HomeMy WebLinkAboutNCC215545_Annual Fee Paid Email_20221003Holloman, Tevye L
From: laserfiche@ncdenr.gov
Sent: Monday, October 3, 2022 11:09 AM
To: Eric.Kinstler@duke-energy.com
Cc: Holloman, Tevye L; Georgoulias, Bethany; Tran, Kieu M; Eric.Kinster@duke-energy.com
Subject: Construction SW General Permit Annual Fee Received - NCC215545
Dear Construction General Permit Permittee:
Certificate of Coverage (COC) no. NCC215545 has been successfully renewed by payment of the 2022 annual fee, as long
as all other annual fees have been paid. If no fees are owed, this project remains actively covered under North Carolina's
NPDES General Stormwater Permit for Construction Activities.
(Note, if this COC was recently terminated, the payment was successfully applied to invoice period.)
This COC is for Unit 5 Inactive Ash Basin -Closure Excavation Ph. 2 (Express Review) in Cleveland County, issued to Duke
Energy Carolinas LLC. The payment was applied to Invoice no. NCC215545-2022.
If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.