HomeMy WebLinkAboutNCC223431_ESC Approval Submitted_20221004ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
� 1,a 57'A7IV �
r� awn �y
NORTH CAROLINA
Environmental Quality
July 8, 2022
LETTER OF APPROVAL
Piedmont Triad Airport Authority
Attention: J. Alex Rosser, Chief Operating Officer
1000A Ted Johnson Parkway
Greensboro, NC 27409
RE: Project Name: Crossfield Taxiway - Package 2 Grading
Acres Approved: 2S8
Project ID: GUILF-2023-001
County: Guilford
City: Greensboro
Address: 1000A Ted Johnson Parkway
River Basin: Cape Fear
Stream Classification: WS-III ; NSW - Jordan Lake Watershed
Submitted By: Jacobs
Date Received by LQS: July 1, 2022
Plan Type: New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3)
years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 1SA NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed atdeq.nc.gov/NCGO1. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
•��/� Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27103
naai�3 cnmi��" n
336.776.9800
Letter of Approval
Piedmont Triad Airport Authority
July 8, 2022
Page 2 of 2
Title 1SA NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-S1 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Zachary Digitallysigned by
Zachary Lentz
Date:2022.07.08
Lentz
09:14:57-04'00'
Zachary Lentz, PE
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
cc: Matt Wright, PE of Jacobs (via email)
WSRO file