Hello,
Edgerton, Thom
Thursday, June 09, 2011 3:11 PM
'David Sutton'
RE: City of Goldsboro San Sewe Extension - Prop Drop MH
Sorry for the delay. I have received concurrence that a modification application and fee will be required for the processing
of the alternative design. Submit the package and I will process it as quickly as possible.
Please let me know if you need any additional information.
Thanks,
Thom
Alt721.
NICDERirt
Division of Wafer Quality
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
(252) 948-3963 Office
(252) 946-9215 Fax
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL
RESOURCES
Thom Edgerton
Environmental Engineer
Surface Water Protection
thom.edgerton@ncdenr.gov
From: David Sutton Jmailto:davidsutton@birch.neti
Sent: Thursday, June 09, 2011 11:24 AM
To: Edgerton, Thom
Subject: Re: City of Goldsboro San Sewe Extension - Prop Drop MH
Hi Thom,
I talked to Seth this past Monday and he indicated that he would not object to the request to construct an inside drop
connection at this loccation considering the problems associated with tge high water table and the close proximity to the
highway. He told me he would get back with you.
What do I need to do next to proceed with the change? We are ready to proceed with the sewer installation.
Thank you for your assistance.
David Sutton
Original Message
From: Edgerton, Thom
To: davidsutton(c�birch.net
Cc: Robertson, Seth
Sent: Friday, June 03, 2011 11:34 AM
1
Subject: FW: City of Goldsboro San Sewe Extension - Prop Drop MH
Hello,
An "Alternative Design" approval would be required prior to a Modification request to the Fast Track Permit. The
regulations require a minimum 5' diameter MH for inside drops, therefore I am unable to process an application without
prior variance approval. That request would be made through Seth Robertson, PE, CG&L.
Please let me know if you need additional information.
Thanks,
Thom
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.
From: Edgerton, Thom
Sent: Friday, June 03, 2011 9:50 AM
To: Bryant, J
Subject: FW: City of Goldsboro San Sewe Extension - Prop Drop MH
Please let me know what you think about this. The MDC says the minimum size MH in order to allow a drop, is a 5'
diameter MH. The Eng. states that the plan shows the existing MH as 5', but construction has revealed the existing to be
a 4' diameter precast MH that was installed in approximately 2003. He states the MH is about 22' deep, and is
concerned of wet conditions and complications arising while digging that deep. What's your call on allowing an inside
drop within a 4' diameter MH?
Please let me know when you would like to discuss.
Thanks,
Thom
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.
From: David Sutton [mailto:davidsutton@birch.net]
Sent: Thursday, June 02, 2011 4:11 PM
To: Edgerton, Thom
Subject: City of Goldsboro San Sewe Extension - Prop Drop MH
Hi Thom,
I am attaching a letter detailing what we would like to do regarding the drop manhole I discussed with you on the phone
today. Please call me at (919) 751-5100 after you have had time to look it over. Thank you for your help.
David A. Sutton, PE PLS