HomeMy WebLinkAbout20140851 Ver 1_USACE Permit_20141103U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW- 2014 -01609 County: Surry U.S.G.S. Quad: NC -MOUNT AIRY SOUTH
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Address:
Telephone Number:
City of Mount Airy
Mitch Williams, CE
440 East Pine Street
Mount Airy, NC 27030
336- 786 -3580
Size (acres)
2 acres (approximately)
Nearest Town
Mount Airy
Nearest Waterway
Lovills Creek
River Basin
Upper Yadkin. Virginia, North Carolina.
USGS HUC
3040101
Coordinates
Latitude: 36.4826463274816
Longitude: - 80.6078063373549
Location description:
The site is located along a 2.2 mile segment of Lovills Creek and the Ararat River near the Newsome
Street, State Highway
52 intersection in Mt. Airy,
North Carolina.
Description of projects area and activity: This authorization is for permanent impacts to jurisdictional wetlands associated with
the construction of a 2.2 mile greenwav trail along Lovills Creek and the Ararat River as follows: Crossing #1 ( Impact #WI,
36.4824, - 80.6075): Wetland WF -0.03 acre of permanent fill for greenwav construction. Crossing #2 (Impact #W2, 36.4798, -
80.6006): Wetland WC -0.006 acre of permanent fill for greenwav construction.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 14 Linear Transportation
Proiects.
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated August 8, 2014 including updated information
provided on October 8, 2014. Any violation of the attached conditions or deviation from your submitted plans may subject
the permittee to a stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified,
suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or
modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of
the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the
activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are
under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the
activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Quality (telephone 919 - 807 -6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA),
prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808 -2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals /permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Andrew Williams at 919 -554 -4884 x26 or Andrew .E.Williams2(&usace.army.mil.
'git.11y signed by—LIAM—REWE,12a4161—
A /, • L eDN —S, -U.5. GOV-- ,— DOD, —PKI,
Corps Regulatory Official: L! _� a °`« _ -0_� E'39 " "' Date: 11/04/2014
Expiration Date of Verification: 03/18/2017
Determination of Jurisdiction:
A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project
area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
( Reference 33 CFR Part 331).
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of
Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued . Action ID: SAW-
Basis For Determination: Lovills Creek, is a relatively permanent water (RPW) and is a tributary to the Ararat
River, a traditionally navigable water (TNW), in the lower reaches. The Ararat River, is a tributary to the Yadkin River, a
TNW. The Yadkin River is a tributary to the Pee Dee River, a navigable water of the United States. The Ordinary High Water
Marks (OHWMs) of the Lovills Creek and the Ararat River were indicated by bed and banks shown on the applicants
drawings. Wetlands identified as WA, WE, WF and WG are abutting the Ararat River. Wetlands idenfied as WB, BC and BE
are abutting Lovills Creek. All wetlands meet the hydrophytic vegetation, wetland hydrology, and hydric soil criteria of the
1987 Corps of Engineers Wetland Delineation Manual and the Eastern Mountains and Piedmont Regional Supplement.
This jurisdictional determination is only for the wetlands proposed for impacts associated with this Nationwide Permit
verification and does not include any other waters /wetlands that may be located on the project site.
Remarks: None
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B
and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303 -8801
Phone: (404) 562 -5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by January 2, 2015.
* *It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. **
DN. —5, WIWAMS.t, D DID, ou =DOD, au =PKl, ou =USA,
_WILUAM Corps Regulatory Official. D_2014.11 PEWE.1344561665
Oafe: 2019.11.09 06:49:38 - 05'00'
Andrew Williams
Date of JD: 11/03/2014
Expiration Date of JD: November 4, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our customer Satisfaction Survey online at http: / /re ug latory.usacesurvey.co .
Copy furnished:
Jacob Byers
Michael Baker International, LLC
797 Haywood Road, Suite 201
Asheville, NC 28806
Sue Homewood
North Carolina Department of Natural Resources
Division of Water Resources
585 Waughtown Street
Winston - Salem, NC 27107
Action ID Number: SAW- 2014 -01609 County: Surry
Permittee: City of Mount Airy
Mitch Williams, CE
Project Name: Mt. Airy, City of /Greenway Connector Project
Date Verification Issued: 11/04/2014
Project Manager: Andrew Williams
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Andrew Williams
3331 Heritiage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and /or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date
EL NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: City of Mount Airy
Mitch Williams, CE
File Number: SAW- 2014 -01609
Date: 11/04/2014
Attached is:
See Section below
❑
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)
A
❑
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
❑
PERMIT DENIAL
C
❑
APPROVED JURISDICTIONAL DETERMINATION
D
®
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http: / /www.usace.gM.mil/ Missions /Civil Works /Re ug latoryProgramandPermits.aspx
or the Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division, Attn:
Mr. Jason Steele, Administrative Appeal Review Officer
Andrew Williams
CESAD -PDO
3331 Heritiage Trade Drive, Suite 105
U.S. Army Corps of Engineers, South Atlantic Division
Wake Forest, North Carolina 27587
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303 -8801
Phone: (404) 562 -5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date:
Telephone number:
Signature of appellant or agent.
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal
Officer, CESAD -PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303 -8801
Phone: (404) 562 -5137