Loading...
HomeMy WebLinkAbout20221367 Ver 1_PART 4 - Executive Summary_Big Buffalo__20220926TECHNICAL APPROACH AND RESTORATION PLAN BIG BUFFALO MITIGATION SITE CHATHAM COUNTY, NORTH CAROLINA RFP #16-452048014 - FULL DELIVERY PROJECTS TO PROVIDE STREAM AND RIPARIAN WETLAND MITIGATION CREDITS WITHIN CATALOGING UNIT 03030003 OF THE CAPE FEAR RIVER BASIN PART 4: EXECUTIVE SUMMARY Restoration Systems (RS) is pleased to provide you with this proposal in response to the Request for Proposals (RFP) #16-452048014 dated June 28, 2022. This proposal describes the merits of the Big Buffalo Mitigation Site (Site). The general content of this technical proposal includes the following: Project Staffing and Organization — Part 5 Technical Approach — Part 6 - Project goals, objectives, description, development, and success criteria - Proposed mitigation - Current ownership and long-term protection of the Site - Project phasing/implementation schedule - Project success criteria - Quality control procedures Completed and signed RFP Attachments (D-G) Completed Technical Scoresheet The Site occurs within 14-digit Cataloging Unit 03030003070010 along North Prong Rocky River and unnamed tributaries to North Prong Rocky River. The Site is located approximately 2.3 miles southwest of Liberty, in the northwest corner of Chatham County. The Site is in a Water Quality Targeted Resource Area (TRA), a Habitat TRA, a Hydrology TRA, a Targeted Local Watershed (TLW), and a Local Watershed Planning (LWP) area. As summarized in the following table, the proposed mitigation was calculated per the requirements stipulated in RFP #16-452048014. Mitigation Activities and Site Credit Potential Summary Stream Mitigation Type Type Linear Feet Ratio SMUS Restoration Priority 1 10,207.458 1:1 10,207.458 Enhancement Level 1 1,932.773 1.5:1 1,288.515 Enhancement Level 11 589.177 2.5:1 235.671 Enhancement Level 11 1037.373 7.5:1 138.316 Enhancement Level 11 5,475.117 10:1 547.512 Preservation NA 1,741.896 10:1 174.190 Totals 20,983.794 linear feet 12,591.662 SMUs Stream Buffer Credit Adjustment* 816.278** Total SMUs 13,407.940 SMUs *See Figure 8 (Appendix A) and the Wilmington District Stream Buffer Credit Calculator Output Table (Appendix A) for stream buffer credit adjustment output and results. **Additional credit generated by stream buffer credit adjustment was reduced by 5% to account for the margin of error due to the lack of a design stream alignment at the current phase of project development. Big Buffalo Mitigation Site Part 4— Executive Summary Technical Proposal (RFP # 16-452048014)