HomeMy WebLinkAboutNCC215690_NOT Closeout Documents_20220930North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Watauga Project: NWG44 - Natural Surface Trail Segment River basin: New
Person financially responsible: Watauga County - Joe Furman, Planning and Project #: WATAU-2022-002
Inspection Director
Address: 126 Poplar Grove Connector, Suite 201, Boone, NC 28607
1. Project Location: US Highway 321, Blowing Rock
Pictures: Yes - Digital
2. Weather and soil conditions: Cloudy, workable soil conditions Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Joseph Furman
Inspection report: Sent Report
9. Corrective action needed:
1. Not Applicable
Title: Director
Date given/sent: September 14, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self
monitoring or self inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI
Termination.
Please note that this correspondence must be uploaded as part of completing the NOT process.
Please reply within thirty days if you decide to make this project active again.
Reported by: Jalen Hairston
Date of inspection: September 07, 2022
cc:
Others present:
Time arriving on site: 10:50 AM Time leaving site: 12:00 PM