HomeMy WebLinkAboutNCC210162_NOT Closeout Documents_20220929North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Stanly Project: PNG Rocky River HDD Pipeline River basin: Yadkin-PeeDee
Person financially responsible: Piedmont Natural Gas - Tom Morris, Project Manager Project #: STANL-2021-012
Address: 4720 Piedmont Row Drive, Charlotte, NC 28210
1. Project Location: Gannon Mill Road, Midland
Pictures: No
2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Wade Holifield
Inspection report: Sent Report
9. Corrective action needed:
Title: Project Manager
Date given/sent: September 22, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT) unless permit approval date was prior to April 1st 2019.
The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note
that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Jeffrey Chandler Others present:
Date of inspection: September 21, 2022 Time arriving on site: 3:30 PM Time leaving site: 4:00 PM