑ NE
Comments (prefer to question #):;Explain any, YES answers and/or any`additional reconimeridations oir:any. other commeni
tie drawings of facility to better explarn situations (use additional, pages, as necessary):
0, yv\_, 3 sc,.!\
*c 04, - cl �0
� Cr� � � c��(-----,2R(D„,?(-)
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone:
Date:
\`‘k\-1_`Iv
S-143S1�
5/1 /2020