Loading...
HomeMy WebLinkAboutSWA000163_Email_20221003DeBerry, Margie From: Farkas, Jim J Sent: Monday, October 3, 2022 12:04 PM To: bwalden@madisoncagroup.com Cc: kcaldwell@geosciencegroup.com; sgregory@geosciencegroup.com; Khan, Zahid; McKenzie, Brady S; DeBerry, Margie; Orion Holtey, PE Subject: RE: SWA000163 Madison Park It was brought to our attention that there was a typo in the issued cover letter and permit regarding the expiration date of the permit. The correct expiration date for the permit should be September 20, 2027 (five years after issuance of the permit per 15A NCAC 02H .1043(5)). Please disregard the cover letter and permit sent out on 9/20/2022. We have revised the cover letter and permit accordingly, attached the revised documents, updated our permitting database, and apologize for the inconvenience. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov ki; DE NORTH CAROLINA — Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas, Jim J Sent: Tuesday, September 20, 2022 4:06 PM To: bwalden@madisoncagroup.com Cc: kcaldwell@geosciencegroup.com; sgregory@geosciencegroup.com; Khan, Zahid <zahid.khan@ncdenr.gov>; McKenzie, Brady S <bmckenzie@ncdot.gov> Subject: RE: SWA000163 Madison Park Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Permit Authorization to Construct (ATC) Application for the subject project on September 2, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 - 1062 rules. We are forwarding ATC Permit No. SWA000163, dated September 20, 2022, for the construction of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Joe Teague, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Madison Waxhaw Owner, LLC Attn: Joe Teague, Registered Agent 6805 Morrison Boulevard Charlotte, NC 28211 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at iim.farkas@ncdenr.gov. Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site cannot be closed out until the as -built stormwater plans for this project are approved by our office. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov D_ E kj/� NORTH CAROLINA 7.4m Q Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tran, Kieu M <kieu.tran@ncdenr.gov> Sent: Wednesday, August 24, 2022 11:19 AM To: bwalden@madisoncagroup.com; kcaldwell@geosciencegroup.com Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Khan, Zahid <zahid.khan@ncdenr.gov> Subject: SWA000163 Madison Park Good Morning, We received your post -construction stormwater permit Authorization to Construct (ATC) application for the above mentioned project on 8/17/2022. Reviews under the fast track permitting process generally take 30 calendar days. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post -Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SWA000163 If you have any questions, please contact Jim Farkas Jim. Farkas@ncdenr.gov 919-707-3646. Thank you, Mrs. Kieu Tran Stormwater Program Administrative Assistant Office: (919) 707- 3640 Kieu. Tran @ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Stormwater Program 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater i/ E Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties