Loading...
HomeMy WebLinkAbout20140934 Ver 1_Certification of Completion_20141020Certification of Completion DWR Project No.: 20 14 — O'1 iL4 County: ?a vyt Applicant: IN c ( - H c,,-f - 3-fo(1 S Project Name: �&)c (-_ Date of Issuance of Wetland Permit: ress (Lo m - 66k34--or, Certificate of Completion • • 1 Upon completion of all work approved within the 401 Water Quality Certification, and any subsequent modifications, the applicant. is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center; Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1,�c,f/►Giet�v,�wg hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification, the approved plans and specifications, and other supporting materials. Signature: w 4w."—. Date: S / /^- Agent's Certification 1, a 6tx-q , hereby state that, to the best of my abilities, due care and diligence was used in the o ervation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification, the approved plans and specifications, and other supporting material Signature: Date: 1 d, 16// Ll If this project was designed by a Certified Professional 1> �,/ I ? � (-6)V,- as a duly registered Professional -nS, a (i.e., En ineer, Landscap re cA hitect, Surveyor, etc.) in the State of North Carolina, having been authorized to obsery (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abih i , and diligence was used in the observation of the construction such that the construction was observed to be built within substantial complianc and intent of the 401 Water Quality Certification, the approved plans and specifications, and other supporting in JAls. Signature: Registration No. Date U 1 b 11 09 r�c a ICif, r� 20 ZU14 I BOILER ENGINEERING NC, PLLC Professional Engineering Services 800 West Hill Street, Charlotte, NC 28208 Telephone: (980)272 -3400 Fax: (980)272 -3401 LETTER OF TRANSMITTAL VIA: FedEX TO: NC DWR RE: Wal -Mart Oriental, NC Buffer and Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1650 ATTN: Anthony Scarbraugh DATE: October 17, 2014 JOB NO: NCC138117 WE ARE SENDING YOU ❑ Shop drawings ❑ Copy of letter ®Attached ❑ Prints ❑ Change order COPIES JOB# DATE REVISION REVISION SHEET DESCRIPTION DATE NO. 1 NCC138117 10/17/14 N/A N/A N/A Certification of Completion These Are Transmitted: ❑ For approval ®For your use ❑As requested ❑ For review and comment ❑Approved as submitted ❑Approved as noted ❑ Returned for corrections REMARKS: Please see the attached "Certification of Completion' for the work completed under the 401 Water Quality Certification. If you have any questions or require additional information, please do not hesitate to contact Kyle Crowe at this office at (980) 272 -3400. COPY TO: SIGNED: Andrew Moriarty, P.E. File: H:\ 2012 \NCC138117 \Administrative \Transmittals BOHLER ENGINEERING NC, PLLC October 17, 2013 Via: FedEx NC DWR Buffer and Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1650 Attn: Mr. Anthony Scarbraugh Re: Wal -Mart Certification of Completion Highway 55 Oriental, NC Pamlico County BE #NCC138117 Dear Mr. Scarbraugh, 800 West Hill Street, Suite 101 Charlotte, NC 28208 PHONE 980.272.3400 FAX 980.272.3401 With regard to the above - referenced project, we are submitting the "Certification of Completion" based upon the completion of all work approved within the 401 Water Quality Certification. Attached for your use are: • One (1) original "Certification of Completion" Please confirm that you do not need any additional information for review. Should you have any questions or require additional information, please contact me at (980) 272 -3400. enc. cc: File KIC /tmd Sincerely, BOHLER ENGINEERING, INC. r1__V�_1/" 62��� Kyle J. Crowe, P.E. CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • ENVIRONMENTAL CONSULTANTS a LANDSCAPE ARCHITECTS www.BohterEngineering.com