Loading...
HomeMy WebLinkAboutNCC215690_NOT Closeout Documents_20220930North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Watauga Project: NWG44 - Natural Surface Trail Segment River basin: New Person financially responsible: Watauga County - Joe Furman, Planning and Project #: WATAU-2022-002 Inspection Director Address: 126 Poplar Grove Connector, Suite 201, Boone, NC 28607 1. Project Location: US Highway 321, Blowing Rock Pictures: Yes - Digital 2. Weather and soil conditions: Cloudy, workable soil conditions Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Joseph Furman Inspection report: Sent Report 9. Corrective action needed: 1. Not Applicable Title: Director Date given/sent: September 14, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Please reply within thirty days if you decide to make this project active again. Reported by: Jalen Hairston Date of inspection: September 07, 2022 cc: Others present: Time arriving on site: 10:50 AM Time leaving site: 12:00 PM