Loading...
HomeMy WebLinkAbout20141078 Ver 1_More Info Letter_20141021Don and Jeanie Richards, 211 Poplar Dr. Elizabeth City NC 27909 October 20, 2014 RECEIVED OCT 2 1 2014 ED M° NAF O Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources -Water Quality Regional Operations Section 943 Washington Square Mall Washington, NC 27889 Dear Anthony: This letter is in response to your request for additional information concerning my major permit for bulkhead replacement. I am noting the reasons for my bulkhead alignment request as they were explained to me by the representatives at the Elizabeth City CAMA Office. My drawing indicates a request to start the bulkhead on the North end by going out and connecting to the furthest point out of the existing bulkhead for the neighboring property. This would eliminate the comer between the two properties. The corner is southwest facing, is subject to prevailing wind, and collects waves that causes consistent over wash that pounds the steep sloping bank on the north side. The over wash is causing continual erosion of my property and the adjoining property. Aligning the new bulkhead with the adjacent existing erosion control structure will minimize future erosion issues in the north corner. Extending the new bulkhead in a straight line southward to connect with the existing bulkhead will eliminate the second corner that is approximately 37 feet to the south. This comer is also a source a wave focus that contributes to the elevated over wash for westerly waves. Enclosed are pictures of the referenced corner for your consideration. Pictures 1 -3 Attempt to show elevation Picture 4 Latest erosion this past week Picture 5 Existing bulkhead /rip rap of adjoining property (Wooden Stake = Approximate Location of Property Pin) Sincerely, Don Richards 0�'O- 444.'Of CC Will Creef, DCM Elizabeth City N w MR v