Loading...
HomeMy WebLinkAboutNC0004979_Surface Water and Seep Monitoring_20141015 ' Allen Steam Station Surface Water and Seep Monitoring ' August and September 2014 ' Introduction Flow and water quality measurements were collected from nine seep sampling locations (S-1 through S- 9)and two surface water locations near the ash basin (Lake Wylie-Upstream and Lake Wylie- Downstream)associated with Duke Energy's Allen Steam Station, located in Gaston County, North Carolina. The purpose of the sampling, which was conducted in late August and early September 2014, ' was to measure seepage flows and provide sufficient depth to allow collection of water quality samples for laboratory analysis. Samples were collected via a combination of methods as described below. See Figures 1 and 2 for maps of the approximate sampling locations. Descriptions of the seep sampling locations are provided in Table 1. Seep Flow Measurement Method and Results A V-notch weir apparatus was utilized at locations S-1, S-2, S-3, and S-4 to impound the seepage in a channel, which concentrated discharge to a central location that allowed for flow measurements to be obtained.The weirs were constructed from %-inch-thick Plexiglas board material. Each device was ' inspected after installation and prior to sampling to confirm sufficient flow and depth for sampling, and to verify that only minimal leakage, if any, was present. Sufficient time was allowed for the impounded seepage flows to reach equilibrium discharge flow before flow measurement and sampling. ' Flow measurements at seep sampling locations S-5, S-6, and S-7 were collected by installing a 2-inch- diameter PVC pipe into the ground surface where the seep emerged. Seepage in these locations was I diffuse,with no defined channel. Each PVC pipe was inserted in the location to direct flow through the pipe. Flow from the pipe was observed until the discharge appeared to be clear of visible fines prior to sampling for water quality analysis. Flow measurements at locations S-8 and S-9 were collected from two outfalls consisting of 12-inch- diameter corrugated metal pipes (CMP). Based on a conversation with Duke Energy personnel familiar ' with the site, the source of water discharging from these pipes is unknown. These outfalls exhibited flow during a dry-weather visual assessment consisting of least 72 hours prior to a rainfall event. The source of persistent flow from these outfalls is assumed to be groundwater and not stormwater. The seepage flows at locations S-1 through S-9 were measured using the timed-volumetric method. A volume of water was collected from the discharge of the weir directly into an appropriately sized container. Volumes(in mL)were measured in the field utilizing a graduated container.The amount of time(in seconds) needed to collect the volume of water was recorded and flows (in MGD)were calculated for the timed-volume.The calculated flows(in MGD)at each seep location are presented in Appendix A. Seep Water Quality Sample Collection Method and Results ' Water quality samples were collected at locations S-1 through S-9. To minimize potential effects of stormwater runoff, seep samples were collected during a period with minimal preceding rainfall. Samples were collected from the discharge flow at the flow measurement devices described above or directly from the seep into sample bottles while minimizing disturbance and entrainment of soil/sediment. ' Analytical parameters for analysis were: TSS, TDS, Oil &Grease, CI, SO4, F, COD, Al, As, B, Ba, Ca, Cd, 1 1 1 ' Cu, Cr, Fe, Mn, Mo, Mg, Ni, Pb, Sb, Se, TI, Zn, Hardness, and Hg. Storage and preservation techniques of the samples, after collection and prior to analyses, were followed according to Appendix B. Analyses were conducted by Duke Energy's Huntersville analytical laboratory(NC Wastewater Certification#248) and Pace Analytical Laboratories(NC Wastewater Certification# 12). Laboratory analytical methods used for each parameter are provided in Table 2 and analytical results are presented in Appendix A. Seep In-situ Measurement Method and Results 1 In-situ field parameters (temperature, pH, and specific conductance)were measured at locations S-1 through S-9 utilizing calibrated field meters either at the discharge of the seep directly, at the discharge of ' the flow measurement devices, or in the water pool created behind the device, if sufficient water depth did not exist at the device discharge.The analytical results are presented in Appendix A. Lake Wylie Water Quality and In-situ Sample Collection Method and Results Water quality samples and in-situ measurements from were collected at a location upstream (Lake Wylie- Upstream) and downstream (Lake Wylie-Downstream)of the ash basin(Figure 2).The grab samples were collected from the surface (0.3 m)directly into appropriate sample bottles. Preservation and analyses methods for the lake samples are provided in Table 2 and Appendix B.The analytical results are ' presented in Appendix A. Recommendations The low volume of flow at each seep location, coupled with the relatively low constituent concentrations in the samples, suggests that there is little potential for Allen Steam Station to influence water quality in Lake Wylie. If reasonable potential analyses demonstrate that there is no potential to exceed water quality ' standards, then Duke Energy proposes to re-evaluate the seep locations listed in this document annually over the next 5-year permit cycle.These annual evaluations would be documented and would verify the condition of the existing seeps and determine the presence of new seeps. ' The North Carolina Department of Environment and Natural Resources—Division of Water Resources (DWR)will be promptly notified if any new seeps are identified or any significant changes are observed ' for the existing seeps. If any existing or newly identified seeps are determined to reach Lake Wylie, and demonstrate reasonable potential to exceed a water quality standard, Duke Energy will do one of the following: 1)stop the seep, 2)capture and route the seep so that it is discharged through a National ' Pollutant Discharge Elimination System (NPDES) permitted outfall, or 3)address the seep using Best Management Plans approved by DWR. ' Most of the analytical results upstream and downstream of the ash basin discharge in Lake Wylie with the exception of copper and zinc are at, or near, the method detection limits and below limits for water quality standards. Measured values at these two locations are consistent with historical data from previous ' monitoring efforts in Lake Wylie. Duke Energy proposes that the semi-annual in-stream monitoring frequency be maintained. 1 1 ' 2 NM MN NE MI NM EN MN r N NM INI1 MO MI M 1111 11111 Table 1 —Allen Steam Station Surface Water/Seep Locations and Descriptions Seep Location Coordinates' Flow ID Description2 Seep Description Latitude Longitude S-1 35°10.242' 81°0.625' Continuous Located south of Active Ash Basin, north of Nutall Oak Lane.Tributary towards Lake Wylie.Well-defined stream approximately 3-ft wide. S-2 35°10.426' 81°0.344' Continuous Located southeast of Active Ash Basin.Tributary towards Lake Wylie.Well-defined stream approximately 1-ft wide. S-3 35°10.513' 81°0.360' Continuous Located east of Active Ash Basin. Tributary towards Lake Wylie.Well-defined stream approximately 2-ft wide. S-4 35°10.513' 81°0.360' Continuous Located east of Active Ash Basin. Tributary towards Lake Wylie.Well-defined stream approximately 1.5-ft wide. S-5 35°10.621' 81°0.366' Continuous Located east of Active Ash Basin. Unconfined diffuse flow towards Lake Wylie. S-6 35°10.626' 81°0.369' Continuous Located east of Active Ash Basin. Unconfined diffuse flow towards Lake Wylie. S-7 35°10.664' 81°0.380' Continuous Located east of Active Ash Basin. Unconfined diffuse flow towards Lake Wylie. S-8 35°10.706' 81°0.391' Continuous Located east of Active Ash Basin. Flow through is concentrated through a 12-inch CMP. S-9 35°11.146' 81°0.394' Continuous Located east of Active Ash Basin. Flow through is concentrated through a 12-inch CMP. Notes: 1. Location coordinates(degrees)for seep sampling locations are approximate, and are in NAD 83 datum. 2. Flow description for each seep sample location is based on observation during site visits performed by HDR Engineering, Inc. (HDR)on August 21, 2014. Flow measurements and analytical samples were collected on September 4 and September 9, 2014. 3 I I Table 2—Laboratory Analytical Methods Parameter Method Reporting Units Laboratory Limit i Chemical Oxygen HACH 8000 20 mg/L Duke Energy Demand (COD) Chloride(CI) EPA 300.0 1 mg/L Duke Energy IFluoride(FI) EPA 300.0 1 mg/L Duke Energy Sulfate(SO4) EPA 300.0 1 mg/L Duke Energy I Oil and Grease EPA 1664B 5 ug/L Pace Analytical Mercury(Hg) EPA 245.1 0.05 ug/L Duke Energy I Aluminum (Al) EPA 200.7 0.005 mg/L Duke Energy Barium (Ba) EPA 200.7 0.005 mg/L Duke Energy Boron (B) EPA 200.7 0.05 mg/L Duke Energy ICalcium (Ca) EPA 200.7 0.01 mg/L Duke Energy Hardness EPA 200.7 0.19 mg/L(CaCO3) Duke Energy IIron (Fe) EPA 200.7 0.01 mg/L Duke Energy Magnesium (Mg) EPA 200.7 0.005 mg/L Duke Energy IManganese(Mn) EPA 200.7 0.005 mg/L Duke Energy Zinc(Zn) EPA 200.7 0.005 mg/L Duke Energy I Antimony(Sb) EPA 200.8 1 ug/L Duke Energy Arsenic(As) EPA 200.8 1 ug/L Duke Energy Cadmium (Cd) EPA 200.8 1 ug/L Duke Energy IChromium(Cr) EPA 200.8 1 ug/L Duke Energy Copper(Cu) EPA 200.8 1 mg/L Duke Energy ILead (Pb) EPA 200.8 1 ug/L Duke Energy Molybdenum (Mo) EPA 200.8 1 ug/L Duke Energy INickel (Ni) EPA 200.8 1 ug/L Duke Energy Selenium(Se) EPA 200.8 1 ug/L Duke Energy IThallium (TI) Low Level EPA 200.8 0.2 ug/L Duke Energy TDS SM2540C 25 mg/L Duke Energy I TSS SM2540D 5 mg/L Duke Energy I RECEIVED/DENR/DWR OCT152014 I Water Qua on Permitting S I 4 I I I I I I I Appendix A ISeep Flows and Analytical Results I I 1 I I I 1 I I I Appendix A-1 1 I I Allen Steam Station Surface Water/Seep Monitoring Analytical Results-September 2014 Seep Monitoring Location Lake Wylie- Lake Wylie- , Parameter Units S-1 S-2 S-3 5-4 S-5 S-6 S-7 S-8 S-9 Upstream2'3 Downstream2'3 Oil &Grease mg/I <5 <5 <5.0 <5 <5 <5.0 <5 <5 <5 N/A N/A I COD-Chemical Oxygen Demand mg/I <20 <20 20 <20 <20 <20 <20 <20 <20 N/A N/A CI -Chloride(00940) mg/I 4.3 49 32 41 59 62 7.8 7.5 9.1 N/A N/A Fl-Fluoride mg/I 0.11 0.1 0.13 <0.1 <0.1 0.11 <0.1 0.17 <0.5 N/A N/A I SO4-Sulfate(00945) mg/I 1.4 10 26 21 42 55 74 87 180 N/A N/A Hg -Mercury(71900) Mil <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 Al -Aluminum(01105) mg/I 0.996 0.467 0.039 0.022 <0.005 0.21 0.083 0.01 0.254 N/A N/A IBa-Barium (01007) mg/I 0.044 0.114 0.044 0.047 0.208 0.307 0.057 0.060 0.029 N/A N/A B- Boron (01022) mg/I <0.05 0.871 0.555 0.713 0.927 1.01 0.934 0.606 1.49 N/A N/A I Ca-Calcium mg/I 7.34 7.25 61.7 73.4 20.7 19.8 17.8 97.6 138 N/A N/A Hardness mg/I (CaCO3) 31.9 74.4 203 251 111 112 76 292 413 N/A N/A Fe-Iron (01045) mg/I 1.86 1.25 0.136 0.215 <0.01 0.015 0.113 0.011 0.942 N/A N/A I Mg -Magnesium mg/I 3.29 13.7 12 16.4 14.4 15.2 7.69 11.7 16.5 N/A N/A Mn -Manganese(01055) mg/I 0.356 0.305 0.131 0.310 1.45 2.25 0.395 <0.005 0.998 N/A N/A Zn -Zinc(01092) mg/I <0.005 <0.005 <0.005 <0.005 0.011 <0.005 <0.005 <0.005 0.283 3.08 <2 ISb-Antimony(01097) Mil <1 <1 <1 <1 <1 <1 <1 <1 <1 N/A N/A As -Arsenic(01002) Nil <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 Cd -Cadmium(01027) Mil <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 ICr-Chromium (01034) Mil 1.42 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 Cu -Copper(01042) Nil <1 <1 <1 <1 <1 1.14 <1 <1 1.31 2.80 2.60 I Pb- Lead (01051) Ng/l <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 Mo-Molybdenum pg/I <1 <1 <1 <1 <1 <1 <1 <1 <1 N/A N/A • Ni -Nickel (01067) pg/I <1 _ 1.58 <1 <1 8.23 2.29 <1 <1 _ 2.78 N/A N/A I Se-Selenium (01147) Mil <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 TI -Thallium (01059) pg/I <0.2 <0.2 <0.2 <0.2 <0.2 0.273 <0.2 <0.2 <0.2 N/A N/A TDS -Total Dissolved Solids(70300) mg/I110 170 300 320 230 220 180 360 500 54 53 I TSS-Total Suspended Solids mg/I _ 38 8 <5 <5 <5 <5 <5 <5 <5 N/A N/A pH s.u. 6.63 6.33 6.95 6.92 5.56 4.67 5.64 8.11 7.52 N/A N/A I Temperature °C 23.8 _ 20.9 21.5 21.6 17.6 17.6 20.4 23.6 19 N/A _ N/A Specific conductance pS/cm 107 229 447 524 326 341 222 555 717 N/A N/A Flow MGD 0.0004 0.0025 0.0083 0.0008 0.0023 0.0002 0.0002 0.0002 0.0002 N/A N/A _ I Notes: 1 Flow measurements and analytical samples were collected on September 4 and 9, 2014. 2. N/A indicates not applicable. 3. Lake Wylie samples were collected on August 27, 2014. I I Appendix A-2 I I I I I I I Appendix B ISample Preservation and Hold Times I I I I I I I I I I 111Appendix B-1 IMaximumParameter Name Container' Preservation2'3 4 Holding Time4 Table IB—Inorganic Tests 1. Acidity P, FP, G Cool, 56 °C18 14 days 2. Alkalinity P, FP, G Cool, 56 °C18 14 days 4. Ammonia P, FP, G Cool, 56°C18, H2SO4 to pH <2 28 days 1 9. Biochemical oxygen demand P, FP, G Cool, 56°C18 48 hours 10. Boron P, FP, or HNO3 to pH <2 6 months I Quartz 11. Bromide P, FP, G None required 28 days I 14. Biochemical oxygen demand, P, FP G Cool, 56°C18 48 hours carbonaceous 15. Chemical oxygen demand P, FP, G Cool, s6°C18, H2SO4 to pH<2 28 days I 16. Chloride P, FP, G None required 28 days 17. Chlorine,total residual P, G None required Analyze within 15 I minutes 21. Color P, FP, G Cool, s6°C18 48 hours I 23-24. Cyanide,total or available P, FP, G Cool, 56°C18, NaOH to pH 14 days (or CATC)and free >108,8 reducing agent if oxidizer present I 25. Fluoride P None required 28 days 27. Hardness P, FP, G HNO3 or H2SO4to pH<2 6 months I 28. Hydrogen ion (pH) P, FP, G None required Analyze within 15 minutes 31,43. Kjeldahl and organic N P, FP, G Cool, 56°C18, H2SO4 to pH <2 28 days Table IB—Metals 18. Chromium VI P, FP, G Cool, 56°C18, pH =9.3-9.720 28 days I35. Mercury(CVAA) P, FP, G HNO3 to pH <2 28 days 35. Mercury(CVAFS) FP, G; and FP- 5 mUL 12N HCI or 5 mUL 90 daysl7 I lined capl7 BrCI17 3, 5-8, 12, 13, 19, 20,22, 26,29, 30, P, FP, G HNO3 to pH<2, or at least 24 6 months 32-34, 36, 37, 45,47, 51, 52, 58-60, hours prior to analysis19 I 62, 63, 70-72, 74, 75. Metals, except boron, chromium VI, and mercury I38. Nitrate P, FP, G Cool, 56°C78 48 hours 39. Nitrate-nitrite P, FP, G Cool, s6 °C18, H2SO4 to pH <2 28 days I40. Nitrite P, FP, G Cool, 56°C18 48 hours 41. Oil and grease G Cool to 56°C18, HCI or H2SO4 to 28 days pH <2 111 Appendix B-2 IParameter Name 1 • 2,3 Maximum Container Preservation Holding Time4 I42. Organic Carbon P, FP, G Cool to 56 °C18, HCI, H2SO4, or 28 days H3PO4 to pH <2 44. Orthophosphate P, FP, G Cool, to 56 0 C18.24 Filter within 15 1 minutes; analyze within 48 hours 46. Oxygen, Dissolved Probe G, Bottle and None required Analyze within 15 I top minutes 47.Winkler G, Bottle and Fix on site and store in dark 8 hours 1 top 48. Phenols G Cool, 56°C18, H2SO4 to pH <2 28 days 49. Phosphorous(elemental) G Cool, 56°C78 48 hours 1 50. Phosphorous,total P, FP, G Cool, 56°C18, H2SO4 to pH <2 28 days 53. Residue,total P, FP, G Cool, 56°C18 7 days I54. Residue, Filterable P, FP, G Cool, 56°C18 7 days I 55. Residue, Nonfilterable(TSS) P, FP, G Cool, s6°C18 7 days 56. Residue, Settleable P, FP, G Cool, 56°C18 48 hours I 57. Residue, Volatile P, FP, G Cool, s6 °C18 7 days 61. Silica P or Quartz Cool, 56°C18 28 days I64. Specific conductance P, FP, G Cool, 56 °C18 28 days 65. Sulfate P, FP, G Cool, 56 °C18 28 days I 66. Sulfide P, FP, G Cool, 56°C18 add zinc acetate 7 days plus sodium hydroxide to pH >9 67. Sulfite P, FP, G None required Analyze within 15 Iminutes 68. Surfactants P, FP, G Cool, 56°C18 48 hours I 69.Temperature P, FP, G None required Analyze 73.Turbidity P, FP, G Cool, 56 °C18 48 hours Notes: III1. "P"is for polyethylene; "FP" is fluoropolymer(polytetrafluoroethylene(PTFE);Teflon®), or other fluoropolymer, unless stated otherwise in this table; and"G" is glass. 2. Except where noted in this table and the method for the parameter, preserve each grab sample within 15 I minutes of collection. For a composite sample collected with an automated sample(e.g., using a 24-hour composite sample; see 40 CFR 122.21(g)(7)(i)or 40 CFR Part 403,Appendix E), refrigerate the sample at 56°C during collection unless specified otherwise in this table or in the method(s). For a composite sample I to be split into separate aliquots for preservation and/or analysis, maintain the sample at 56 °C, unless specified otherwise in this table or in the method(s), until collection, splitting, and preservation is completed. Add the preservative to the sample container prior to sample collection when the preservative will not compromise the integrity of a grab sample, a composite sample, or aliquot split from a composite sample I within 15 minutes of collection. If a composite measurement is required but a composite sample would compromise sample integrity, individual grab samples must be collected at prescribed time intervals(e.g., 4 samples over the course of a day, at 6-hour intervals). Grab samples must be analyzed separately and the I concentrations averaged. Alternatively, grab samples may be collected in the field and composited in the laboratory if the compositing procedure produces results equivalent to results produced by arithmetic averaging of results of analysis of individual grab samples. For examples of laboratory corn positing Appendix B-3 ' procedures, see EPA Method 1664 Rev. A(oil and grease)and the procedures at 40 CFR 141.34(f)(14)(iv) and (v)(volatile organics). ' 3. When any sample is to be shipped by common carrier or sent via the U.S. Postal Service, it must comply with the Department of Transportation Hazardous Materials Regulations(49 CFR part 172).The person offering such material for transportation is responsible for ensuring such compliance. For the preservation requirement of this table, the Office of Hazardous Materials, Materials Transportation Bureau, Department of ' Transportation has determined that the Hazardous Materials Regulations do not apply to the following materials: Hydrochloric acid (HCI) in water solutions at concentrations of 0.04% by weight or less (pH about 1.96 or greater; Nitric acid (HNO3)in water solutions at concentrations of 0.15% by weight or less(pH about ' 1.62 or greater); Sulfuric acid (H2SO4) in water solutions at concentrations of 0.35% by weight or less(pH about 1.15 or greater); and Sodium hydroxide(NaOH) in water solutions at concentrations of 0.080% by weight or less (pH about 12.30 or less). 4. Samples should be analyzed as soon as possible after collection. The times listed are the maximum times ' that samples may be held before the start of analysis and still be considered valid. Samples may be held for longer periods only if the permittee or monitoring laboratory has data on file to show that, for the specific types of samples under study, the analytes are stable for the longer time, and has received a variance from the Regional Administrator under Sec. 136.3(e). For a grab sample, the holding time begins at the time of collection. For a composite sample collected with an automated sampler(e.g., using a 24-hour composite sampler; see 40 CFR 122.21(g)(7)(i)or 40 CFR part 403, Appendix E), the holding time begins at the time of the end of collection of the composite sample. For a set of grab samples composited in the field or laboratory, the holding time begins at the time of collection of the last grab sample in the set. Some samples may not be stable for the maximum time period given in the table. A permittee or monitoring laboratory is obligated to hold the sample for a shorter time if it knows that a shorter time is necessary to maintain sample ' stability. See 136.3(e)for details. The date and time of collection of an individual grab sample is the date and time at which the sample is collected. For a set of grab samples to be composited, and that are all collected on the same calendar date, the date of collection is the date on which the samples are collected. For a set of grab samples to be composited, and that are collected across two calendar dates, the date of ' collection is the dates of the two days; e.g., November 14-15. For a composite sample collected automatically on a given date, the date of collection is the date on which the sample is collected. For a composite sample collected automatically, and that is collected across two calendar dates, the date of ' collection is the dates of the two days; e.g., November 14-15. For static-renewal toxicity tests, each grab or composite sample may also be used to prepare test solutions for renewal at 24 h, 48 h, and/or 72 h after first use, if stored at 0-6°C, with minimum head space. 5. ASTM D7365-09a specifies treatment options for samples containing oxidants(e.g., chlorine). Also, Section 9060A of Standard Methods for the Examination of Water and Wastewater(20th and 21st editions) addresses dechlorination procedures. 6. Sampling, preservation and mitigating interferences in water samples for analysis of cyanide are described ' in ASTM D7365-09a. There may be interferences that are not mitigated by the analytical test methods or D7365-09a.Any technique for removal or suppression of interference may be employed, provided the laboratory demonstrates that it more accurately measures cyanide through quality control measures ' described in the analytical test method.Any removal or suppression technique not described in D7365-09a or the analytical test method must be documented along with supporting data. 7. For dissolved metals, filter grab samples within 15 minutes of collection and before adding preservatives. For a composite sample collected with an automated sampler(e.g., using a 24-hour composite sampler; see ' 40 CFR 122.21(g)(7)(i)or 40 CFR Part 403, Appendix E), filter the sample within 15 minutes after completion of collection and before adding preservatives. If it is known or suspected that dissolved sample integrity will be compromised during collection of a composite sample collected automatically over time (e.g., by interchange of a metal between dissolved and suspended forms), collect and filter grab samples to be composited (footnote 2) in place of a composite sample collected automatically. 8. Guidance applies to samples to be analyzed by GC, LC, or GC/MS for specific compounds. ' 9. If the sample is not adjusted to pH 2, then the sample must be analyzed within seven days of sampling. 10. The pH adjustment is not required if acrolein will not be measured. Samples for acrolein receiving no pH adjustment must be analyzed within 3 days of sampling. 11. When the extractable analytes of concern fall within a single chemical category, the specified preservative ' and maximum holding times should be observed for optimum safeguard of sample integrity(i.e., use all necessary preservatives and hold for the shortest time listed).When the analytes of concern fall within two or more chemical categories, the sample may be preserved by cooling to 56 °C, reducing residual chlorine with 0.008% sodium thiosulfate, storing in the dark, and adjusting the pH to 6-9; samples preserved in this manner may be held for seven days before extraction and for forty days after extraction. Exceptions to this optional preservation and holding time procedure are noted in footnote 5(regarding the requirement for Appendix B-4 ' thiosulfate reduction), and footnotes 12, 13(regarding the analysis of benzidine). 12. If 1,2-diphenylhydrazine is likely to be present, adjust the pH of the sample to 4.0 ±0.2 to prevent ' rearrangement to benzidine. 13. Extracts may be stored up to 30 days at<0 °C. 14. For the analysis of diphenylnitrosamine, add 0.008% Na2S2O3 and adjust pH to 7-10 with NaOH within 24 ' hours of sampling. 15. The pH adjustment may be performed upon receipt at the laboratory and may be omitted if the samples are extracted within 72 hours of collection. For the analysis of aldrin, add 0.008% Na2S2O3. 16. Place sufficient ice with the samples in the shipping container to ensure that ice is still present when the ' samples arrive at the laboratory. However, even if ice is present when the samples arrive, immediately measure the temperature of the samples and confirm that the preservation temperature maximum has not been exceeded. In the isolated cases where it can be documented that this holding temperature cannot be ' met, the permittee can be given the option of on-site testing or can request a variance.The request for a variance should include supportive data which show that the toxicity of the effluent samples is not reduced because of the increased holding temperature. Aqueous samples must not be frozen. Hand-delivered samples used on the day of collection do not need to be cooled to 0 to 6 °C prior to test initiation. 17. Samples collected for the determination of trace level mercury(<100 ng/L)using EPA Method 1631 must be collected in tightly-capped fluoropolymer or glass bottles and preserved with BrCI or HCI solution within 48 hours of sample collection. The time to preservation may be extended to 28 days if a sample is oxidized in ' the sample bottle. A sample collected for dissolved trace level mercury should be filtered in the laboratory within 24 hours of the time of collection. However, if circumstances preclude overnight shipment, the sample should be filtered in a designated clean area in the field in accordance with procedures given in Method ' 1669. If sample integrity will not be maintained by shipment to and filtration in the laboratory, the sample must be filtered in a designated clean area in the field within the time period necessary to maintain sample integrity. A sample that has been collected for determination of total or dissolved trace level mercury must be analyzed within 90 days of sample collection. ' 18. Aqueous samples must be preserved at 56°C, and should not be frozen unless data demonstrating that sample freezing does not adversely impact sample integrity is maintained on file and accepted as valid by the regulatory authority. Also,for purposes of NPDES monitoring, the specification of"5°C" is used in place ' of the"4 °C"and "<4 °C" sample temperature requirements listed in some methods. It is not necessary to measure the sample temperature to three significant figures(11100th of 1 degree); rather, three significant figures are specified so that rounding down to 6°C may not be used to meet the 56 °C requirement. The preservation temperature does not apply to samples that are analyzed immediately(less than 15 minutes). ' 19. An aqueous sample may be collected and shipped without acid preservation. However, acid must be added at least 24 hours before analysis to dissolve any metals that adsorb to the container walls. If the sample must be analyzed within 24 hours of collection, add the acid immediately(see footnote 2). Soil and sediment ' samples do not need to be preserved with acid.The allowances in this footnote supersede the preservation and holding time requirements in the approved metals methods. 20. To achieve the 28-day holding time, use the ammonium sulfate buffer solution specified in EPA Method 218.6. The allowance in this footnote supersedes preservation and holding time requirements in the approved hexavalent chromium methods, unless this supersession would compromise the measurement, in which case requirements in the method must be followed. 21. Holding time is calculated from time of sample collection to elution for samples shipped to the laboratory in ' bulk and calculated from the time of sample filtration to elution for samples filtered in the field. 22. Sample analysis should begin as soon as possible after receipt; sample incubation must be started no later than 8 hours from time of collection. 23. For fecal coliform samples for sewage sludge(biosolids)only, the holding time is extended to 24 hours for the following sample types using either EPA Method 1680(LTB-EC)or 1681 (A-1): Class A composted, Class B aerobically digested, and Class B anaerobically digested. 24. The immediate filtration requirement in orthophosphate measurement is to assess the dissolved or bio- available form of orthophosphorus(i.e.,that which passes through a 0.45-micron filter), hence the requirement to filter the sample immediately upon collection (i.e., within 15 minutes of collection). [38 FR 28758, Oct. 16, 1973]. I I Appendix B-5 _.SG .�+�'�.:irS3C/i i/�/'' . �1�.`l t :gam ✓i!i � .�.. . s�af rr r DUKE ENERGY PROPERTY ) -\ti r1\���___r��,G����• r 'SF P AD I No- • - I ! + • ASH BA� �1•-7� ASH lei' /�� �Y� iJl/,r t�-•>> \ r` J .:..113. . `Cf'i♦') - it i.! e�l pR�StRONGR�� I /� µjGHIPN� A 1Y r ALLEN STEXm NPDes ooa STATICHY lit RETIRED ASH ASIN ASH LANDFILL PERMIT NO. 3612 moomb—[pNDiILL EDGE OF WASh AB-95 AB-9D NORTH DIKE LAKE WYLIE .� (CATAWBA RIVER) S-s ui < tr ,\ C AB-4D w \ ..... =�ii seS-7 ACTIVE ASH BASIN ` v~i S-6 py J"v='�� t;�•�/ k; s''! I Ilrrrr(ra r�\ter- y S-5 � ,/lid,-..> �,11�d� � 1>'(� I 1 � i� /j Ijly I d ';,� 0• . ;r � - i ii/ % C-=-1/11' �I f 1 I 1 { 4 , �!� �l U i� x t7ir' •-y�.n� • tt %ry�l y ! / / W I.., �� r a_ 'al {~ r r _ 'CAB 105 Gq�4 /! �r �" /r•- 1 t �. — r �/ 2 AB-10D \♦ �� �,. \ND068 rrb� I /I� ir' I DISCHARGE TOWER /Ir ',>, '-'``t y +?:: NPDES002 /�g♦�♦ _ _��? ♦� 1m. �I t\ �l�ll\\` b �♦\\\� j 9 ,_may_ \\ \ //��i� 1 -ice _�♦ \ \�Irf \ (.y .lsl,i /..71A/;� \�-__..yp,_ jl I i��\\\\\\ t G"�-���\� \`�,�\I11\\j�,iiy'� \ \f�! / I �` -!, ! 1�/ i \�\ t• � `�_.-- r// /•'��� \ Iill^_/ � d -z=cam t.lrl\1VF1/. '� ' �Qe,.1j+•)�rJr( ! . i ` ` + I♦ �1�:.1\\ 11 .`�/jam/! ("` Vljiii�lf AB-11D y��G �. r 1 �� i el Z R % �`�f♦``\♦xx♦\\ r. , N \N ' / ,ter^_. �'.� .k7�r... ♦� � ii\ \ I, //,y�!/,t�.�!� �ii�n� i,�i � .' 1- ![ OF" _ �. (ti -17 ``tk tilt\\\ 1►��' i ] 1 ! 1 •1 l��j�l *j (�,�- iyr � �A-139 aP, AB-4 3 1 1