Loading...
HomeMy WebLinkAboutWQ0035358_Application (FTSE)_20110613OF WAT,9 �,.. ,�;. �r 005535 State of North Carolina �� •p �'' �� ri �_t, D partment of Environment and Natural Resources O G CO r Division of Water Quality JUN 132011 o FAST -TRACK APPLICATION (FTA 12/07 ver5) for GRAVITY SEWERS; PUMP STATIONS, AND FORCE MAINS (Pressure & Vacuum sewer systems arc not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. Forms are available from the web site or by calling the Regional Office serving your county: http://h2o. enr. sta te. nc. us/peres/Collection%20Systems/Collection SystemApplications. html ® A. Application Form - Submit one original and one copy of the completed and appropriately executed application form. The application should include a project narrative describing the final build -out design (i.e. system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, clearly explain the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information that has already been included in the original permit. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item B(13). Separate applications should be made for non-contiguous sewer systems. B. Application Fee - Submit a check in the amount of $480 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. ❑ C. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2)a of this application. ❑ D. Operational Agreements — Submit one original and two copies of a properly executed operational agreement, as per 15A NCAC 02T .0115, if the application is submitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a home or property owner's association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT MAY BE TURNED OVER TO A MUNICIPALITY UPON COMPLETION, FORM DEV 02/03 IS REQUIRED. E. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance — FORM FTSE 10/07 (Flow Tracking/Acceptance for Sewer Extension Permit Applications) is required with every application. The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting FORM FTSE-10/07) certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. Where the applicant is not the owner of the downstream sewer, submit two copies of FORM FTSE 10/07 from the owner of the downstream sewer and owner of the WWTF, if different. The flow acceptance indicated in FORM FTSE-10/07 must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and FORM FTSE-10/07 indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). Intergovernmental agreements or other contracts will not be accepted in lieu of project -specific FTSE 10/07. F Map — Submit an 8.5-inch by 11-inch COLOR copy of a USGS Topographic Map of sufficient scale to identify the entire project area and the closest surface waters. Each map or maps must show the location of the sewer line and pump stations and be of reproducible quality. Include a street level map showing the downstream connection point, and the permit number for the downstream sewer, if known. FTA 12/07 ❑ G. Stream Classifications — Watershed Classification Attachment (Form WSCAS-12/07) If any portion of the sewer system project is within 100 feet of any surface water or wetlands, the Watershed Classification Attachment may need to be completed. A variance must be requested for encroachment within required setbacks or buffers pursuant to 2T .0305 (f) and be indicated in Item B-13 with supporting documentation/justification provided. ❑ H Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C], this application cannot be used. Send the project application on the most current version of Form PSFMGSA to the Design Management Unit, 1633 Mail Service Center, Raleigh, NC 27699-1633. Applications cannot be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ❑ I. Flow Direction — Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with this project, please indicate in B(12) and give the permit number of the second treatment facility. ® J. Certifications — Section C The application must be certified by both the applicant and the design engineer who is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1 b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. THE COMPLETED FTA 12/07 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $480 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778 (828) 296-4500 (828) 299-7043 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5094 (910) 433-3300 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland. - Mooresville Regional Office 610 E. Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 791-4200 (919) 788-7159 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 (910) 350-2004 Fax Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 (336) 771-5000 (336) 771-4630 Fax Alamance, Alleghany, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surly, Watauga, Wilkes, Yadkin For more information, please visit our web site at: http://h2o.enr.state. nc. us/peres/Collection%20Systems/CollectionSystemsHome. html or contact the Regional Office serving your county. FTA 12/07 Z 0 H 2 re 0 LL Z Z 0 1— a U_ J a a Q Z 0 1- 5 0 LL Z i- 2 cc a. m ' USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) 1, r j��� 1. Owner/Permittee: 1 a. City of Goldsboro Full Legal Name (company, municipality, HOA, utility, etc.) 1 b. Tasha Logan, Interim City Manager Signing Official Name and Title lc. The legal entity who will own this (Please system review 15A NCAC 2T .0106 (b) for authorized is: signing officials!) ❑ Other (specify): ■ Individual ❑ Federal y Municipality ■ State/County ■ Private Partnership ■ Corporation ld. P.O. DrawerA le. Goldsboro Mailing Address City 1f. North Carolina lg. 27533-9701 State Zip Code lh. (919) 580-4330 1i. (919) 580-4344 1j. tlogan@ci.goldsboro.nc.com Telephone Facsimile 2. Project (Facility) Information: E-mail Extension 2b. Wayne 2a. Balboa Properties Site Sanitary Sewer Brief Project Name (permit will 3. Contact Person: refer to this name) County Where Project is Located Engineer — Cox -Edwards Company 3a. David A. Sutton, P.E. — Design Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (919) 751-5100 3c. davidsutton@birch.net Phone Number E-mail 1. Project is ■ New ■ Modification (of an existing permit) If Modification, Permit No.: WQ0035358 B(3)) (go to Item 2(a)) 2. Owner is ►1 Public (skip to Item ■ Private 2a. If private, applicant will be: 2b. church, single office, etc.) or etc. - skip to Item B(3)) etc. - go to Item B(2b)) If sold, facilities owned by a (must choose one) (Instruction C) Assoc./Developer (Instruction D) ■ Retaining Ownership (i.e. store, • Public Utility • Leasing units (lots, townhomes, ■ Homeowner • Selling units (lots, townhomes, 3. City of Goldsboro Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. Goldsboro Reclamation Facility 4b. NC0023949 Name of WWTF WWTF Permit No. 5a. City of Goldsboro 5b. 12" Gravity ■ Force Main 5c. Owner of Downstream Sewer 6. The origin of this wastewater is Receiving (check Sewer Size all that apply): Permit # of centers) Downstream Sewer (Instruction E) 100 % Domestic/Commercial (Stores, shopping Home (specify): • Residential Subdivision 4 Retail % Industrial (attach • Apartments/Condominiums ■ Institution ■ Hospital ■ Mobile Home Park description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): • School ■ Church • Restaurant ■Nursing ►�� Office ■ Other or permitted for 7. Volume of wastewater to be allocated this particular allocations will be permitted project: 0 gallons per day *Do not include future flows 8. If the permitted flow is zero, indicate or previously why: in of existing permitted Line where flow Permit No. in subsequent permits that connect to this line NCAC 02T .0303 to determine if a ■ Pump Station, Outfall or Interceptor ■ Flow has already been allocated • Rehabilitation or replacement permit is required) sewer with no new flow expected (see 15A FTA12/07 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8 inch PVC (SDR 35) Length (feet) 998 feet New Gravity or Additional Force Main New Gravity 0 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) W Pump Station Location ID _N/A (self chosen - as shown on planslmap for Z Z Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length O 2 - portable generator w/MTS 0 Z O Q Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; O 2 - portable generator w/MTS m Force Main Size Force Main Length 12. Will the wastewater flow in the proposed sewer Tines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 2nd treatment facility (RO - if "yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ❑ Yes ® No If No, please reference the pertinent minimum design criteria or regulation and indicate why a +44 `, ZI / variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS P RTINENT TO THH VARIANCE WITH YOUR APPLICATION L(sit: t, 41013rov-e cy-e_ ✓ 4 i-vs;c- Dr 0? on 62 he in The MDC for gravity sewers says the min. size MH for an inside drop is 5'. Due to extremely wet conditions around the existing 22' deep - 4' diameter MH and close proximity to a heavily traveled DOT roadway, a variance is requested to allow an inside drop on the existing MH. FTA12/07 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? ❑ Yes ® Yes El Yes ❑ No ❑ No El No ® N/A ❑ N/A ® N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months No Check if Yes: ❑ and provide details 1. 1 a. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, Tasha Logan attest that this application for Balboa Properties Site Sanitary Sewer Extension has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as welj as civil penalties up t�S, 25,000 per violation. Signing Official Sign ,4k �,1' 11 ate ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY q TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 Z O Q2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) O 1, David A. Sutton attest that this application for Balboa Properties Site Sanitary Sewer Extension has been U- reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. i further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria W for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump O Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials V under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. David A. Sutton, PE Professional Engineer Name 2b. Cox -Edwards Company, Inc. Engineering Firm 2c. 1205 Parkway Drive Mailing Address 2d. Goldsboro City 2e. NC 2f. 27534 State Zip 2g. (919) 751-5100 2h. (919) 751-1744 2i. davidsutton@birch.net svaKnttet4 4. (Sr' f 4 • Telephone Facsimile E-mail NC PE Seal, Signature & Date FTA12/07 OF.i=T�F9 State of North Carolina \4G Department of Environment and Natural Resources 7 Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: City of Goldsboro Project Name for which flow is being requested: Balboa Prop. Site Sanitary Sewer Ext. More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Goldsboro Water Reclamation Facility b. WWTP Facility Permit #: NC0023949 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 14.2 0.4646 8.35 0 8.8146 62.07% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD Westbrook Road Pump Station 18.0 8.35 III. Certification Statement: Tasha D. Logan , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accept(ce 9f this w. er flow. Signing Officia Si nat, re / Date PROJECT NARRATIVE BALBOA PROPERTIES SITE SANITARY SEWER EXTENSION APRIL 15, 2011 The Balboa Properties Site Sanitary Sewer Extension project involves the extension of an eight inch sanitary sewer line into a proposed subdivision zoned for neighborhood business and office and institutional development. The proposed sanitary sewer line will be located within the right- of-way of Newhare Drive, a proposed public street. The subdivision is located at the intersection of S.R. 1003 (New Hope Road) and S.R. 1570 (Hare Road) inside the Goldsboro city limits. The proposed 8 inch sanitary sewer line will tie into an existing 12 inch City of Goldsboro sanitary sewer line and will extend approximately 1000 feet down Newhare Drive and terminate in a manhole. The proposed sanitary sewer line is sized to provide adequate service to the new development. The line is approximately 6.5 feet deep at its terminous and may be extended as required. The City of Goldsboro, the owner of the receiving sanitary system and applicant for the proposed extension, is the owner of the Wastewater Treatment Facility that will treat wastewater from the proposed extension. The WWTF permit no. is NC00239949. David A. Sutton, PE, with Cox - Edwards Company, Inc. 1205 Parkway Drive, Goldsboro, NC is the engineer of record. The total engineering and construction costs for the proposed extension is approximately $49,500.00 /va e C t,)(47 /or- P457 4// oro pot "-aF Ravenwood Permit Number WQ0035358 Central Files' APS SWP 06/20/11 Permit Tracking Slip Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer thom.edgerton Coastal SW Rule Permitted Flow 0 Facility Fast Track Facility Name Balboa Properties Site Sanitary Sewer Extension Sewer Location Address Newhare Dr Goldsboro NC 27533 Status Project Type In review Major modification Version B Permit Classification Individual Permit Contact Affiliation Major/Minor Minor Region Washington County Wayne Facility Contact Affiliation Owner Name City of Goldsboro Dates/Events Owner Type Government - County Owner Affiliation Joseph R. Huffman City Manager PO Drawer A Goldsboro NC 275339701 Orig Issue 05/10/11 App Received 06/13/11 Regulated Activities Institution. other Office Retail Wastewater collection Outfall NUL Draft Initiated Scheduled Issuance Public Notice Issue Effective 06/21/11 06/21/11 Requested/Received Events Additional information requested Additional information received Expiration Waterbody Name Stream Index Number Current Class Subbasin Edgerton, Thom From: Sent: To: Subject: Hello, Edgerton, Thom Thursday, June 09, 2011 3:11 PM 'David Sutton' RE: City of Goldsboro San Sewe Extension - Prop Drop MH Sorry for the delay. I have received concurrence that a modification application and fee will be required for the processing of the alternative design. Submit the package and I will process it as quickly as possible. Please let me know if you need any additional information. Thanks. Thom 't NCDENR Division of Water Quality Washington Regional Office 943 Washington Square Moll Washington, NC 27889 (252) 948-3963 Office (252) 94h-9215 Fax E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Thom Edgerton Environmental Engineer Surface Water Protection thom.edoertonca ncdenr.gov From: David Sutton Imailto:davidsutton@birch.ne1 Sent: Thursday, June 09, 2011 11:24 AM To: Edgerton, Thom Subject: Re: City of Goldsboro San Sewe Extension - Prop Drop MH Hi Thom, I talked to Seth this past Monday and he indicated that he would not object to the request to construct an inside drop connection at this loccation considering the problems associated with tge high water table and the close proximity to the highway. He told me he would get back with you. What do I need to do next to proceed with the change? We are ready to proceed with the sewer installation. Thank you for your assistance. David Sutton Original Message From: Edgerton, Thom To: davidsutton a(�birch.net Cc: Robertson, Seth Sent: Friday, June 03, 2011 11.34 AM Subject: FW: City of Goldsboro San Sewe Extension - Prop Drop MH Hello, An "Alternative Design" approval would be required prior to a Modification request to the Fast Track Permit. The regulations require a minimum 5' diameter MH for inside drops, therefore I am unable to process an application without prior variance approval. That request would be made through Seth Robertson, PE, CG&L. Please let me know if you need additional information. Thanks, Thom E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Edgerton, Thom Sent: Friday, June 03, 2011 9:50 AM To: Bryant, J Subject: FW: City of Goldsboro San Sewe Extension - Prop Drop MH Please let me know what you think about this. The MDC says the minimum size MH in order to allow a drop, is a 5' diameter MH. The Eng. states that the plan shows the existing MH as 5', but construction has revealed the existing to be a 4' diameter precast MH that was installed in approximately 2003. He states the MH is about 22' deep, and is concerned of wet conditions and complications arising while digging that deep. What's your call on allowing an inside drop within a 4' diameter MH? Please let me know when you would like to discuss. Thanks, Thom E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: David Sutton fmailto:davidsutton©birch.net] Sent: Thursday, June 02, 2011 4:11 PM To: Edgerton, Thom Subject: City of Goldsboro San Sewe Extension - Prop Drop MH Hi Thom, I am attaching a letter detailing what we would like to do regarding the drop manhole I discussed with you on the phone today. Please call me at (919) 751-5100 after you have had time to look it over. Thank you for your help. David A. Sutton, PE PLS Cox -Edwards Company 1205 Parkway Drive Goldsboro, NC 27534 (919) 751-5100 2 CE COX-EDWARDS COMPANY, INC. CONSTRUCTION AND ENGINEERING Established 1966 License No. 5046 June 10, 2011 1205 Parkway Drive Goldsboro, NC 27534 Email: contact@cox-edwards.com NCDENR, Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Attn: Mr. Thom Edgerton Tel. No.919-751-5100 Fax No. 919-751-1744 JUN 1 3 2011 Re: Fast Track Application Revised ( Permit No. WQ0035358) Balboa Properties Site — Sanitary Sewer Extension Modification Involving Outside Drop MH to Inside Drop MH on 4' diameter MH Goldsboro, North Carolina Dear Mr. Edgerton: Please find enclosed the following documents: 1) Fast -Track Application for Gravity Sewers, Pump Stations, and Force Mains — two (2) copies 2) Project Narrative — two (2) copies 3) A check payable to NCDENR in the amount of $480.00 for the application fee 4) Flow Tracking/Acceptance for Sewer Extension Permit Applications — two (2) copies 5) Copy of portion of Northeast Goldsboro USGS Topographic Map identifying the project area and the closest surface waters — two (2) copies Please call me at (919) 751-5100 if you should need additional information. Sincerely, COX-EDWARDS COMPANY, Inc. Enclosures