Loading...
HomeMy WebLinkAbout20141127 Ver 1_Mitigation Site Plans_20141023X6°2; Pfgecl Location ; �,: sy Vicinity Map Not to Scale 0 BEFORE YOU DIOI CALL 1 -800 -832 -4949 N.C. ONE —CALL CENTER WS THE LAW Mud Lick Creek Mitigation Site Cape Fear River Basin 03030003 Chatham County, North Carolina f ®m North Carolina Ecosystem Enhancement Program r� F�COSVStem E n �aircement PROORAM DRAFT PLANS October, 2014 Stream Origins Stream Latitude Longitude North ]Branch N 35° 45' 53.73" W 790 25' 56.95" East Branch N 350 48'46.31" W 790 25' 56.17" Mud Lick Creels N 35° 45' 50.97" W 790 26'07.48" Sheet Index Title Sheet Project Overview General Dotes and Symbols Typical Sections Stream Plan and Profile Planting Plan Erosion and Sediment Control Cross - Sections Details Project Directory Surveying: Turner Land Surveying, PLLC P.O. Box 41023 Raleigh, NC 27629 David S. Turner, PLS 919 - 575 -1375 Engineering: Wildlannds Engineering, Banc ]License No. ]F -0531 5605 Chapel Hill Road Raleigh, NC 27607 Angela N. Allen, PE 919 -551 -9956 0.1 0.2 0.3 1.1 -1.3 2.1 -2.10 3.1 Not Included 5.1 -5.3 6.1 -6.3 Owner: Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699 -1652 Perry Sugg 919 - 707 -5976 DENR Contract No. D14001i EEP ID No. 93452 m N woZ A?ammv tiw3 LL b rig b X z c 6 U 8 e E w m N M o aw u�z w 2z A?ammv Z E �w3 E 4� LO END EAST BRANCH BEGIN NORTH BRANCH � REACH 1 (ENHANCEMENT II) BEGIN EAST BRANCH STA. 306 +23 STA. 100 +00 (RESTORATION) �3 N m TO BE PURCHASED � U m b I � CE % CE / BEGIN EAST BRANCH END NORTH BRANCH (ENHANCEMENT II) EASEMENT BREAK REACH 1 (ENHANCEMENT II) STA. 200 +00 BEGIN NORTH BRANCH /\ MUD LICK CREEK / REACH 1 (RESTORATION) I BEGIN MUD LICK CREEK STA. 103 +27 m° REACH 1 (ENHANCEMENT II) P� U STA.300 +00 STA. 312 +79.25 ADDITIONAL EASEMENT m r c TO BE PURCHASED A � n e� END NORTH BRANCH om ao _ ao ��/ REACH 1 (RESTORATION) m ADDITIONAL EASEMENT END MUD LICK CREEK BEGIN NORTH BRANCH TO BE PURCHASED REACH 2 (RESTORATION) J\ /19 cn Z \\ STA. 108 +47 / EASEMENT BREAK ' L� 0 m °\ NORTH BRANCH REACH 2 a D END NORTH BRANCH \ om REACH 2 (RESTORATION) STA. 109 +32.21 - p STA. 111 +50 \ 3J w - ce ADDITIONAL EASEMENT 25 TO BE PURCHASED STA. 312 +58.84 CE E 1 \ C \ \ V REACH 2 (ENHANCEMENT II) BEGIN MUD LICK CREEK �F REACH 3 (ENHANCEMENT II) 15.0 END EAST BRANCH F, (RESTORATION) � w \ STA.205 +77 IEASEMENT BREAK END MUD LICK CREEK REACH 1 (ENHANCEMENT II) NORTH BRANCH REACH 2 v Ce J BEGIN MUD LICK CREEK ac 3 I STA. 109 +14.46 2 / A m N M o aw u�z w 2z A?ammv Z E �w3 E 4� LO END EAST BRANCH REACH 2 (ENHANCEMENT II) � BEGIN EAST BRANCH STA. 306 +23 ADDITIONAL EASEMENT (RESTORATION) m TO BE PURCHASED b � CE CE / BEGIN EAST BRANCH (ENHANCEMENT II) EASEMENT BREAK STA. 200 +00 MUD LICK CREEK / � REACH 2 P� U STA. 312 +79.25 c e� ADDITIONAL EASEMENT END MUD LICK CREEK �9 TO BE PURCHASED REACH 3 (RESTORATION) Z STA.320 +64 \ n off' om - EASEMENT BREAK MUD LICK CREEK w - ce REACH 2 Ce �_ CE .-2-9 STA. 312 +58.84 CE END MUD LICK CREEK REACH 2 (ENHANCEMENT II) BEGIN MUD LICK CREEK �F REACH 3 (ENHANCEMENT II) 15.0 STA. 313 +16 F, m N M o aw u�z w 2z A?ammv Z E �w3 E 4� LO END EAST BRANCH (ENHANCEMENT II) BEGIN EAST BRANCH (RESTORATION) STA. 201 +68 b BEGIN EAST BRANCH (ENHANCEMENT II) STA. 200 +00 � P� U e� �9 0' 80' 160' 240' (HORIZO -) S u v 6 U 8 «\ e E w General Notes 1. All erosion and sediment control practices shall comply with the North Carolina Erosion and Sediment Control Planning and Design Manual where applicable. 2. Contractor will install pump- around systems to divert flow while working in live, flowing channels. The Contractor shall operate and maintain the pump- around system twenty four hours a day unless all disturbed areas within the pump- around work area can be stabilized by the end of the work day. Contractor shall not remove pump- around systems and advance to the next phase until the current phase is completed and stabilized. 3. In areas without a pump- around system, Contractor shall disturb only as much channel bank as can be stabilized with temporary seeding, mulch, and erosion control matting by the end of each workday. 4. When crossing an active section of new or old steam channel, a mud mat shall be installed according to the details. 5. All graded areas with slopes steeper than 3:1 will be stabilized within seven days. All other areas will be stabilized within 14 days. 6. Locations for staging and stockpile areas and stream crossings have been provided. Additional or alternative staging and /or stockpile areas and stream crossings may be utilized by the Contractor provided that all practices comply with the North Carolina Erosion and Sediment Control Planning and Design Manual and are approved by Engineer prior to implementation. 7. Various types of constructed riffles are specified in this plan set per profiles, plans, and details. Contractor will build the specific types of constructed riffles at locations shown on the plans. 8. Contractor is to make every effort to avoid damaging or removing existing trees. Tree protection fence will be installed as shown on plans. 9. Invasive plant species including but not limited to Chinese privet will be removed from or treated within all areas of the conservation easement. 10. Under no circumstances will the Contractor Exceed the Limits of Disturbance shown on the plans. Construction Sequence 1. Contact North Carolina "ONE CALL" Center (1.800.632.4949) before any excavation. 2. Install and maintain on -site rain gauge and log book to record rainfall amounts and dates. Contractor is responsible for completing self- inspection forms required by DENR permit. Permit, rainfall log, Erosion and Sediment Control Plan, and completed inspection forms shall be maintained on site at all times. 3. Mobilize equipment and materials to the site. 4. Identify and establish construction entrance, staging and stockpile areas, haul roads, silt fencing, tree protection fencing and stream crossings as indicated on the plans for work areas. Note that all construction traffic will enter the site from the two construction entrances shown on the plans at Pisgah Bridge Road and Mack road. All haul roads shall be monitored for sediment loss on a daily basis. In the event of sediment loss, silt fence or other acceptable sediment and erosion control practices shall be installed. 5. Set up temporary facilities, locate equipment within staging area, and stockpile materials needed for the initial stages of construction within stockpile area(s). 6. Perform any necessary clearing and grubbing in phases as work progresses. Bank vegetation and vegetation immediately adjacent to live channels shall be left undisturbed as long as possible. 7. Remove or treat invasive species within the conservation easement as described in project specifications or as directed by engineer in the field. 8. Construction should generally progress from upstream to downstream to prevent sediment runoff from upstream construction on completed downstream reaches. 9. In areas where a pump around is required as shown on the plans, install impervious dikes at upstream and downstream ends of pump around locations. The pump around operation shall be performed between these locations as described in the plans and details. The pump around operation shall be installed in a manner that it will be allowed to run for twenty four hours a day unless channel within the pump around location can be stabilized within the work day. 10. Perform excavation and grading of channel and floodplain. Grade area between upstream and downstream dike locations where pump around operations are needed. The pump around operation shall be installed in a manner that it will be allowed to run for twenty four hours a day unless channel within the pump around location can be stabilized within the work day. 11. Stockpile soil in designated stockpile areas as necessary. Ensure that silt fence is properly installed and functioning along stream side of stockpiles as shown on Erosion and Sediment Control Plan. 12. Construct in- stream structures and install riffle features according to plans and details. 13. Seed, mat, and mulch banks and floodplain areas according to plans and details. 14. Once disturbed areas and exposed slopes are stabilized, remove pump around system, if used, and progress to the next phase. Note: At certain locations, water will be rerouted to the newly constructed channel in conjunction with removal of pump around systems. 15. Backfill abandoned channel sections with stockpiled soil. All non - native, invasive species shall be treated and /or removed from the old channel prior to backfilling. 16. Seed and mulch any backfill sections before proceeding to next phase. 17. Once all phases of channel and floodplain construction are complete, prepare the floodplain for planting per the specifications. 18. Remove temporary stream crossings, stockpile areas, and erosion control devices. 19. Apply permanent seed, mulch, and vegetation in the floodplain. 20. Ensure that the site is free of trash, debris, and any leftover construction materials prior to demobilization. 21. Demobilize grading equipment from the site. 22. Seed, mulch and stabilize staging areas, stockpile areas, and construction entrances. Existing Features Proposed Features - - - - - - Existing Property Boundary LDD LOD Proposed Limits of Disturbance - Existing 1' Minor Contour CE cE Proposed Conservation Easement 10 +00 Existing 5' Major Contour - I - Proposed Stream Alignment x Existing Fenceline - - - Proposed Bankfull Existing Thalweg Proposed 5' Major Contour n/w a/w Existing Right of Way Proposed 1' Minor Contour oHE Existing Overhead Electric Line CR -CH Proposed Chunky Riffle See Detail 4, Sheet 6.1 Existing Edge of Pavement cR'JZ Proposed Jazz Riffle Structure Existing Overhead Electric Pole See Detail 3, Sheet 6.1 R_N Proposed Native Material Constructed Riffle Existing Concrete Structure See Detail 1, Sheet 6.1 R -w Proposed Woody Riffle See Detail 2, Sheet 6.1 _ Existing Ford Crossing Proposed Angled Log Drop See Detail 2, Sheet 6.2 Existing Farm Road Proposed Angled Log Step Pool See Detail 3, Sheet 6.2 Existing Bedrock/Boulders /Outcrop Proposed Brush Toe See Details 1, Sheet 6.3 Proposed Log Vane •�� 0 See Detail 1, Sheet 6.2 Existing Wetlands Proposed Permanent Ford Crossing See Detail 1, Sheet 6.3 Existing Treeline 0 Permanent Culvert Crossing Existing Tree Existing Telephone Box Designed Channel Plug See Detail 2, Sheet 6.3 N M ce ' � �mC; aw uz w oz . A?ammv Z �z1' E tiw3 E 60 � b b b e� �yy 11 E w b 6�A E 590 585 580 575 300 +00 300+50 301+00 301 +50 Existing Ground 77 302 +00. 3Q2 +50 303 +00 303 +50 304 +00 590 585 580 575 304 +50 304 +70 4/ - ---- ----------- t - J; y .ate _• ��VV"' �. _ - 307 *00 L - � r3�E CE CE CE - CE _ 3J 3J CE CE CE CE CE CE CE CE __ C - - - -. / 0' 2' 4' 6' E CE CE __ CE CE CE - - - -- �� 3C 0' 20' 40' 60' (HORIM -) m N M m o aw u�z w oz Z o rn A -ammo �w3 LL G� vve bbm b lfid b c 6 U 8 E w z 3 a k� i=I 2 F-1 71 9 qb � t� 590 590 585 585 580 580 Existing Ground 575 575 304 +70 305 +00 305 +50 306 +00. 306 +50 307 +00 307 +50 308 +00 308 +50 309 +00 309 +50 I INSTALL CHANNEL PLUG of / \ (TYP) SEE DETAIL 2, SHEET 6.3 I ® I o / - ADDITIONAL EASEMENT TO BE PURCHASED / c / I �� 30j*OO l �oC) co END MUD LICK CREEK / V REACH 1 (ENHANCEMENT II) -- -- �J1 BEGIN MUD LICK CREEK REACH 2 (ENHANCEMENT II) - /G � STA. 306 +23 O �\ E .�... CE CE CEO / \ I� CEO CE 2 4 6 U 20' 40' 60' (HORIZONTAL) � mb a z z w oz r-I w 3 LL e eH f� eb eb b u I i b fly 4 2 w c 6 U 8 �^ E w z 3 a 590 590 585 585 580 " �- 580 Existing Ground 575 575 309 +50 310 +00 310 +50 311 +00 311 +50 312 +00 312 +50 313 +00 313 +50 314 +00 314 +50 GE GE - - -- t;E ____- - •_ `____ , - i , - END MUD LICK CREEK \ R EACH 2 (ENHANCEMENT II) m v - .. BEGIN MUD LICK CREEK REACH ( H 3 EN ANCEM313 \ - - -- _ADDITIONAL EASEMENT TO BE PURCHASED - - - - -' ,rya i + STA. 31316 1 '" '�+n EASEMENT BREAK ------ ______ ICREACH2 REACH2 _ _______ \ ST 3 2 +58 . 4 vv --------------------- ___ ----------------- ____ - /A / EXI STING FO RD CROSSING/ - -- - ----------------- _ ___ - -- U -- �. - o _ _ _ - _ _ o,,- •�� / I i �� _3 =_ -U /gyp �/ - __- - - - -- 30 __ EASEMENT BREAK v _ ,. n MUD lICK CREEK \ K I REACH -- -- 2 STA. 312 +79.25 \ °o /00 N A, PROPOSED FORD CROSSING v AjV- 44/ �44/ 0 LO W 310 +00,. U m w _ - - - - -- i i GE 0' 20' 40' 60' mmmmmq (HOR —NTAL) zG 9- m 6 az w oz z 2 �Z�z�E r� w 3 LL d� vvebm lfid �J f� eey I tc eb b u �dd 1-J I I S u b 9 b c 6 U /� ^ 8 f j( 1 E w z 3 a 585 tti.11 575 570 314+50 315 +00 315 +50 316 +00 316 +50 Existing G.Und 317 +00 317 +50 318 +00 3C I _30 — 3J I 1 1 I 1 i j �3��1, 20 T I I 1 I I � 1 I/ I I - 1 1 1 > *00 1 _ I 1 � I O i co I / A 318 +00 1 , 316 +00 y �• �� - -_ �_ 1 - - - - - - - - - - - -- 1 1 - 1 _ - = - - 1 CE CE -- 1 ------------------ E E CEO CEO CEO —CE - - - -- CF „ CEO CEO C - E C ` 1 585 580 575 570 318 +50 318 +60 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' MMMEmq (RORImrvT/ ) m N M m o j w oz Z o rn A -ammo Z �z�E �w3 LL ,e° 3o��� °� GO b ea ea 8 E w z 3 a 1� b 9 71 9 b j i n 1 D_ N Z n I� 70' 140' 210' (HORIZO -) m N M m o aw u�z w oz 2 o rn A Z�z�E �w3 LL '0 CIO vvebm ed lfid eb P� 'if c 6 U 8 e E w z `3 x bUU 595 590 585 580 bUU 595 590 585 580 ODU bUU 595 595 590 590 585 585 580 580 OW bUU 595 595 590 590 585 585 580 580 -30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 10 20 30 40 -50 -40 -30 -20 -10 0 10 20 30 ODU bUU 595 595 590 590 585 585 580 580 bUU bUU 595 595 590 590 585 585 580 580 -40 -30 -20 -10 0 10 20 30 40 -30 -20 -10 0 10 20 30 40 50 -30 -20 -10 0 10 20 30 40 50 ODU 595 590 585 580 bUU 595 590 585 580 ODU bUU 595 595 590 590 585 585 580 580 ODU 595 590 585 580 -40 -30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 10 20 30 40 50 60 bUU 595 590 585 580 DUU bUU 595 595 590 590 585 585 580 580 ODU 595 590 585 580 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60 595 595 595 590 -- - - - - -- -- - - - --- , -- 590 590 585 _ 585 585 580 580 580 575 575 575 ODU DUD 595 590 590 585 585 580 580 575 bUU 595 590 585 580 DUD 590 585 580 575 -30 -20 -10 0 10 20 30 40 50 575 -50 -40 -30 -20 -10 0 10 20 30 -40 -30 -20 -10 0 10 20 30 40 Existing Ground Proposed Grade 0' 10' 20' 30' (HORIZONTAL) m N M y m 0 aw ,�z w OZ Z O Ol A -ammo ZI �zE �w3 E L GO 0 0 v4m2, 9 eb �9 L� x C� � o 8 F� E w z 3 x 000 590 585 580 595 595 590 590 585 585 580 580 575 0a0 D0D 590 590 585 585 580 580 575 575 0y0 590 585 580 575 -30 -20 -10 0 10 20 30 40 50 -40 -30 -20 -10 0 10 20 30 -30 -20 -10 0 10 20 30 40 50 595 590 585 580 575 595 595 590 590 585 585 580 580 575 575 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 595 590 585 580 575 -70 -60 -50 -40 -30 -20 -10 0 590 585 580 575 -50 -40 -30 -20 -10 0 Existing Ground Proposed Grade 595 595 590 590 585 585 580 580 -40 -30 -20 -10 0 575 10 20 30 590 590 585 585 580 580 575 575 10 20 30 40 -50 -40 -30 -20 -10 0 595 590 r ' 585 580 575 10 20 30 40 50 60 0a0 590 585 580 10 20 30 40 590 590 585 585 580 580 575 575 590 585 580 575 10 20 30 -50 -40 -30 -20 -10 0 10 20 30 0' 10' 20' 30' (HORIZONTAL) m N M m o aw u�z w oz Z o rn A 7 z " E �w3 LL L '0 L0 0 0 42, 9 e e•y 1�ab �9 1LHH®M x C� � o 8 'Tl �VI L A E w z 3 x bUU 595 590 585 580 -30 -20 -10 0 ouu 595 590 585 580 bUU bUU 595 595 590 590 585 585 580 580 10 20 30 40 50 -40 -30 -20 -10 0 ovu ouu 595 595 590 590 585 585 580 580 bUU bUU 595 595 590 590 585 585 580 580 10 20 30 40 -50 -40 -30 -20 -10 0 bUU bUU 595 595 590 590 585 585 580 580 bUU 595 590 585 580 10 20 bUU 595 590 585 580 -30 -20 -10 0 10 20 30 40 -30 -20 -10 0 10 20 30 40 50 -40 -30 -20 -10 0 10 20 30 40 600 595 590 585 580 600 600 595 595 590 590 585 585 580 580 600 600 595 595 590 590 585 585 580 580 600 595 590 585 580 -50 -40 -30 -20 -10 0 10 20 -40 -30 -20 -10 0 10 20 30 -30 -20 -10 0 10 20 30 40 595 590 _ -- 585 580 -40 -30 -20 -10 0 Existing Ground Proposed Grade 595 595 590 590 585 585 580 580 595 595 595 590 590 __- 590 585 585 585 580 580 580 10 20 30 40 -50 -40 -30 -20 -10 0 10 20 30 -40 -30 -20 -10 0 10 20 30 0' 10' 20' 30' (HORIZONTAL) U eb �9 N M �4�zNmo w OZ Z O ,m A -anom� ri w 3 LL L yo° w 4G��0� G� 0 U g Lei E w � ; Y HEAD OF RIFFLE ELEVATIOI POINT PER PROFILI Profile A -A' SEE PROFILE 6" SALVAGED ONSITE FLOW COBBLE /GRAVEL BED MATERIAL Profile View A -A' LOG STRUCTURE EXPOSED UNTIL TOP OF BANK CENTER OF CHANNEL TOEOFSLOPE Log Section B -B' NOTES: • STRUCTURES SHOULD VARY IN SIZE AND TYPE WITHIN EACH RIFFLE. • ROCK MAY BE SUBSTITUTED FOR LOGS AT ENGINEER'S DISCRETION. Plan View B HEAD RIFFLE Z g z p�0 Fw au ,w w, LL3U � a r �F RIFFLE ELEVATION PER PROFILE 6" SALVAGED ONSITE COBBLE /GRAVEL BED MATERIAL RIFFLE INVERT PER PROFILE TOP OF BANK (TYP) Section B -B' Constructed Riffle b.l Not to Scale BURY INTO BANK S MIN. (TYP) BURY INTO BANK V MIN. (TYP) Jazz Riffle Structure b.l Not to Scale X31O w g Z pW0 a U m 2 y W � LL3U CR-NM CR-WD CRJZ _ O �rtJ CR -CH O BANKFULL Plan View B VANES MAY =D IN PLACE 3S AT EER'S DISCRETION MICRO POOL HABITAT BEHIND LARGER WOODY DEBRIS Plan View 3" TO 6" DIAMETER WOODY DEBRIS WORKED INTO RIFFLE SUBSTRATE MICRO POOL HABITAT A BEHIND LARGER WOODY DEBRIS 6" SALVAGED ONSITE COBBLE /GRAVEL BED MATERIAL Section A -A' 3" TO 6" BRUSHY MATERIAL TOP OF BANK WORKED INTO ROCKY SUBSTRATE TOE OF SLOPE i 6" SALVAGED ONSITE LOG EXPOSED 1" TO 3" ABOVE COBBLE /GRAVEL FINISHED RIFFLE ELEVATION BED MATERIAL 2 Woody Riffle b.l Not to Scale LENGTH VARIES PER PLAN B TOP OF BANK (TYP) TOE OF SLOPE (TYP) HEAD OF RIFFLE ELEVATION POINT PER PROFILE — B' Plan View CLASS 1 STONE OR SALVAGED 6" SALVAGED ONSITE ONSITE BOULDERS COBBLE/GRAVEL MIN 0.5'x1'x1.5' BED MATERIAL 3" MAX Section A -A' CLASS 1 STONE OR SALVAGED ONSITE BOULDERS MIN 05x1'x1.5' TAIL OF RIFFLE ELEVATION POINT PER PROFILE 6" SALVAGED ONSITE COBBLE /GRAVEL BED MATERIAL CLASS 1 STONE OR SALVAGED RIFFLE INVERT PER PROFILE ONSITE BOULDERS MIN 0.5'x1'x1.5' TOP OF BANK (TYP) r 3" MAX q Ch unk Rifle b.l Not to Scale Section B -B' HH � m Z - .m° aw u�z w oz Z o rn A -ammo Z �z�E �w3 LL i ,0 GO b � �dd P8N` b T c 6 U 8 J E w z C i x _ z R � ��wwe mC; w 2 oz .. a0 —v_ r-I w 3 LL i c,° u m b ,b u b Tg, c 6 U 8 ra 11 E m a v u 6" SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL FL1 OWW SILL ELEVATION PER PROFILE ADD ROOT WAD, BRUSH TOE, 12" - 15" DIAMETER LOG POOL LENGTH PER PROFILE HEADER LOG STREAMBED 10° - 15° ANGLE OR TRANSPLANTS TO LARGER BACKFILL STREAMS (DEVIL'S RACETRACK STREAMBED > NONWOVEN FOOTER LOG A' & NORTH BRANCH) AS DIRECTED BY ENGINNER POOL DEPTH PER PROFILE z a 3� p FILTER FABRIC o _ -�SILL ELEVATION O LL PER PROFILE (TYP) V w F O NONWOVEN FILTER FABRIC OR C125BN MATTING AS DIRECTED BY ENGINEER B EXTEND FILTER FABRIC FLOC / EXTEND 20'3, 5' MIN. UPSTREAM I POOL/ MNFUPSTR UPSTREAM ' /11 ' SBCtIOD A -A' & BACKFILL � 1\J Profile View —TOE OF SLOPE TYP I INVERT ELEVATION PER PROFILE } A TOP OF BANK TOP OF BANK (TYP) A' / \ FL'O= _ - TOE OF A Plan View CHANNEL BOTTOM WIDTH _ SLOPE STABILIZE VANE / HEADER LOG ONE BOULDER SCOUR ON EACH SIDE FOOTER LOG POOL Profile B - B' 7EMBEDWITH 12" - 15" DIAMETER LOG 4(MINO PER PROFILE (TYP) EXCAVATE POOL PER PROFILE Section A - X Plan View l ane LT ® Vane b.2 Ile(Il L® DIl"® Structure Not to Scale 2 6.2 Not to Scale o I I A MATTING A pF 55° TO 65° Op QE� BURY INTO BANK T MIN.(TYP) SVO BANKFULL 'tO�OF 0111 O THALWEG o F� 1�F FLOW TOP OF BANK DIAMETER P NORMAL WATER SURFACE SALVAGED ONSITE NATIVE STONE GREATER GREATER (TYP) ) pEpF ALTERNATING SOIL AND BRUSH/WOODY DEBRIS LAYERS — -,. POOL pFg 3 MIN. - -�� WIDTH PER TYPICAL 'COP Plan View (TYP) FILTER FABRIC SECTION 3' Profile View J A_A SALVAGED ONSITE BACKFILL r z z NATIVE STONE EROSION CONTROL MATTING N D] COMPACTED SOIL TOP OF BANK BANKFULL LIVE WIPS - WINTER CONSTRUCTION ONLY - I 6" ABOVE BRUSH AND WOOD DEBRIS TOE OF \ _� TOP OF BANK IN RT RIFFLE INVERT " -4% TOE OF SLOPE g 3' MIN. II (TYP) Log Section B-13' EXCAVATE TO 6" BELOW POOL DEPTH +]+ 1S NOTE: Section A -A' NOTES: 1. LOGS WITHOUT ROOT MASS MAY g' 1. OVEREXCAVATE T OUTSIDE OF TOP OF BANK (BANKFULL). BE USED ONLY IF APPROVED BY Plan View 2. INSTALL A LAVER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF THE PROJECT ENGINEER. SMALL BRANCHES AND ROOTS COLLECTED ON -SITE. LIGHTLY COMPACT BRUSHMOODY DEBRIS LAVER. 2. BOULDER MATERIAL CAN BE 3. BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS SUBSTITUTED IN PLACE OF fl�� �® �° �� gB INSTALLED POINTING SLIGHTLY UPSTREAM. ANGLED LOGS WITH APPROVAL 3 ® ®fl 1� 1L 4. INSTALL EARTH BACKFILL OVER BRUSHNJOODY LAYER ACCORDING TO OF ENGINEER. 62 Not to Scale 1 Brush Toe TYPICAL SECTION DIMENSIONS. b.2 Not to Scale 5. INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. _ z R � ��wwe mC; w 2 oz .. a0 —v_ r-I w 3 LL i c,° u m b ,b u b Tg, c 6 U 8 ra 11 E m a v u 9- m a u°° 6 z w oz z ° r-I w 3 LL i LO b r"1 �dd P� b �y c 6 U 8 E w Tg, C H A N N E L � O OS Q O Q CLASS AIB STONE FLOW \\����\ WATER DIVERSION WATER DIVERSION A A' ABANDONED �X CHANNEL A/ CHANNEL CHANNEL FILTER FABRIC NOTES: Plan View 1. FORD CROSSING SHALL BE INSTALLED PERPENDICULAR TO CHANNEL BANKS. 2. MAINTAIN DIVERSION CHANNEL TO INSURE RUNOFF DOES NOT ENTER CHANNEL. 3. CONTRACTOR SHALL DETERMINE APPROPRIATE FORD DIMENSIONS. COMPACTED SELECT EROSION CONTROL MAT MATERIAL CHANNEL BACKFILL SIDE SLOPE PER TYPICAL SECTION BOULDER TOE Ford Crossing PROTECTION \,!L3,J Not to Scale SestionA -A' Z Channel Plug 6.3 of to ca e 9- m a u°° 6 z w oz z ° r-I w 3 LL i LO b r"1 �dd P� b �y c 6 U 8 E w Tg,