HomeMy WebLinkAbout20141127 Ver 1_Mitigation Site Plans_20141023X6°2;
Pfgecl Location ; �,:
sy
Vicinity Map
Not to Scale
0
BEFORE YOU DIOI
CALL 1 -800 -832 -4949
N.C. ONE —CALL CENTER
WS THE LAW
Mud Lick Creek Mitigation Site
Cape Fear River Basin 03030003
Chatham County, North Carolina
f ®m
North Carolina Ecosystem
Enhancement Program
r�
F�COSVStem
E n �aircement
PROORAM
DRAFT PLANS
October, 2014
Stream Origins
Stream Latitude Longitude
North ]Branch N 35° 45' 53.73" W 790 25' 56.95"
East Branch N 350 48'46.31" W 790 25' 56.17"
Mud Lick Creels N 35° 45' 50.97" W 790 26'07.48"
Sheet Index
Title Sheet
Project Overview
General Dotes and Symbols
Typical Sections
Stream Plan and Profile
Planting Plan
Erosion and Sediment Control
Cross - Sections
Details
Project Directory
Surveying:
Turner Land Surveying, PLLC
P.O. Box 41023
Raleigh, NC 27629
David S. Turner, PLS
919 - 575 -1375
Engineering:
Wildlannds Engineering, Banc
]License No. ]F -0531
5605 Chapel Hill Road
Raleigh, NC 27607
Angela N. Allen, PE
919 -551 -9956
0.1
0.2
0.3
1.1 -1.3
2.1 -2.10
3.1
Not Included
5.1 -5.3
6.1 -6.3
Owner:
Ecosystem Enhancement Program
1652 Mail Service Center
Raleigh, NC 27699 -1652
Perry Sugg
919 - 707 -5976
DENR Contract No. D14001i
EEP ID No. 93452
m
N
woZ
A?ammv
tiw3 LL
b
rig
b
X
z
c 6 U
8
e
E w
m
N
M
o
aw u�z
w 2z
A?ammv
Z E
�w3 E
4�
LO
END EAST BRANCH
BEGIN NORTH BRANCH
�
REACH 1 (ENHANCEMENT II)
BEGIN EAST BRANCH
STA. 306 +23
STA. 100 +00
(RESTORATION)
�3 N
m
TO BE PURCHASED
� U
m
b
I
� CE
%
CE /
BEGIN EAST BRANCH
END NORTH BRANCH
(ENHANCEMENT II)
EASEMENT BREAK
REACH 1 (ENHANCEMENT II)
STA. 200 +00
BEGIN NORTH BRANCH /\
MUD LICK CREEK
/
REACH 1 (RESTORATION) I
BEGIN MUD LICK CREEK
STA. 103 +27 m°
REACH 1 (ENHANCEMENT II)
P�
U
STA.300 +00
STA. 312 +79.25
ADDITIONAL EASEMENT m r
c
TO BE PURCHASED A
� n
e�
END NORTH BRANCH om
ao
_ ao
��/
REACH 1 (RESTORATION)
m
ADDITIONAL EASEMENT
END MUD LICK CREEK
BEGIN NORTH BRANCH
TO BE PURCHASED
REACH 2 (RESTORATION)
J\
/19 cn
Z
\\
STA. 108 +47
/
EASEMENT BREAK
' L� 0
m
°\ NORTH BRANCH
REACH 2
a D
END NORTH BRANCH
\
om
REACH 2 (RESTORATION)
STA. 109 +32.21
-
p
STA. 111 +50
\
3J
w
- ce
ADDITIONAL EASEMENT
25
TO BE PURCHASED
STA. 312 +58.84
CE
E
1
\
C \ \ V
REACH 2 (ENHANCEMENT II)
BEGIN MUD LICK CREEK
�F
REACH 3 (ENHANCEMENT II)
15.0
END EAST BRANCH
F,
(RESTORATION)
� w
\
STA.205 +77
IEASEMENT
BREAK
END MUD LICK CREEK
REACH 1 (ENHANCEMENT II)
NORTH BRANCH
REACH 2
v
Ce J
BEGIN MUD LICK CREEK
ac 3
I STA. 109 +14.46
2 /
A
m
N
M
o
aw u�z
w 2z
A?ammv
Z E
�w3 E
4�
LO
END EAST BRANCH
REACH 2 (ENHANCEMENT II)
�
BEGIN EAST BRANCH
STA. 306 +23
ADDITIONAL EASEMENT
(RESTORATION)
m
TO BE PURCHASED
b
� CE
CE /
BEGIN EAST BRANCH
(ENHANCEMENT II)
EASEMENT BREAK
STA. 200 +00
MUD LICK CREEK
/
�
REACH 2
P�
U
STA. 312 +79.25
c
e�
ADDITIONAL EASEMENT
END MUD LICK CREEK
�9
TO BE PURCHASED
REACH 3 (RESTORATION)
Z
STA.320 +64
\
n
off'
om
-
EASEMENT BREAK
MUD LICK CREEK
w
- ce
REACH 2
Ce �_ CE
.-2-9
STA. 312 +58.84
CE
END MUD LICK CREEK
REACH 2 (ENHANCEMENT II)
BEGIN MUD LICK CREEK
�F
REACH 3 (ENHANCEMENT II)
15.0
STA. 313 +16
F,
m
N
M
o
aw u�z
w 2z
A?ammv
Z E
�w3 E
4�
LO
END EAST BRANCH
(ENHANCEMENT II)
BEGIN EAST BRANCH
(RESTORATION)
STA. 201 +68
b
BEGIN EAST BRANCH
(ENHANCEMENT II)
STA. 200 +00
�
P�
U
e�
�9
0' 80' 160' 240'
(HORIZO -)
S
u
v
6 U
8
«\ e
E w
General Notes
1. All erosion and sediment control practices shall comply with the North Carolina
Erosion and Sediment Control Planning and Design Manual where applicable.
2. Contractor will install pump- around systems to divert flow while working in live,
flowing channels. The Contractor shall operate and maintain the pump- around
system twenty four hours a day unless all disturbed areas within the
pump- around work area can be stabilized by the end of the work day. Contractor
shall not remove pump- around systems and advance to the next phase until the
current phase is completed and stabilized.
3. In areas without a pump- around system, Contractor shall disturb only as much
channel bank as can be stabilized with temporary seeding, mulch, and erosion
control matting by the end of each workday.
4. When crossing an active section of new or old steam channel, a mud mat shall
be installed according to the details.
5. All graded areas with slopes steeper than 3:1 will be stabilized within seven
days. All other areas will be stabilized within 14 days.
6. Locations for staging and stockpile areas and stream crossings have been
provided. Additional or alternative staging and /or stockpile areas and stream
crossings may be utilized by the Contractor provided that all practices comply
with the North Carolina Erosion and Sediment Control Planning and Design
Manual and are approved by Engineer prior to implementation.
7. Various types of constructed riffles are specified in this plan set per profiles,
plans, and details. Contractor will build the specific types of constructed riffles at
locations shown on the plans.
8. Contractor is to make every effort to avoid damaging or removing existing trees.
Tree protection fence will be installed as shown on plans.
9. Invasive plant species including but not limited to Chinese privet will be removed
from or treated within all areas of the conservation easement.
10. Under no circumstances will the Contractor Exceed the Limits of Disturbance
shown on the plans.
Construction Sequence
1. Contact North Carolina "ONE CALL" Center (1.800.632.4949) before any
excavation.
2. Install and maintain on -site rain gauge and log book to record rainfall amounts
and dates. Contractor is responsible for completing self- inspection forms
required by DENR permit. Permit, rainfall log, Erosion and Sediment Control
Plan, and completed inspection forms shall be maintained on site at all times.
3. Mobilize equipment and materials to the site.
4. Identify and establish construction entrance, staging and stockpile areas, haul
roads, silt fencing, tree protection fencing and stream crossings as indicated on
the plans for work areas. Note that all construction traffic will enter the site from
the two construction entrances shown on the plans at Pisgah Bridge Road and
Mack road. All haul roads shall be monitored for sediment loss on a daily basis.
In the event of sediment loss, silt fence or other acceptable sediment and
erosion control practices shall be installed.
5. Set up temporary facilities, locate equipment within staging area, and stockpile
materials needed for the initial stages of construction within stockpile area(s).
6. Perform any necessary clearing and grubbing in phases as work progresses.
Bank vegetation and vegetation immediately adjacent to live channels shall be
left undisturbed as long as possible.
7. Remove or treat invasive species within the conservation easement as described
in project specifications or as directed by engineer in the field.
8. Construction should generally progress from upstream to downstream to prevent
sediment runoff from upstream construction on completed downstream reaches.
9. In areas where a pump around is required as shown on the plans, install
impervious dikes at upstream and downstream ends of pump around locations.
The pump around operation shall be performed between these locations as
described in the plans and details. The pump around operation shall be installed
in a manner that it will be allowed to run for twenty four hours a day unless
channel within the pump around location can be stabilized within the work day.
10. Perform excavation and grading of channel and floodplain. Grade area between
upstream and downstream dike locations where pump around operations are
needed. The pump around operation shall be installed in a manner that it will be
allowed to run for twenty four hours a day unless channel within the pump
around location can be stabilized within the work day.
11. Stockpile soil in designated stockpile areas as necessary. Ensure that silt fence
is properly installed and functioning along stream side of stockpiles as shown on
Erosion and Sediment Control Plan.
12. Construct in- stream structures and install riffle features according to plans and
details.
13. Seed, mat, and mulch banks and floodplain areas according to plans and
details.
14. Once disturbed areas and exposed slopes are stabilized, remove pump around
system, if used, and progress to the next phase. Note: At certain locations, water
will be rerouted to the newly constructed channel in conjunction with removal of
pump around systems.
15. Backfill abandoned channel sections with stockpiled soil. All non - native, invasive
species shall be treated and /or removed from the old channel prior to backfilling.
16. Seed and mulch any backfill sections before proceeding to next phase.
17. Once all phases of channel and floodplain construction are complete, prepare
the floodplain for planting per the specifications.
18. Remove temporary stream crossings, stockpile areas, and erosion control
devices.
19. Apply permanent seed, mulch, and vegetation in the floodplain.
20. Ensure that the site is free of trash, debris, and any leftover construction
materials prior to demobilization.
21. Demobilize grading equipment from the site.
22. Seed, mulch and stabilize staging areas, stockpile areas, and construction
entrances.
Existing Features
Proposed
Features
- - - - - -
Existing Property Boundary
LDD
LOD
Proposed Limits of Disturbance
- Existing 1' Minor Contour
CE cE
Proposed Conservation Easement
10 +00
Existing 5' Major Contour
-
I -
Proposed Stream Alignment
x
Existing Fenceline
-
- -
Proposed Bankfull
Existing Thalweg
Proposed 5' Major Contour
n/w a/w
Existing Right of Way
Proposed 1' Minor Contour
oHE
Existing Overhead Electric Line
CR -CH
Proposed Chunky Riffle
See Detail 4, Sheet 6.1
Existing Edge of Pavement
cR'JZ
Proposed Jazz Riffle Structure
Existing Overhead Electric Pole
See Detail 3, Sheet 6.1
R_N
Proposed Native Material Constructed Riffle
Existing Concrete Structure
See Detail 1, Sheet 6.1
R -w
Proposed Woody Riffle
See Detail 2, Sheet 6.1
_
Existing Ford Crossing
Proposed Angled Log Drop
See Detail 2, Sheet 6.2
Existing Farm Road
Proposed Angled Log Step Pool
See Detail 3, Sheet 6.2
Existing Bedrock/Boulders /Outcrop
Proposed Brush Toe
See Details 1, Sheet 6.3
Proposed Log Vane
•��
0
See Detail 1, Sheet 6.2
Existing Wetlands
Proposed Permanent Ford Crossing
See Detail 1, Sheet 6.3
Existing Treeline
0
Permanent Culvert Crossing
Existing Tree
Existing Telephone Box
Designed Channel Plug
See Detail 2, Sheet 6.3
N
M
ce ' �
�mC;
aw uz
w oz .
A?ammv
Z �z1' E
tiw3 E
60
� b
b
b
e�
�yy 11
E w
b
6�A
E
590
585
580
575
300 +00
300+50
301+00
301 +50
Existing Ground
77
302 +00. 3Q2 +50
303 +00
303 +50
304 +00
590
585
580
575
304 +50 304 +70
4/
- ---- -----------
t -
J;
y
.ate _• ��VV"' �.
_ - 307 *00
L - �
r3�E CE CE CE -
CE
_ 3J 3J CE CE CE CE CE CE CE CE __ C - - - -. / 0' 2' 4' 6'
E CE CE __ CE CE CE - - - --
�� 3C
0' 20' 40' 60'
(HORIM -)
m
N
M
m o
aw u�z
w oz
Z o rn
A -ammo
�w3 LL
G�
vve bbm b
lfid
b
c 6 U
8
E w
z 3 a
k�
i=I
2
F-1
71
9
qb �
t�
590
590
585
585
580
580
Existing
Ground
575
575
304 +70 305 +00 305 +50
306 +00. 306 +50 307 +00
307 +50 308 +00
308 +50 309 +00 309 +50
I
INSTALL CHANNEL PLUG
of /
\
(TYP)
SEE DETAIL 2, SHEET 6.3
I
®
I
o / -
ADDITIONAL EASEMENT
TO BE PURCHASED / c
/
I
�� 30j*OO
l
�oC)
co
END MUD LICK CREEK /
V
REACH 1 (ENHANCEMENT II) -- -- �J1
BEGIN MUD LICK CREEK
REACH 2 (ENHANCEMENT II)
- /G
�
STA. 306 +23
O
�\
E .�...
CE CE CEO
/
\
I� CEO CE
2 4 6
U
20' 40' 60'
(HORIZONTAL)
� mb
a z
z
w oz
r-I w 3 LL
e eH
f�
eb
eb
b
u
I
i
b
fly
4 2 w
c 6 U
8 �^
E w
z 3 a
590
590
585
585
580
"
�-
580
Existing
Ground
575
575
309 +50 310 +00 310 +50 311 +00
311 +50
312 +00 312 +50 313 +00 313 +50 314 +00 314 +50
GE GE
- - --
t;E ____- -
•_ `____ , -
i
, -
END MUD LICK CREEK \
R EACH 2 (ENHANCEMENT II) m
v
- ..
BEGIN MUD LICK CREEK
REACH ( H
3 EN ANCEM313
\ - - -- _ADDITIONAL EASEMENT
TO BE PURCHASED - - - - -'
,rya
i
+
STA. 31316
1
'"
'�+n
EASEMENT BREAK
------ ______
ICREACH2
REACH2
_ _______
\
ST 3 2 +58 . 4
vv
---------------------
___ -----------------
____
-
/A /
EXI STING FO RD CROSSING/
- -- -
-----------------
_ ___ - --
U
--
�.
-
o _ _ _ - _ _
o,,-
•��
/ I i
��
_3
=_ -U
/gyp
�/
- __-
- - - --
30
__
EASEMENT BREAK v _
,. n
MUD lICK CREEK
\
K
I REACH --
--
2
STA. 312 +79.25 \ °o
/00
N A,
PROPOSED FORD CROSSING v AjV-
44/
�44/
0 LO
W
310 +00,.
U
m
w
_ - - - - --
i
i
GE
0' 20' 40' 60'
mmmmmq
(HOR —NTAL)
zG 9-
m 6
az
w oz
z 2
�Z�z�E
r� w 3 LL
d�
vvebm
lfid
�J
f�
eey
I
tc
eb
b
u
�dd
1-J
I
I
S
u
b
9
b
c 6 U /�
^
8 f j( 1
E w
z 3 a
585
tti.11
575
570
314+50
315 +00
315 +50
316 +00
316 +50
Existing G.Und
317 +00
317 +50
318 +00
3C I
_30 — 3J I 1
1 I
1 i j �3��1, 20 T
I I 1
I
I � 1
I/
I I
- 1
1 1
> *00
1 _
I 1 � I O
i
co
I /
A
318 +00
1 ,
316 +00 y �• �� - -_ �_
1 - - - - - - - - - - - --
1
1 -
1 _
- = - -
1
CE CE -- 1
------------------ E E CEO CEO CEO —CE
- - - -- CF „
CEO CEO C -
E C
` 1
585
580
575
570
318 +50 318 +60
0' 2' 4' 6'
(VERTICAL)
0' 20' 40' 60'
MMMEmq
(RORImrvT/ )
m
N
M
m o
j
w oz
Z o rn
A -ammo
Z �z�E
�w3 LL
,e°
3o��� °�
GO
b ea
ea
8
E w
z 3 a
1�
b
9
71
9
b
j
i
n
1
D_
N
Z
n
I�
70' 140' 210'
(HORIZO -)
m
N
M
m o
aw u�z
w oz
2 o rn
A
Z�z�E
�w3 LL
'0
CIO
vvebm ed
lfid
eb
P�
'if
c 6 U
8
e
E w
z `3 x
bUU
595
590
585
580
bUU
595
590
585
580
ODU bUU
595 595
590 590
585 585
580 580
OW bUU
595 595
590 590
585 585
580 580
-30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 10 20 30 40 -50 -40 -30 -20 -10 0 10 20 30
ODU bUU
595 595
590 590
585 585
580 580
bUU bUU
595 595
590 590
585 585
580 580
-40 -30 -20 -10 0 10 20 30 40 -30 -20 -10 0 10 20 30 40 50 -30 -20 -10 0 10 20 30 40 50
ODU
595
590
585
580
bUU
595
590
585
580
ODU bUU
595 595
590 590
585 585
580 580
ODU
595
590
585
580
-40 -30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 10 20 30 40 50 60
bUU
595
590
585
580
DUU bUU
595 595
590 590
585 585
580 580
ODU
595
590
585
580
-30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60
595 595 595
590 -- - - - - -- -- - - - --- , -- 590 590
585 _ 585 585
580 580 580
575 575 575
ODU DUD
595 590
590 585
585 580
580 575
bUU
595
590
585
580
DUD
590
585
580
575
-30 -20 -10 0 10 20 30 40 50
575
-50 -40 -30 -20 -10 0 10 20 30 -40 -30 -20 -10 0 10 20 30 40
Existing Ground
Proposed Grade
0' 10' 20' 30'
(HORIZONTAL)
m
N
M
y m 0
aw ,�z
w OZ
Z O Ol
A -ammo
ZI
�zE
�w3 E
L
GO
0 0 v4m2, 9
eb
�9
L�
x
C�
� o
8 F�
E w
z 3 x
000
590
585
580
595
595 590
590 585
585 580
580 575
0a0 D0D
590 590
585 585
580 580
575 575
0y0
590
585
580
575
-30 -20 -10 0 10 20 30 40 50 -40 -30 -20 -10 0 10 20 30 -30 -20 -10 0 10 20 30 40 50
595
590
585
580
575
595 595
590 590
585 585
580 580
575 575
-30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0
595
590
585
580
575
-70 -60 -50 -40 -30 -20 -10 0
590
585
580
575
-50 -40 -30 -20 -10 0
Existing Ground
Proposed Grade
595 595
590 590
585 585
580 580
-40 -30 -20 -10 0
575
10 20 30
590 590
585 585
580 580
575 575
10 20 30 40 -50 -40 -30 -20 -10 0
595
590
r ' 585
580
575
10 20 30 40 50 60
0a0
590
585
580
10 20 30 40
590 590
585 585
580 580
575 575
590
585
580
575
10 20 30 -50 -40 -30 -20 -10 0 10 20 30
0' 10' 20' 30'
(HORIZONTAL)
m
N
M
m o
aw u�z
w oz
Z o rn
A
7 z " E
�w3 LL
L
'0
L0
0 0 42, 9
e e•y
1�ab
�9
1LHH®M
x
C�
� o
8 'Tl �VI
L A
E w
z 3 x
bUU
595
590
585
580
-30 -20 -10 0
ouu
595
590
585
580
bUU bUU
595 595
590 590
585 585
580 580
10 20 30 40 50 -40 -30 -20 -10 0
ovu ouu
595 595
590 590
585 585
580 580
bUU bUU
595 595
590 590
585 585
580 580
10 20 30 40 -50 -40 -30 -20 -10 0
bUU bUU
595 595
590 590
585 585
580 580
bUU
595
590
585
580
10 20
bUU
595
590
585
580
-30 -20 -10 0 10 20 30 40 -30 -20 -10 0 10 20 30 40 50 -40 -30 -20 -10 0 10 20 30 40
600
595
590
585
580
600 600
595 595
590 590
585 585
580 580
600 600
595 595
590 590
585 585
580 580
600
595
590
585
580
-50 -40 -30 -20 -10 0 10 20 -40 -30 -20 -10 0 10 20 30 -30 -20 -10 0 10 20 30 40
595
590 _ --
585
580
-40 -30 -20 -10 0
Existing Ground
Proposed Grade
595 595
590 590
585 585
580 580
595
595
595
590
590
__-
590
585
585
585
580
580
580
10 20 30 40 -50 -40 -30 -20 -10 0 10 20 30 -40 -30 -20 -10 0 10 20 30
0' 10' 20' 30'
(HORIZONTAL)
U
eb
�9
N
M
�4�zNmo
w OZ
Z O ,m
A -anom�
ri w 3 LL
L
yo° w 4G��0�
G�
0
U
g
Lei
E w
� ; Y
HEAD OF RIFFLE ELEVATIOI
POINT PER PROFILI
Profile A -A'
SEE PROFILE
6" SALVAGED ONSITE
FLOW COBBLE /GRAVEL
BED MATERIAL
Profile View
A -A'
LOG STRUCTURE
EXPOSED UNTIL
TOP OF BANK CENTER OF CHANNEL
TOEOFSLOPE
Log Section B -B'
NOTES:
• STRUCTURES SHOULD VARY IN SIZE
AND TYPE WITHIN EACH RIFFLE.
• ROCK MAY BE SUBSTITUTED FOR
LOGS AT ENGINEER'S DISCRETION.
Plan View
B
HEAD RIFFLE
Z
g z
p�0
Fw
au
,w
w,
LL3U
� a
r
�F RIFFLE ELEVATION
PER PROFILE
6" SALVAGED ONSITE
COBBLE /GRAVEL
BED MATERIAL
RIFFLE INVERT PER PROFILE
TOP OF BANK (TYP)
Section B -B'
Constructed Riffle
b.l Not to Scale
BURY INTO BANK S MIN. (TYP)
BURY INTO BANK V MIN. (TYP)
Jazz Riffle Structure
b.l Not to Scale
X31O
w
g Z
pW0
a
U
m 2 y
W �
LL3U
CR-NM
CR-WD
CRJZ _
O �rtJ
CR -CH
O
BANKFULL
Plan View
B
VANES MAY
=D IN PLACE
3S AT
EER'S DISCRETION
MICRO POOL HABITAT
BEHIND LARGER
WOODY DEBRIS
Plan View
3" TO 6" DIAMETER WOODY DEBRIS
WORKED INTO RIFFLE SUBSTRATE MICRO POOL HABITAT
A BEHIND LARGER WOODY DEBRIS
6" SALVAGED ONSITE
COBBLE /GRAVEL
BED MATERIAL
Section A -A'
3" TO 6" BRUSHY MATERIAL
TOP OF BANK WORKED INTO ROCKY SUBSTRATE
TOE OF SLOPE
i
6" SALVAGED ONSITE LOG EXPOSED 1" TO 3" ABOVE
COBBLE /GRAVEL FINISHED RIFFLE ELEVATION
BED MATERIAL
2
Woody Riffle
b.l Not to Scale
LENGTH VARIES PER PLAN
B
TOP OF BANK (TYP)
TOE OF SLOPE (TYP)
HEAD OF RIFFLE
ELEVATION POINT
PER PROFILE
— B'
Plan View
CLASS 1 STONE
OR SALVAGED
6" SALVAGED ONSITE ONSITE BOULDERS
COBBLE/GRAVEL MIN 0.5'x1'x1.5'
BED MATERIAL
3" MAX
Section A -A'
CLASS 1 STONE
OR SALVAGED
ONSITE BOULDERS
MIN 05x1'x1.5'
TAIL OF RIFFLE
ELEVATION POINT
PER PROFILE
6" SALVAGED ONSITE
COBBLE /GRAVEL
BED MATERIAL
CLASS 1 STONE
OR SALVAGED RIFFLE INVERT PER PROFILE
ONSITE BOULDERS
MIN 0.5'x1'x1.5' TOP OF BANK (TYP)
r 3" MAX
q Ch unk Rifle
b.l Not to Scale
Section B -B'
HH �
m
Z -
.m°
aw u�z
w oz
Z o rn
A -ammo
Z �z�E
�w3 LL
i
,0
GO
b
� �dd
P8N`
b
T
c 6 U
8 J
E w
z C i x
_ z R
�
��wwe
mC;
w
2 oz
..
a0 —v_
r-I w 3 LL
i
c,°
u m
b
,b u
b
Tg,
c 6 U
8 ra 11
E m
a v u
6" SALVAGED ONSITE
COBBLE/GRAVEL
BED MATERIAL
FL1 OWW
SILL ELEVATION PER PROFILE
ADD ROOT WAD, BRUSH TOE, 12" - 15" DIAMETER LOG
POOL LENGTH PER PROFILE
HEADER LOG
STREAMBED
10° - 15° ANGLE
OR TRANSPLANTS TO LARGER BACKFILL
STREAMS (DEVIL'S RACETRACK STREAMBED
>
NONWOVEN
FOOTER LOG
A'
& NORTH BRANCH) AS
DIRECTED BY ENGINNER POOL DEPTH PER PROFILE
z a 3�
p
FILTER FABRIC o
_
-�SILL
ELEVATION
O LL
PER PROFILE (TYP)
V
w
F O
NONWOVEN FILTER FABRIC OR C125BN
MATTING AS DIRECTED BY ENGINEER
B
EXTEND FILTER FABRIC
FLOC
/
EXTEND
20'3,
5' MIN. UPSTREAM
I POOL/
MNFUPSTR UPSTREAM
'
/11 '
SBCtIOD A -A'
&
BACKFILL �
1\J Profile View
—TOE OF SLOPE TYP
I
INVERT ELEVATION
PER PROFILE
} A
TOP OF BANK
TOP OF
BANK (TYP)
A' / \
FL'O= _ -
TOE OF
A
Plan View
CHANNEL
BOTTOM WIDTH
_
SLOPE
STABILIZE VANE / HEADER LOG
ONE BOULDER
SCOUR
ON EACH SIDE FOOTER LOG
POOL
Profile B - B'
7EMBEDWITH
12" - 15" DIAMETER LOG
4(MINO PER PROFILE (TYP)
EXCAVATE POOL
PER PROFILE
Section A - X
Plan View
l
ane
LT ® Vane
b.2
Ile(Il L® DIl"® Structure
Not to Scale
2
6.2 Not to Scale
o
I I
A
MATTING
A
pF
55° TO 65°
Op
QE�
BURY INTO BANK T MIN.(TYP)
SVO
BANKFULL
'tO�OF
0111 O
THALWEG o
F� 1�F
FLOW
TOP OF BANK
DIAMETER
P
NORMAL WATER
SURFACE
SALVAGED ONSITE NATIVE STONE
GREATER
GREATER (TYP) )
pEpF
ALTERNATING SOIL
AND BRUSH/WOODY DEBRIS LAYERS
—
-,.
POOL
pFg
3 MIN.
-
-��
WIDTH
PER
TYPICAL
'COP
Plan View
(TYP)
FILTER FABRIC
SECTION
3'
Profile View
J
A_A
SALVAGED ONSITE
BACKFILL
r z
z
NATIVE STONE
EROSION CONTROL MATTING
N
D]
COMPACTED SOIL TOP OF BANK BANKFULL
LIVE WIPS - WINTER CONSTRUCTION ONLY
- I
6" ABOVE
BRUSH AND WOOD DEBRIS
TOE OF
\
_�
TOP OF BANK
IN
RT
RIFFLE INVERT
" -4%
TOE OF SLOPE
g
3' MIN.
II
(TYP)
Log Section B-13'
EXCAVATE TO 6" BELOW POOL DEPTH
+]+
1S
NOTE:
Section A -A' NOTES:
1. LOGS WITHOUT ROOT MASS MAY
g'
1. OVEREXCAVATE T OUTSIDE OF TOP OF BANK (BANKFULL).
BE USED ONLY IF APPROVED BY
Plan View
2. INSTALL A LAVER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF
THE PROJECT ENGINEER.
SMALL BRANCHES AND ROOTS COLLECTED ON -SITE. LIGHTLY COMPACT
BRUSHMOODY DEBRIS LAVER.
2. BOULDER MATERIAL CAN BE
3. BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS
SUBSTITUTED IN PLACE OF
fl�� �® �° �� gB
INSTALLED POINTING SLIGHTLY UPSTREAM.
ANGLED LOGS WITH APPROVAL
3 ® ®fl
1� 1L
4. INSTALL EARTH BACKFILL OVER BRUSHNJOODY LAYER ACCORDING TO
OF ENGINEER.
62 Not to Scale
1 Brush Toe
TYPICAL SECTION DIMENSIONS.
b.2 Not to Scale
5. INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS.
_ z R
�
��wwe
mC;
w
2 oz
..
a0 —v_
r-I w 3 LL
i
c,°
u m
b
,b u
b
Tg,
c 6 U
8 ra 11
E m
a v u
9-
m
a u°° 6
z
w oz
z °
r-I w 3 LL
i
LO
b
r"1
�dd
P�
b �y
c 6 U
8
E w
Tg,
C H A N N E L
� O
OS
Q
O
Q
CLASS AIB STONE
FLOW \\����\
WATER DIVERSION WATER DIVERSION
A A'
ABANDONED �X
CHANNEL A/
CHANNEL CHANNEL
FILTER FABRIC
NOTES:
Plan View
1. FORD CROSSING SHALL BE INSTALLED
PERPENDICULAR TO CHANNEL BANKS.
2. MAINTAIN DIVERSION CHANNEL TO
INSURE RUNOFF DOES NOT ENTER
CHANNEL.
3. CONTRACTOR SHALL DETERMINE
APPROPRIATE FORD DIMENSIONS.
COMPACTED SELECT
EROSION CONTROL MAT MATERIAL CHANNEL BACKFILL
SIDE SLOPE PER
TYPICAL SECTION
BOULDER TOE
Ford Crossing
PROTECTION
\,!L3,J Not to Scale
SestionA -A'
Z Channel Plug
6.3 of to ca e
9-
m
a u°° 6
z
w oz
z °
r-I w 3 LL
i
LO
b
r"1
�dd
P�
b �y
c 6 U
8
E w
Tg,