Loading...
HomeMy WebLinkAbout20221166 Ver 1_More Info Received_20220926Strickland, Bev From: Michael Tutas <miketutas@gmail.com> Sent: Monday, September 26, 2022 9:05 AM To: Perez, Douglas J Subject: Re: [External] Re: Fee Received for Tutas Cove Shore Stabilization ID # 20221166 Ver 1 Attachments: Catawba Notification Form.docx; Catawba Notification Form.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Thank you Doug, I have attached the completed form. MT 1 C y Project Name/address:. Owner: fa° " Print Contractor/agent: r 1 > On Sep 26, 2022, at 08:32, Perez, Douglas J <doug.perez@ncdenr.gov> wrote: > > Hey Mr. Tutas, > > Here's the Catawba Buffer Form that you'll need to finish off the application. I've attached it in two formats, but just use the one that works best for you. > > Doug > > Original Message > From: Michael Tutas <miketutas@gmail.com> > Sent: Thursday, September 22, 2022 10:15 AM > To: Rowland, Kelsey S <Kelsey.Rowland@ncdenr.gov>; Perez, Douglas J <doug.perez@ncdenr.gov> > Subject: [External] Re: Fee Received for Tutas Cove Shore Stabilization ID # 20221166 Ver 1 > > CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> > > > Hey Doug, > > Just checking on the status of my application as the fee has been paid. Is there an ETA on a determination? > > Thanks, > Michael Tutas > > » On Sep 1, 2022, at 10:00, laserfiche@ncdenr.gov wrote: » » The North Carolina Division of Water Resources has received the application called Tutas Cove Shore Stabilization that you submitted on with corresponding fee received on 8/31/2022. The ID number for that project is 20221166, Version 1. » » Reviewer Contact Information: Doug Perez - doug.perez@ncdenr.gov » Reviewing Office: Mooresville Regional Office » » If you have questions, please contact » Sheri Montalvo at sheri.montalvo@ncdenr.gov. » » Project file link: » https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=247 » 3592 » » This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.responses aren't monitored. 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Signature Contractor/agent: Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: Print Contractor/agent: Signature Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: