Loading...
HomeMy WebLinkAboutNCC223406_Site Plan or Location Map_20221003LEGEND: ----16 ---- EXISTING CONTOUR LOD LIMITS OF DISTURBANCE ---- SILT FENCE CONSTRUCTION ENTRANCE EC DRAINAGE AREA RIP RAP APRON 404 WETLANDS TEMPORARY PIPE BAFFLES �® SKIMMER >TDD- >TDD- TEMPORARY DIVERSION DITCH A CHECK DAM NOTES: 1. SEE GENERAL NOTES (C-1.0) AND DETAILS FOR MORE INFORMATION. 2. TOTAL LIMITS OF DISTURBANCE = 85.78 ACRES. 3. PORTIONS OF THE SUBJECT PARCEL LIE WITHIN FLOOD ZONE X (MINIMAL FLOOD RISK), FLOOD ZONE AE AND FLOODWAY AE AS INDICATED BY FEMA FLOOD ZONE PANEL 1056 & 1057, MAP NUMBER 3720105600K & 3720105700K, BEARING AN EFFECTIVE DATE OF AUGUST 28, 2018. FLOOD SOURCE: SHALLOTTE RIVER GRADING NOTES: 1.) SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITABLE MATERIAL AND PROVIDE STOCKPILE LOCATIONS ON SITE IF NOT SPECIFIED. SEE GENERAL NOTES SHEET (C-1.0, TYP.) FOR GRADING, DRAINAGE, AND EROSION CONTROL SEQUENCE NOTES AND REQUIREMENTS. IN ADDITION, REFERENCE TECHNICAL SPECIFICATIONS AND DETAIL SHEETS FOR MORE INFORMATION. 2.) SEE GRADING AND DRAINAGE PLANS FOR FINISH GRADES AND STORM PIPE SCHEDULE. 3.) A GEOTECHNICAL ENGINEER OR INSPECTORS SHALL BE CONSULTED TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL AND PROPER COMPACTION PER EARTHWORK SPECIFICATIONS IN FILL AREAS. ASPHALT AREA/BUILDING PAD NOTE: 1.) SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED SUBGRADE, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. EROSION CONTROL NOTES: 1.) SITE CONTRACTOR TO FOLLOW TYPICAL SEQUENCE OF EROSION CONTROL MEASURES ON GENERAL NOTES, SHEET C-1.0 2.) DURING PHASE I CONSTRUCTION, TEMPORARY DIVERSION DITCHES AND PIPE WILL CONVEY THE STORMWATER RUNOFF TO THE APPROPRIATE SEDIMENT BASIN. TEMPORARY CHECK DAMS SHALL BE INSTALLED, WHERE APPLICABLE, IN THE TEMPORARY DIVERSION DITCHES. SILT FENCE SHALL REMAIN IN -PLACE DURING ALL CONSTRUCTION ACTIVITIES. NCGRI D(NAD83/2011) TEMPORARY EC PIPE SCHEDULE: Temp Pipe No. Pipe Upstream Invert Pipe Downstrea m Invert Diameter (In) Pipe Material Pipe Length (ft) Slope (%) 1 39.00 38.50 15 H D P E 40 1.25% 2 37.75 37.25 15 H D P E 40 1.25% 3 30.00 29.50 15 H D P E 40 1.25% 4 25.00 24.50 15 H D P E 40 1.25% 5 24.25 24.00 15 H D P E 40 0.63% 6 24.25 24.00 24 H D P E 40 0.63% \ I I 1 1 I 1 1 / I _ I I 06Z `Od3dObd SdW 1 qqL cJd 9Z 9dg0 \ O„ 89986050990V \ INV. 25.00 - - - - � \ 106605098668 \ 1 I \ �-� ` 7 / ` /( MAS PROPERTIES LLC 1 _ _ TOTAL LIMITS OF _ \ .. INV. 27.0o DISTURBANCE = 8578 ACa�' I / � >TD� ° DB 1879 PG 290 \ TYP. / 1 Z / - - - J >TDD� _ ° �J ° \ `. _ \ PB 28 PG 144 /\ . - \ I 1 � TEMPORARY SILT FENCE TO REMAIN \ _ I \ TDDD# g � , INV. 25.00 \ THROUGH PHASE II CONSTRUCTION oz 1 i = - - 11q TD T° I \ (TYP. - SEE DETAIL) 1 \ ✓ /,*�■■■■■■■�■■■■* INV. 27.00 D#116 oy C ) \ 1 I -� '- �- T --'- I ; qt '1 �1 / ��'- �♦ // / /\ \ \� �` �� EC PH I / # / \RP " I I TEMPORARY DIVERSION 1 -T" I v I 1 / ♦ji / / / \ L _ ���.- �1 / DITCH TYP. \\ _ 1 Z I \ (♦♦ // / \ y / / INv. 27.00 ♦• I DA#11 I \ _�- �I �\ / [SEE DETAILS] \ -T- �- oZ 1 \ ♦ � / \ � / / \ Too 4.39 AC. TEMPORARY PIPE, TYP. ` - 1 ` ` - I • \ 1 I �♦ / \ // / \ % �\ \ ) 1 1 [SEE SCHEDULE] IJ / ♦ \ - 1 \ / / / / / (// / \ > o INV. 24.50 INV. 24.25 \ z \ / ✓ I 6 1 11 1 TEMPORARY RIP -RAP _ - � � 1 � x� / '♦ / \ \ L I l -- .�♦" � / I \ \ � \\\\NV. 24.00 � ^ \ �♦ � \ r APRON, TYP. / I \ / \ \ 1 \ 1 / / / ♦♦ / .�/ \ 1 I / /o EMERGENCY 1 ♦♦♦ \ /) \ \ III I 1 111111I II _ _ I [SEE D\ETAILS] • / \ ♦- J\ � _ \ \ /\ \ \ � �• \ \ \ \( ( II �♦�{♦ TEMPORARY E OTO■ ♦ � °�\- >- TD -[SEE DETAILS] SPILLWAY ENTRANCE,TYP. o c >TD 'ro i I !! I [SEE DETAILS] 1 I I i • / 3.68 Ac. - ♦ I I - \ \ \ J \ J f \ I I I (~ \\\\\ ♦ ♦ >�Q ► \ / EC PHI / INV. 36,25 • \ ` , - - _ / \\ \ \ ♦♦ ) / I \ \ ) / • \ \ ) / WETLANDS TYP. INV. 26.00 DA#4A > I ( - - / / \ ` 1♦� \ - 1 _ / \ \ / / /; 1 L / 1 I \ \ I / CQ#�� /• TDD#�4E / %♦♦ \� I (� /� EC PHI / / \ f �/ i/ , ` \ EC PH I DA#6 / �) �) / - / / / i I 5.96 Ac. °P z� \ l I / ro \ \ / of I J _ i=>rDD-� Ta / ♦♦ % ` DA#5 0,0\ _ I 9.97 Ac. TDD#4. �\INV. 36.00 e ♦ \ • .c. L'TJ sy APPROXIMATE LOCATION OF I 1 / STOCKPILE AREA, IF NEEDED. i SEE SHEET C-1.1 FOR EROSION N37.INV. 33.50 J -� ■ \ \ / ° / N I / CONTROL INSTRUCTIONS) `IV. 75 _3 " p'#` -'�o-7 r� / r / 1 \ � \ ■ \ \ \ I I v � ° � \J � INV. 37.25 EMERGENCY � � 'r � \ ` \ ■ 1 \ \ \ I I . I- SPILLWAY INV. 34.00 G ♦ / �� ti \ \ \ I I / f / INV. 37.50 _ - ♦ \ \ \ \ \ #6 EC PH I < [SEE DETAILS] \Q\ \ ♦°�`r,� l � ■ \ \ \\\ � \�� 1�✓ `/ 'i I ' 1 \ I INV. 41.^ _ DA#12 I r /• / i I [SEE IETAILS] I ° I \ J I I 1 \ \ \ \ \ / \ EMERGENCY I I i DAM, TYP. / AN I / ) ) J I \ \ 1 / SPILLWAY \ \ I I \ [SEE DETAILS] \ o �� / \To \ / % / / /- - - / .I / Q�o� oo [SEE DETAILS] \ ° \ / I INV. 27.00 I \ I �/ O al< / INV. 31.00 ■r \ / i°1 i r o3g _ 1 % \ \Se#S / / / / ■�■� ■■•■■■�1 f ( o I I TD \ / ] INV. 32.00 _ \ / :■■■■�■■VT■I \ I \ / ■■■■1i I 1 1� i I // EC PHI L � % �° / / j / \ �♦ TD / / - 9.94 Ac. / , >TD \ / ° f �o / / ♦1 • \ / / / / (/ \ \ 1 \ ^O/ / ° Qom/ / / /DOTAL AREA ♦♦ • \ / 'T \ % ° I / 0 1 y TDp � - 01 ` \ / j V °moo \ I L 6,c 778 S. ) ► / / / \ ° \ 1 \\�INV.37.00 138.01��/ \, "\\� I / / / o'�i°rINV. 24.25 \ INV.39.00 (DDT/ \ TDOTo3� >TD_ >.■�••• \ I / 1� \ ` I ♦♦♦ ■ I I I I 1� \ \ �\ �. I I ( \ �/ _ ` v6 �Q INV. \ \ Tp #1 LTDD,I� > .�:,■■•,•y ).� I � \ ■i■ INV. 36.00 / \ 1 \ `� ■■�� -INV. 35.00 0 pro INV. 33.00 e / I ' ■ I \ \ INV. 38.50 ` 1 i \ ` >TD EC PHI ■ / J ( / \ / / o�J -, / TDD#12C �j \ � / 1 \ ■- EC PHI I h� �\ �� � >oo-/ � / (1 \ \ \ \ \ INV. 33.00`� / /-1 DA#8 / \ \ \ / I l I vl° G �°�f o \ \ (,/ ; \ \ s 3.06 Ac. \ \ \ / DA#7 ■ \ - J 1 1 / 9.21 Ac. / / ( INV. �.50 / - I INV.4��\ \ ■ / \ \ \ \ �INV.25\ /„ \ I -•- \ \ \� �� �\ l 1 SPIL WAY \ / ■ / I I / /�\�/ l I I \ 1 \ • \ \ � ( (o �. � � CY � .INV. 35.00 zR' ♦�♦ •• / / / / \ / >rD \ I ETAILS D] \ � � I / _ • \ �� \ \\_ \ \ \ l I°r\ '� �o \ � \� ♦♦♦♦♦\ • �/• I I j I \ o // iT >T EMELLWAY RGENCY 7C \ \ ♦�i [SEE DETAILS] EC PHI INV. 29. I 1 ° / I Ila \\\\\ \ \ ♦♦♦ \ • /• I I _ r I \ �I / _50 / \ ♦�( \\� 3PP \ \ DA#2 I \ / / I / ♦♦j♦ I b \ \ \\ \\8.87 . \\\\�AI I YPWETLANDS T AC�\ ♦♦♦\♦\ \\ \ // I / I ♦ ♦� ♦\•\I •I I �h.� � I I� INV. 30.00 ° \\1♦4kk ? a/ / / EMERGENCY♦C\ \ \ INV. 31 I50 { J/ "\R, / SPILSEE DETAIL LWAY \ ■ / ♦ V_// / INV. 32.00_ �� [ 1 h \ \ I \ %■ / / r \ INV. 32.00 � ��'�■�■••,�/ \\ \�� �\� INV.37.00 ) � 1 \/// MIS � \ \Xo�z/ � � / / �) � \\ \ ` , ■ \ 1 / / / / - / oY WETLANDS, TYP. 1 EC PHI �� �I ■■�■( / I �\ �s� \ /\ �`4a �/ '1` 1 / EC PH I / / / / / \ DA#1 \ \ �" i 1■� \ ��/ �j I'o oy - /� \ ■ / ) DA#9 / INV. 31.00 \ \ \ Eo I I I INV.37.00 \ I / \ ■ EMERGENCY � - � � � ■■■� I / � � A 5.86 Ac. �) � � I / I sPILLWAY \ / ICl/( o cP / [SEE DETAILS] EC PHI \ \ / I \ ) LIMITS OF WETLANDS INV. 42.00 DA#10 > ° \ / \ 1 \ \ \ \ I I (TYP.) 3.82 Ac. - DD#10A / I I Sb Od 9Z880 SKIMMER SEDIMENT BASIN, - - - 's''P,� -moor INV. 34.00 ILT �1 \_P. >TDD- >TDD#9A[SEE DETAILS] TD� >TATLANTIC TELEPHONE MEMBERSHIP CORP SKIMMER DEWATERING DB 826 PG 45 DEVICE, TYP. 105719710017 _ [SEE DETAILS] CAROLYN S. LONG \ \ EMERGENCY SPILLWAY DB DC PG 2019 [SEE DETAILS] PB 24 PG 97 L6 Od bZ 8d i 6 Wz Od 00 80 ONOI S NAlOaVO i L L00 LL6LLSOL i 1 1 I 1 � 1 1 I 1 I ! I 1h I III�\ I t 0 75 150 1 1 I 1 I I I t I I I 1 I 1 I 1 J GRAPHIC SCALE 300 Y67G11=M1114181 .M z O W U O N Z �OW O LL cn z _ J O O U W0- Z O � N Z _ U o W 00 ' d, W N \~ O `1 Z� V 0� z �o A W O U O U � � O �O cry � U 0 Q � N b W Of U ON Q Q H z 0 u O o� U Q ~ Q z Z � 00 o O LL U) J J 0_' z_ v <�° �Q�j ) w � p z LU o > Z z O U J W Q W J S2 5 U coo SEAL \Illniulli, CARo \ ° `FES 9 = 028847 = FNGIN�:�°°��� LW��,��� 9107121 C-3,00 PEI JOB#: 20514.PE S 1 I ■ i _ •., .lot . rommlg�rm VICINITY MAP 111 -- LEGEND: EXISTING CONTOUR -goo goo- LIMITS OF DISTURBANCE SILT FENCE CONSTRUCTION ENTRANCE c:::3 EC DRAINAGE AREA RIP RAP APRON W W W 3M 404 WETLANDS BAFFLES �® SKIMMER 4^ CHECK DAM NOTES: 1. SEE GENERAL NOTES (C-1.0) AND DETAILS FOR MORE INFORMATION. 2. TOTAL LIMITS OF DISTURBANCE = 85.78 ACRES. 3. PORTIONS OF THE SUBJECT PARCEL LIE WITHIN FLOOD ZONE X (MINIMAL FLOOD RISK), FLOOD ZONE AE AND FLOODWAY AE AS INDICATED BY FEMA FLOOD ZONE PANEL 1056 & 1057, MAP NUMBER 3720105600K & 3720105700K, BEARING AN EFFECTIVE DATE OF AUGUST 28, 2018. FLOOD SOURCE: SHALLOTTE RIVER GRADING NOTES: 1. SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITABLE MATERIAL AND PROVIDE STOCKPILE LOCATIONS ON SITE IF NOT SPECIFIED. SEE GENERAL NOTES SHEET C-1.0 TYP. FOR GRADING DRAINAGE AND EROSION CONTROL SEQUENCE NOTES AND REQUIREMENTS. IN ADDITION, REFERENCE TECHNICAL SPECIFICATIONS AND DETAIL SHEETS FOR MORE INFORMATION. 2.) SEE GRADING AND DRAINAGE PLANS FOR FINISH PAD GRADES AND STORM PIPE SCHEDULE. 3.) A GEOTECHNICAL ENGINEER OR INSPECTORS SHALL BE CONSULTED TO CONFIRM SUITABILITY OF SUBGRADE MATERIAL AND PROPER COMPACTION PER EARTHWORK SPECIFICATIONS IN FILL AREAS. ASPHALT AREA/BUILDING PAD NOTE: 1.) SITE CONTRACTOR SHALL STRIP TOPSOIL AND ANY UNSUITALBE MATERIAL AND PROVIDE CUT/FILL OPERATIONS TO PROVIDE A COMPACTED CONTROLLED SUBGRADE, IN ACCORDANCE WITH THE SUBSURFACE GEOTECHNICAL EXPLORATION AND TECHNICAL SPECIFICATIONS. EROSION CONTROL NOTES: 1.) SITE CONTRACTOR TO FOLLOW TYPICAL SEQUENCE OF EROSION CONTROL MEASURES ON GENERAL NOTES, SHEET C-1.0 2.) DURING PHASE I CONSTRUCTION, TEMPORARY DIVERSION DITCHES AND PIPE WILL CONVEY THE STORMWATER RUNOFF TO THE APPROPRIATE SEDIMENT BASIN. TEMPORARY CHECK DAMS SHALL BE INSTALLED, WHERE APPLICABLE, IN THE TEMPORARY DIVERSION DITCHES. SILT FENCE SHALL REMAIN IN -PLACE DURING ALL CONSTRUCTION ACTIVITIES. I I I - - �� J-� �► SSB 11 i 35 9 POND / SSB 4 / / / / i SF 27 '� - - - / _� \ DA=7.52 AC / r I DA=0.23 AC. `I SF29 - I111111 1 1 1 F-- _i I I I' I r DA=0.08 AC. I I1\\IIIII 1 � � fn 111 � 11 `l I � � � \ � ��x x- ` - X�y�.y_ � 1 11 ( ' 1 ` � � I �� / � \ �`� '' \ \ 2 I 11 1 I<r p -_-_ �l SF26 \ $�4� _ i \ 11 1 / 1 / _ - - - _ 1 - I �O / °\� �) 1 \ DA-0.� AC. WETLANDS lSF9 SF10 ) I - 1 \ e ` . 1 `- / '� °, ��/ ♦` I / \ I I \ DA=0.41 AC. ��DA=0.3. - - �� i " / TST 6 1 I ° V / _ I 1 �\ WETLANDS - - - - - I - SSB 10 / \ - I DA=0.64 AC. / TST 6 \ DA=1.26 AC. POND /SSB 3 1� / - \ \ G SF 25 �M N,1 \ ` DA=0.26 AC. SSB 9 1 N\x - / \ \ \ 1 \ 1 i J DA=1.34 AC. / / \ SF 11 `♦y _ i, ��✓ 1I111 /, / % WETLANDS \ I WETLANDS DA=0.38AC. 12 DA=0.12 AC. POND / SSB 7 DA=3.09 AC a 1 I I II� DA=0.29 / 1 \\\\WT \ 1� 's> 1 \ I 1 1 SF-5 1 WETLANDS I / DA=0.36 AC. II11111l�r \l \ o S - - \ \ \ �_ / r / / ) 1 SF 24 SF 16 DA=0.47 ACC. \ DA=0.30 AC. WETLANDS /' \ � ! -� \ II \� / \ r / / / , / TST�7 I I 1�5716729977 WETLANDS 1 v / - DA 0.15 AC. SF 17 DA=0.98 AC. = y JAMES TERRY YANDLE \ \ �` \ 1 �� �I ♦♦ DA=0.31 AC. 1 - / II DA=ST 10 \ DB 854 PG 480 I 1 ♦ 1 \ \00 \. r �I \ - L weT I� \ ♦ 1 / / \ POND / SSB 5 k sF� 1 - DA=9.42 AC DA=0.36 AC. DA=2.36 AC. �\ \ g�'r>li" � � 1 / � � �'I \ DA=0.35 AC. I l ` �DA=0.36 J9 SF I ll 19 =0.22 AC. . DA=0.19 AC. 1 I i TST 1 1 1 111 I ! I DA=0.68 AC. DA=0.28 S $ Ij 11 ll1 d I J� i _ L43 \ r 1 , � \ I III lV ` -` \ \ �;' DA=0.31AC. / SF 20 1 � ` DA-0.18 AC. _ 1 / 1TST 8 / _ POND / SSB 6 DA-0.70 AC. l \ � ,� DA=7.27 AC 1 - _ - J - - -�_�y- \ R01\ / \ / \ \\WETLANDS TST 9 \ \ L40 �3g- - - _ -� - a ���,� -_ ��-/ \ w / DA=0.63 AC. -- `- R'WETLANDSA \ I /-.�� i_ _�j SF 21 _ � N� - 1 1 1 /IV 02005'2911 E 1 C 573.01 � � � c DA=0.40AC. r_ _� SF 22 ? 1 1 1 105716728902 DA=0.20 AC. N 05 01 _ _ \ � \ _�`_ 1 ATLANTIC TELEPHONE 4'3511 E 1777.54' ,1 1 I MEMBERSHIP CORP 1 DB 826 PG 45 1 105719710017 1 CAROLYN S. LONG DB DC PG 2019 1 PB 24 PG 97 1 1 1 NCE� \ I I \1 106605098668 ✓) / / (n MAS PROPERTIES LLC 00 DB 1879 PG 290 00 PB 28 PG 144 WETLANDS 1 I S 0302410811 W IN I` DA=0.44 AC. V ) S F 30 1)A=0.50 AC. ` DA=0.48 AC. I � L DA=0.42 AC. r 1 TST 11 SF 34 rl DA=0.55 AC. )A=0.27 AC. I SF 35 / DA=0.39 AC. SF 38 DA=0.37 AC. SF 37 0.4 DA=6 AC. 1 \TST 12 DA=0.60 AC. v( WETLANDS <�7 N 567.11' 50 FT. SURFACE WATER SETBACK NCGRID(NAD83/2011) ZL i rw LINE BEARING DISTANCE S 70°38'02" W 69.12' N 75°22'47" W kL5 91.53' S 10010' 10" E 79.78' L6 S 88038'09" W 91.41' L7 N 63047'36" W 86.94' L8 N 21054' 07 W 5 1.41 L9 N 55005'41" W 147.88' L10 S 8201 T40'„W 41.47' L11 N 44 11 09 E 37.73 L12 N 35049'57" E 81.49' L13 N 45005'29" W 96.61' L14 N 82046'57" W 243.94' L15 S 50008'31" W 111.94' L16 N 86058'51" W 45.91' L17 S 81 °45'30" W 107.97' L18 N 29002'22" W 133.09' L19 S 67046'30" W 186.43' L20 N 43053'52" W 115.21' L21 S 36022'00" W 73.75' L22 S 79024' 15" W 68.88' L23 S 59042'42" W 116.98' L24 S 34034'56" W 141.88' L25 S 46056'35" E 125.29' L26 S 70047'09" W 149.40' L27 N 36032'20" W 7.69' L28 S 77046'37" E 25.80' L32 N 10031'39" W 217.58' L33 N 79043'29" E 185.49' L34 S 89002'54" E 101.96' L35 S 10019' 15" E 33.02' L36 N 79028'02" E 36.83' L37 N 79025'38" E 100.01, L38 N 79024'56" E 99.98' L39 N 07035' 57n E 95.79 L40 N 06037'40" E 105.28' L41 N 06042'33" E 59.99' L42 N 78038' 19" E 21.1 I L43 S 06046'06" W 223.94' L44 N 80048'12" E 269.71' 0 75 15 SHALLOTTE RIVER TOP OF BANK 1 I I I I I I I I I I I GRAPHIC SCALE 0 300 SCALE: 1 "=150' .gym U) z O Lu �w �oN z O O LL z _ J C) O U W0- Z O N N p N N Z _ QVo V V � U `1 Z� V 0 O z G1 A W Y� OO U n O V � � O O I� H N O d'd'U co co N Q Q H u Z O H Q U ~ 7 0 z Q z O L.L l� O O O vJ J J w Z U �a>f6° � Q 0 Z_ H W Wp O U J_j W > p > Z z Y W Q J U 0-UU a L 0 u 0 0 0 SEAL CARO/,% / \ .ODES° _ 028847 e = �O 5/2/22 C-3,01 PEI JOB#: 20514.PE