Loading...
HomeMy WebLinkAbout20081473 Ver 4_Year 2 Monitoring Report_20141030• ° . °ARRINGTON BRIDGE °BANK PARCEL NE•USE RIPARIAN-. p BUFFER & N UTRI ENT OFFSET. M ITIGAT'ION SITE. WAYNE COUNTY, NORTH CAROLINA PHASE II ' 'MONITORI,NG YEAR 2 REPORT ` DWQ PROJECT NUMBER: 2008- 1473V.4 SEPTEMBER 12, 2014 ; VOCFT @ 3,o.2014 DENR- VVFti4 k`kESQURCES 401 & BUFFER PERMITTING M-CA.11 -M Raleigh /Durham °o 2905 Meridian Parkway.o Durham, NC 27713 a Charlotte o 11301. Carmel Commons Blvd o Suite 111 o Charlotte, NC 28226 McAdamsCo.com Designing Tomorrow's Infrastructure & Communities ° ; ARRINGTON BRIDGE BANK PARCEL NEUSE RIPARIAN BUFFER & NUTRIENT OFFSET MITIGATION SITE WAYNE COUNTY, NORTH CAROLINA PHASE II MONITORING YEAR 2 REPORT DWQ # 2008- 1473v.4 September 12, 2014 Table of Contents 1.0 Introduction ........... ............................... 1.1 Project Location and Description..... 1.2 Project Goals and Objectives........... 2.0 Vegetation Condition and Comparison 3.0 Methodology .......... ............................... 3.1 Vegetation Monitoring Plots............ 3.2 Photo Stations ... ............................... 4.0 References ............. ............................... Appendix A: Site Maps Figure 1: Site Location Map Figure 2: Monitoring Year 1 Exhibit ..................................................... ..............................2 ..................................................... ..............................2 ..................................................... ..............................2 ..................................................... ..............................2 ..................................................... ..............................3 ..................................................... ..............................4 Appendix B: Vegetation Assessment Data Table 1: Vegetation Plot Mitigation Success Summary Table 2: Stem Count Total and Planted Species by Vegetation Plot Table 3: Planted Species Comparison by Vegetation Plot Appendix C: Vegetation Monitoring Plot Photos Appendix D: Vegetation Monitoring Plot Data Sheets Appendix E: Photo Stations 1.0 Introduction 1.1 Project Location and Description Located off of Arrington Bridge Road, at its intersection with John Street in Goldsboro, North Carolina (Figure 1) is the Neuse buffer and nutrient offset restoration area previously referred to as the Wayne County Development Alliance Bank Parcel and currently known as the Arrington Bridge Bank Parcel (hereafter referred to as the Bank Site). The Bank Site is being developed in two (2) phases: Phase I and Phase II. According to the Wayne County Development Alliance Bank Parcel Development Package (EcoEngineering, April 2012), Phase II consists of Parcel Numbers 2598632250 and 2598543857. Since approval of the Bank Parcel Development Package (BPDP), Parcel Number 2598632250 has been subdivided into two parcels (Parcel Numbers 2598538731 and 2598622980). Parcel Number 2598538731 is located immediately adjacent to the east of John Street while Parcel Number 2598622980 is located immediately adjacent to the east of Parcel Number 2598538731. Phase II construction of the Bank Site easement consists of 13.973 acres on Parcel Number 2598538731 (Figure 2). Figure 2A (Appendix A) is provided to illustrate the constructed Phase II Conservation Easement (CE) compared to the approved Bank Site as described within the BPDP. Future construction within the Bank Site will be consistent with the previously approved BPDP. The Bank Site and the Bank Site Service Area is contained within 8 -digit USGS HUC 03020201. Stormwater runoff from the Bank Site drains into an unnamed tributary of the Neuse River (Stream Index #27- (56)). According to the Basinwide Information Management System (BIMS), the Neuse River is classified as Class C and NSW (Nutrient Sensitive Waters) in this location. The purpose of this Bank Site is to improve water quality within the Neuse River watershed by providing off -site mitigation for development (both existing and proposed) requiring Buffer Mitigation and Nutrient Offset Credits. The Bank Site will provide Neuse Riparian Buffer Mitigation Credits and Nutrient Offset Mitigation Credits for development impacts within the Neuse River Basin USGS HUC 03020201 (Figure 3). The Phase I1 CE of the Bank Site is 13.973 acres and contains a Neuse Riparian Buffer restoration area of 4.460 acres (194,267 sf) that will be used to generate 4.460 acres (194,267 sf) of Neuse Riparian Buffer Credits. The remaining 7.788 acres (339,245 sf) of riparian restoration area within the Phase II CE (i.e. areas outside of the Neuse Buffer) will provide Nutrient Offset Credits for nitrogen (currently based on 2,273.02 lbs of nitrogen /ac of riparian restoration). Therefore, Phase II of the Bank Site will provide 17,702.28 pounds of Nitrogen Nutrient Offset Credits. This Bank Site has been established under the terms and conditions of the EBX Neuse Riparian Buffer Umbrella Mitigation Bank (Bank) made and entered into by EBX Neuse I, LLC (EBX), acting as the Bank Sponsor, and the North Carolina Department of Environment and Natural Resources - Division of Water Quality (DWQ), and was entered into by the parties on November 10, 2008. The Division of Water Quality, now hereby referred to as Division of Water Resources (DWR). 1.2 Project Goals and Objectives The goals of this nutrient offset mitigation project are to: • Improve the overall water quality and aquatic habitat in and around the unnamed tributary of the Neuse River by reducing nutrient and sediment loads into the streams caused by agricultural influences, • Improve the richness and diversity of the plant species within the conservation easement, and • Provide perpetual protection for the unnamed tributary to the Neuse River and associated riparian and upland buffers. These goals will be met through the following objectives: • By establishing a native plant community to match the endemic plant species at the Bank Site, • By reducing the quantities of exotic invasive species at the Bank Parcel through chemical methods, • By establishing a conservation easement to provide long -term protection for the Bank Site, and • By donation of the conservation easement and all of its interests, in perpetuity, to an accredited or approved land trust or stewardship program. 2.0 Vegetation Condition and Comparison Current stem counts (i.e. stem is defined as single living tree species) were calculated using vegetation plot monitoring data. Success will be defined as the survival of a minimum density of 320 planted trees per acre after five (5) years. As of Monitoring Year 2, the Bank Parcel had four (4) plots encompassing 0.0988 acres, containing 32 planted stems, which yielded a density of 324 planted stems per acre. Monitoring Year 2 field activities were conducted on August 28, 2014. The planted vegetation survival threshold was met for Vegetation Plots 2 and 3. Vegetation Plots 1 and 4 contained 121 and 202 planted stems per acre, respectively, and thus did not meet the success criteria. Summary tables of the data collected are provided in Appendix B. During Monitoring Year 2 field investigations, it was determined that Vegetation Plots 1 and 4 did not meet the vegetation survival threshold of 320 trees per acre. Therefore, replanting within the areas of Vegetation Plots 1 and 4 will occur sometime between the months of November 2014 and April 2015. 3.0 Methodology 3.1 Vegetation Monitoring Plots Baseline vegetation monitoring was conducted in accordance to CVS -EEP Protocol for Recording Vegetation (CVS -EEP, v4.2). All monitoring methodologies follow the most current templates and guidelines provided by EEP (EEP, 2010; EEP, 2011). All four (4) vegetation plots 2 installed by McAdams were located in Monitoring Year 2. Table 1 (Appendix B) provides a success summary for each vegetation monitoring plot. Based on the vegetation monitoring, two (2) of the four (4) vegetation monitoring plots were above the five (5) year monitoring period requirement. Two (2) plots fell below the five (5) year monitoring period requirement. Table 2 (Appendix B) provides a stem count total and planted stem total by each individual vegetation plot. Table 3 (Appendix B) provides a summary of only planted stem counts as compared to planted stem counts of the As Built. Vegetation monitoring plots were photographed and are located in Appendix C. Vegetation Monitoring Plot Data Sheets are provided in Appendix D. Each Vegetation Monitoring Plot Data Sheet provides measurements, location, and vigor of each planted species within a respective vegetation monitoring plot. 3.2 Photo Stations Photo documentation is essential to monitoring the success the Bank Parcel. Photos provide a visual assessment of the vegetation conditions. All three (3) photo stations installed by McAdams were located in Monitoring Year 2. Photographs were taken at high resolution using an Olympus FE -115 5 0 megapixel digital camera. The locations of the photo stations are depicted in the Monitoring Year 2 Exhibit (Appendix A, Figure 2). Photographs for the photo stations are located in Appendix E. 3 4.0 References EcoEngineering — A division of The John R. McAdams Company, Inc. April 27, 2012. Wayne County Development Alliance Bank Parcel Bank Parcel Development Package EcoEngineering — A division of The John R. McAdams Company, Inc. June 2013. Arrington Bridge Bank Parcel Neuse Riparian Buffer and Nutrient Of set Mitigation, Phase II — As- Built Report. Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. CVS -EEP Protocol for Recording Vegetation Level. Version 4.2 North Carolina Ecosystem Enhancement Program (EEP) October 2004. Guidelines_ or Riparian Buffer Restoration. Available at internet site: http://www.nceep.net/news/reportsibuffers.pd Carolina Ecosystem Enhancement Program (EEP) January 15, 2010. Procedural Guidance and Content Requirements for EEP Monitoring Reports North Carolina Ecosystem Enhancement Program (EEP) November 7, 2011. Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation Schafale MP and AS Weakley. 1990. Classification of the Natural Communities of North Carolina: Third Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, Department of Environment and Natural Resources. Raleigh, North Carolina. 4 Site Maps Park Put I • Afa � �30N i Course Polk • i1 o ' - • Alrborti� Cd `I All SOU • t 'yv •Goldsboro 1 � �• • • • .! II O oA a 1915 amp D TI a • ` 1 G� • ' Mr.Arthur",.' e• . \ �Laka t a ri•' • J[ ,Disposal ^ l9ii•1 J., � /jib / ' � � . sewJae OlcposJr tt` Legend 35 021'0.33 "N Bank Site Phase II 780 0'38.64 "W 7.5 MINUTE USGS "SW GOLDSBORO" QUAD; 1974 (PHOTO INSPECTED 1988) 7.5 MINUTE USGS "SE GOLDSBORO" QUAD; 1982 (PHOTO INSPECTED 1988) • • ttul i 1 FIGURE 1 - USGS QUAD - SW /SE GOLDSBORO It� 0 1,000 2,000 4,000 McADAMS Feet 1 inch = 2,000 feet r'.4�%w4p4 R 1A# w!1 JIw' I i M �• f� .�Ae I wr y �O� —�rt M otl f� N M7� t I r `f 'l r . 4 r r/ r t, f,\ �I FIGURE 2 ti� �_ &,'on �w�i NO wr�afrc���.�f we aw ow �am". "PRELIMINARY PLAT- h0T rOP SALES, CONVEYANCES, R RECORDATION. M.lf Y fw- ac f.R Esx -NEUSE 11 LLC. aourma -0 looms JNMlf m �t3 ,w 4w o a�fi+c fJ12 � +l MEOW �� sa r4 ft f� f fwlt�ds w�w��fwfl�i w!R w�af ��f� wl wf w�f �r �fslAa ifl11C f1�. yl! 1�- ,.I; I F. ES TM R E BX Kit �d Olt 01 r h a s e 4"W* HUC 03020202 HUC 3020201 MP HI t L. 1 LL- q 'tic , •o�J - \� —�- ftr 4 / s} APPENDIX B Vegetation Assessment Data Table 1. Vegetation Plot Mitigation Success Summary Table Arrington Bridge Bank Parcel Neuse Riparian, Buffer & Nutrient Offset Mitigation Site Phase II Wayne County, NC Monitoring Year 2: August 28, 2014 McAdams Project #: EBX -13020 Vegetation Plot ID Vegetation Threshold Met ?* Tract Mean I No 50% 2 Yes 3 Yes 4 No * Target density is a minimum of 320 planted trees per acre,at the end of the five (5) year monitoring period according to the "Wayne county Development Alliance Bank Park - Bank Parcel Development Package ", April 27, 2012 0 a a o � brio 0 w �a p„ w H � O � � U •C� N � z IV O N N O 00 M W a � � O N v U � •o 8 L r M u Q ,U H _M O N i. L o N r- 00 O L� N F O CC Q. z d o N L 00 00 z o z �- Q 0 N 00 p ^ M g N iL to N ^ O v1 NO kn N yO a � M 9 kn A N ^ 00 N M t > ^ a. a L 4 M N N L '' O kn O U - � O qu O y q U' q Nl L ou g o U c3 ., 4 u U O1 L o � L r M u Q ,U H IL > E k k k I % 228 le k§CM � 0Q% $9/ zom CL IM C E ■ o■ ■ = « _ ®o••� U '2 zMU2� a . � m > , &a 22� �2> ate® 0,2 a c e 72 FA Cc z ©�2 |9 |\ n f |9 2 |9 PAS 22J 72e 002 4040\ mmE �kd Cc E a E m =a %mom �J7 ( � Nil § Z5 > B £ 2 S 2 \20M j d / § k�0 o CL 0 \� $2 = - ■2 \ G ■ = o sue _ o � -he tm ou 3 g = (D 3 CL .7o § $ k > m- -0 E k d /0ƒ 0 » �_. - o E a CL o w § § �a) /tea o c- o� ■ �22o- 2E«£k� f 2 o o E 5 - o n e,o 8 da 'w g . a 0) CD 0. Ex =m e ° 2 cn = �e =�§ E c 2 E 0 $ CL.B k J -0 e » 2 a S k7aE CL CM § \ k A @ c 2 f 0 �� § $ .0 E`2�- k\ƒk§� @E' 2 5, ® - c t (D 05�� ��_ ®= § § ��#�cr o $ /240 2& a c E 0 2m9m w 75 APPENDIX C Vegetation Monitoring Plot Photos VEGETATION PLOT Is VIEW FAGIN6 13 °5E. VEGETATION PLOT 2c VIEW FACING 23 °SW. VEGETATION PLOT 3= VIEW FAGIN6 55 °NE. VEGETATION PLOT 4- VIEW FA IN6 75 °5W. APPENDIX D Vegetation Monitoring Data Sheets Site,Amngton_ Bridge Bank Parcel `Pages 1 Momtonng,Year ,ktNY -2 Date 8/28/2014 Area tPhase 2 Vag PIot,No , 1 X=axis Plot Location &5 °SW CURRENT MONITORING YEAR DATA Year 1 Se 2013 see sketch below' X Y ddh Height DBH ddh Height Map ID Scienbfic Name CommonlName Source meter meter mm cm --Tm= Vigor mm cm Notes 1 Quercus�m ra water oak B 04 1 1 _ _ _ _M missing- 2 Platanus occidentalis sycamore B, 96 211 2158 150 0702 3 0 921 56 covered with -3 Platanus occidentalis sycamore B 66 29 M 0'461 60 4 Quercus michauxu swamp chestnut oak B4 37 38 M 01421 -53 5 Platanus occidentalis sycamore B 03. 43 M 0 421 52 6 Platanus occidentalis sycamore B 24 64 M 0 447 61 -7 Platanus occidentalis -sycamore B 32 04 98 82 3' 0 558 49 8 Betula ni ra river birch B 53 58 M 0 425 54 _ 9 Taxodwm distichwm bald c- ress B -152 76 M 0 732 48 10 Platanus occidentalis s camore B 75 78 M missing 11 Quercus ni ra water oak B 16 92 6164 45 3 0 588 53 12 Platanus,occidentahs sycamore B 48 911 1 1 M" 0 461 53 ,B,=bare root, Y ditch 145 f � CURRENT MONITORING'YEAR DATA _ VOLUNTEER HEIGHT CLASSES cm Scientific Name - '10 =50 50=100 > 100 Li4uidarfibar-styraciflua 12 Prunus s 1 ,B,=bare root, Y ditch 145 f � CURRENT MONITORING'YEAR DATA _ VOLUNTEER HEIGHT CLASSES cm Scientific Name - '10 =50 50=100 > 100 Li4uidarfibar-styraciflua 12 Prunus s 1 Site: Arrington Bridge Bank Parcel Page: 2 Monitoring Year: MY -2 Date: 8/28/2014 Area: Phase 2 Veg Plot No.: 1 X -axis: 5 0SW 1 0 c f E F 4 3 2 1 0.5 0,0 O 13S E° O b / 0 y I X -AXIS )enotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at le time of monitoring. Stem should be searched for at location during subsequent Monitoring Years ecause the stem may grow above herbaceous layer. ) enotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years ecause the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. - ------ + -- - - -- ---------- - - - - -- - - - - - -- 12 ------ - -- - - ---- -- - - - - -- ----------------- - - - - -- -------------------------- - i ------ ---- -- -- -- ---- +---------------- f_______ ________4_______- - _____-- ____ -- -- - - - - -- -------- +- - -__ -- -- 10 - - -_ -------- }- _______ _______T_______ _______ ___ __ -_ nD6 ________ ________ _______ +_____ -- - - - - - -- -- - - - - -- ---- ____ +_______ _______ +__ - - - -- -------- +________ _______ +_______ -- -+ t ---- -- ------ - -• - - -- - y - -- - - - - -- -------- •- - - - --- --- - - -- -- ---- -- -- - - - -t- - - -- I ------- 1 - - - - -- -------- 5 -------- t---------------- - ___ - - -- -------- -------- _______w_______ ------- .-- - - - - -- -------- ---------------- _ ----------------- ---------------- _ -------- 4 ' 2 3 - -- - - -- 1 - -- - - - - -- --- ---- t- - - - -- -- --- -- -±- - - ---- ------- ±-- - - -- ------- i-------- -------- F- - - - --- ------ +- - - - - -- ---- ---- +-- - - - - -- - -- -- - -+- - - - - - - - -- - - - - -- O 13S E° O b / 0 y I X -AXIS )enotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at le time of monitoring. Stem should be searched for at location during subsequent Monitoring Years ecause the stem may grow above herbaceous layer. ) enotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years ecause the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. Site Arrington Bridge Bank Parcel Page 1 Monitoring Year MY -2 Date 8/28/2014 Area Phase 2 Vag Plot,No 2 X -axis Plot Locabon 16 °SE see sketch below CURRENT MONITORING YEAR DATA Year 1 (Sept 2013 10-60 X meter Y meter ddh millimeter Height cenbmeter D13H cm Vigor ddh Height Notes Ma ,ID Scientific Name Common Name Source millimeter centimeter 1 Quercus phellos willow oak B 1 2 15 688 17 2 047 36 deer 2 Taxodium distichium bald cypress B 03 42 Dead 058 58 DEAD 3 Betula m ra river birch B 1 3 62 1647 150 0 366 3 missing 4 Fraxinus pennsyivanica green ash B 12 82 1211 70 3 0 601 33 5 Taxodium distichium bald cypress B 37 8 M missing 6 Quercus m ra water oak B 91 10 M 0 441 50 7 Taxodium distichium bald cypress B 61 79 1488 72 3 0 613 57 8 Platanus occidentalis sycamore B 38 62 1489 120 3 0 548 51 9 Quercus michauxii swamp chestnut oak B 21 42 M missing 10 Taxodium distichium bald cypress B 43 42 146 90 3 missing 11 Platanus occidentalis sycamore B 36 1 6 2022 135 0 367 3 0 576 49 insect 12 Fraxlnus nns vanica green ash B 57 1 7 149 70 3 0 491 28 13 Platanus occidentalis sycamore B 82 1 6 M 0 721 56 14 Taxodium distichium bald cypress B 82 41 M 0 499 39 15 Betula m ra river birch B 6 3 41 1533 135 0 216 3 0 349 44 16 Quercus michauxii swam chestnut oak B 59 57 1144 59 3 missing 17 Taxodium distichium bald c ress B 89 56 11 52 90 3 0 682 53 18 Platanus occidentalis s camore B 8 2 5 7 975 80 3 missing C B r bare root � ditch I --e x � 176 rail road xY CURRENT MONITORING YEAR DATA VOLUNTEER HEIGHT CLASSES cm Scientific Name 10-60 60 -100 > 100 Ulm-us slats 12 Pinus palustris 15 Li uidambar styracrflua 6 Site: Arrington Bridge Bank Parcel Page: 2 Monitoring Year: MY -2 Date: 8/28/2014 Area: Phase 2 Veg Plot No.: 2 X -axis: 16 1SE 23SWO X-AXIS 0 1 2 3 4 5 6 7 8 9 10 0 1 II �O 2 11 ( o� 12 o 13 3 4 �- - -- - 9 14 I 15 10 _Ln 1 5 s 6 16 17 18 7 3 I 8 8 9 5 7 4 10 1 6 MEN Denotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at the time of monitoring. Stem should be searched for at location during subsequent Monitoring Years because the stem may grow above herbaceous layer. Denotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years because the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. Site Amngton Bridge Bank Parcel Page 1 Momtonng'Year MY -2, Date 8/28/2014 Area Phase 2 Ve&lot -No 3 X -axis Plot Location 3 °NE see sketch below CURRENT MONITORING YEAR'DATA Year 1 Se t 2013 X I Y ddh Height DBH ddh Height Notes Map ID Scientific Name Common Name Source meter meter millimeter centimeter cm Vigor millimeter centimeter 1 Quercus michauxu swamp chestnut oak B 0 1 3 672 37 3 missing 2 Taxodium distichium bald cypress B 47 2 1353 87 3 missing 3 Taxodium distichium bald cypress B 2 35 964 42 3 0 519 44 res rout 4 Platanus ocadentalis sycamore B 57 44 1147 98 3 0 538 52 insect 5 Taxodwm distichium bald cypress B 38 6 1673 101 3 0 641 51 6 Platarius ocadentalis sycamore B 1 5 67 M 0 582 49 7 Taxodwm distichium bald cypress B 1 171 96 2271 150 0 356 3 0 778 50 8 Platanus occidentalis sycamore B 3 89 12 03 107 3 0 594 51 insect 9 Taxodium distichium bald cypress B 54 97 198 95 3 missing 10 Taxodium distichium bald cypress B 58 83 3023 120 3 missing 11 Platanus ocadentalis sycamore B 76 65 M missing 12 Taxodium distichium bald cypress B 79 95 M 0 631 47 13 Taxodium distichium bald cypress B 92 841 2701 1 125 3 0 576 51 14 Quercus ni ra water oak B 42 9 3 M missing 15 Quercus michauxu lswarnp chestnut oak B 7 8 191 Dead 1 0 593 1 52 IDEAD 16 Taxodium distichium I bald cypress 113 1 921 01-- 6182 1 31' 1 1 3 1 0 597 1 53 1 res rout C L 1 i I I' B = bare root XY ditch CURRENT MONITORING YEAR DATA VOLUNTEER HEIGHT CLASSES cm Scientific Name 10 -60 50 -100 > 100 Site: Arrington Bridge Bank Parcel Page: 2 Monitoring Year: MY -2 Date: 8/28/2014 Area: Phase 2 Veg Plot No.: 3 X -axis: 3 0N E 0 1 2 0 1 X -AXIS 3 4 5 6 7 8 9^ 30 2 3 1 4 I tA 5 i 6 7 8 9 3 10 X -AXIS 3 4 5 6 7 8 9^ 30 O 55NE° notes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible time of monitoring. Stem should be searched for at location during subsequent Monitoring Years :ause the stem may grow above herbaceous layer. notes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years :ause the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. 16 1 ! I 2 3 - O I_ 5 � I I 8 10 13 7 9 12 I i O 55NE° notes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible time of monitoring. Stem should be searched for at location during subsequent Monitoring Years :ause the stem may grow above herbaceous layer. notes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years :ause the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. 'Site Arrington Bridge Bank Parcel Page 1 Monitoring Year MY -2 Date 8/28/2014 Area Phase 2 Veg Plot No- 4 X -aws Plot Location 32 °SW see sketch below CURRENT MONITORING YEAR DATA Year 1 (Sept 2013 X meter Y meter ddh millimeter Height centimeter DBH cm lVigor ddh I Height Map ID Scientific Name Common Name Source millimeter I centimeter 1 Quercus michawai swam chestnut oak B 0 2 0 8 15 32 105 3 0 7,76 53 dN 2 Quercus m ra water oak B 07 32 M 0 781 59 3 Taxodium distichwm bald cypress B 1 1 6 M missing 4 Quercus michauxii swamp chestnut oak B 1 -3 87 1041 33 2 0 918 55 res rou 5 Quercus ni ra water oak B 3 9 9 6 M 0 542 49 6 Platanus occidentalis sycamore B 75 81 1296 92 3 0 519 48 7 Betula ni ra river birch B 7 2 61 M 0 661 49 8 Taxodwm distichwm bald cypress B 42 6 3 M missing 9 Betula m ra river birch B 3 2 3`6 976 86 3 0 392 52 10 Taxodium distchwm bald cypress B 71 2 8 M missing 11 Quercus,michauxii swamp chestnut oak B 10 13 M 0921 60 12 Taxodwm distichwm bald cypress B 6 8 0 6 M missing 13 Quercus m ra water oak B 31 0 2 496 42 2 0 338 39 B = bare root Y C `/ 1 l xY x I 118 CURRENT MONITORING YEAR DATA VOLUNTEER HEIGHT CLASSES cm Scientific'Name 10-50 60 -100 > 100 Site: Arrington Bridge Bank Parcel Page: 2 Monitoring Year: MY -2 Date: 8/28/2014 Area: Phase 2 Veg Plot No.: 4 X -axis: 32 0SW 1( c E L L i I I I I I I I I 5 I I I I i I I I 4 I I I I I I I I I I 6 - - -- - - - - -- - ------- F- - ---- -------- -- - - -- ---- ---- ±- - - - - -- -------- F - - - - -- ------- -- - ----- ---- --- -F- - - - -- ----- -- + --------------------------------- ------ - i-- - - ---- - - -- -- - - - - - -- 3 -------- ------ --- ---- -f-- - -- - -- - - - - -- 8 -- - - - --i F - - - - - -- -- 7 --- - --- -1 - - +- - ----------------------------------- t ----------------- y - -- ----------------- t -- 1 - -t - -• - - -- ------- i - - - - -- I 2 I g I I •-- - -- - -- -- - - - ---, - - - -- - - - - - -- 10 - -- - - - - - -- -------- E ----------------- 4 -------- ---- --- -4-- - - - - -- ------- 4 - - - - -- ----- --4- - - - - -- -- ---- -- E - - - - -- I --- -- -- a-- - - - - -- --------F-------- - --- - - - + -- 11 I 1 I -- �-- - - -- -- I 1 I -------- ± - - - - -- I I ------- ±- - - - - -- I I I 13 - ±- - - - - -- I -------- h- - - - - -- I ------- i--- -- ---- 12 - -- - - - --I I --- ---- +- - - - -- I -------- +- - - - - -- ' ------- +- - - - - -- 1 0.5 0,0 0.5 I L 3 4 J b / i3 �I l u X -AXIS 0 75SW° )enotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at ie time of monitoring. Stem should be searched for at location during subsequent Monitoring Years ecause the stem may grow above herbaceous layer. lenotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years ecause the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years. APPENDIX E Photo Stations PHOTO STATION It VIEW FAGIN6 48 °5W. PHOTO STATION 21 VIEW FAGIN6 WNE. PHOTO STATION 3: VIEW FAGIN6 77 °5E.