Loading...
HomeMy WebLinkAbout20211641 Ver 2_Eng_Form_4345_2012OCT signed_20220930U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL 003 EXPIRES: 28 FEBRURUARY RY 20 2013 33 CFR 325. The proponent agency is CECW-CO-R. Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BYAPPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Jeffrey Middle -Brian Last - McClanahan First - Brandon Middle -James Last - Phillips Company - Charlotte Water Company - Habitat Assessment and Restoration Professionals E-mail Address-mac.mcclanahan@charlottenc.gov E-mail Address-brandon@habitatassessment.com 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 5100 Brookshire Blvd Address- 301 McCullough Dr. Suite 400 City - Charlotte State - NC Zip - 28216 Country -USA City - Charlotte State - NC Zip - 28262 Country -USA 7. APPLICANT'S PHONE NOs. w/AREA CODE 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax 704 995-7489 704 928-6828 704 841-2447 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, Brandon Phillips - HARP to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. N Z 9/30/2022 SI ATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Derita Branch Tributary Sanitary Sewer Improvements Phase 2 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) Derita Branch Address NA Linear Sewer project along Derita Branch 15. LOCATION OF PROJECT Latitude: -N 35.25033 Longitude: -W-80.809823 City - Charlotte State- NC Zip- 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID NA Municipality Section - Township - Range - ENG FORM 4345, OCT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE The southern terminus of the Derita Branch Tributary Sanitary Sewer alignment is located near the intersection of N Tryon Street (US 29/ NC 49) and Atando Avenue. From Charlotte, take N Tryon Street north to the intersection with Atando Avenue. The northern terminus of the sewer alignment is located near the intersection of N Graham Street and W Sugar Creek Road. From Charlotte, take N Graham Street north to the intersection with W Sugar Creek Road. The sewer alignment follows the Derita Branch stream corridor. 18. Nature of Activity (Description of project, include all features) The proposed Phase 2 Derita Branch Tributary Sanitary Sewer Improvements Project corridor alignment starts from the existing sanitary sewer Phase 1 improvements area located near the intersection of N Tryon Street and Atando Avenue. The sewer improvements alignment extends north along Derita Branch and crosses multiple wetland areas and tributaries of Derita Branch, much of which is previously impacted and maintained wetland areas within the existing sewer easement. Areas of new sewer easement are required to move the sewer away from the meanders of Derita Branch that are now encroaching into portions of the existing sewer easement. The main line will be upsized from 8", 12" and 15" lines to 18", 24" and 30" lines. The new lines will be made of DIP and C-900 DR25 PVC pipes. The line will be installed by open -cut and by boring. The line is approximately 18,000 feet long, has 5- and 6-foot manholes, and will have a six -foot - wide trench. The line will be dug in place and aerial sewers will be buried to lower the risk of failing. Please see ENG FORM 4345 SUPPLEMENTAL INFORMATION for additional information. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The Derita Branch Tributary Sanitary Sewer Improvements Project Phase 2 will serve the demands of the growing area. The overall need is to replace aged and failing infrastructure since the existing sewer is under capacity. It also has high levels of infiltration and inflow. The existing sewer was built in the 1960's and 1970's and the manholes leak groundwater. The creek has meandered and is putting the sewer pipe at risk of being exposed and falling into the creek. Construction is projected to begin in early spring 2023, and the project will take approximately 18 months to complete. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Clayey soil and rock will be excavated, removed from the trench and hauled off -site. It is estimated that approximately 3,900 cubic yards of bedding stone will be used around the sewer pipe in the wetlands. This is in order to support and stabilize the pipe. The remaining portion of the ditch will be filled using native soil that was dug from the ditch. The top 12 inches of the wetland topsoil will be removed, stockpiled and replaced. In order to match the pre -construction contours, the excess soil displaced by the pipe and bedding stone will be hauled off. The original contours will be restored. Erosion control devices will be used per state requirements. We do not anticipate any basins to be constructed. Please see ENG FORM 4345 SUPPLEMENTAL INFORMATION for additional information. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards bedding stone = 3,901 CY Pipe displacement volume = 1,007 CY See ENG FORM 4345 SUPPLEMENTAL I 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 3.18 or Linear Feet 23. Description of Avoidance, Minimization, and Compensation (see instructions) The existing sewer crosses Derita Creek and unnamed tributaries many times. The new alignment will cross the stream fewer times and will reduce operational impacts to the stream. Existing aerial lines will be buried below the creek bottom. The alignment was selected to avoid streams and ponds as much as possible and to follow the general drainage basin of the existing sewer. Mitigation will be provided through the purchase of credits from the Charlotte -Mecklenburg Storm Water Services Umbrella Stream and Wetland Mitigation Bank. ENG FORM 4345, OCT 2012 Page 2 of 3 24. Is Any Portion of the Work Already Complete? QYes F—]No IF YES, DESCRIBE THE COMPLETED WORK The Phase 1 portion of the project has been permitted (SAW-2021-02426). The Phase I Derita Branch Tributary Sanitary Sewer Improvements Project corridor alignment starts from the existing sanitary sewer located in a grassed area next to Little Sugar Creek and north of Cullman Avenue, within a contaminated industrial site. The corridor extends to the east, parallel to Little Sugar Creek and crosses perpendicular under Little Sugar Creek and into a forested upland. A branch line of the sewer crosses Derita Branch to tie to the existing sewer. The sewer corridor then extends between Derita Branch and existing development to North Tryon Street. The Phase 2 portion of the project extends north from the Phase 1 portion of the project. 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- Please see ENG FORM 4345 SUPPLEMENTAL INFORMATION City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL' IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER USACE NWP 43 SAW-2021-02426 2021-11-09 2021-11-10 NCDWR WQC 20211641 2021-11-09 2021-12-13 Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. LCc�L 9/30/2022 L-LSIGWURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3