HomeMy WebLinkAboutNCC223359_Site Plan or Location Map_20220930M SITE ^ Yorkrid9 e Apartments 13015 Yorkridge Drive Charlotte, NC 28273 VICINITY MAP a PID: 201-401-05 & 201-401-42 GENERAL NOTES: 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL (CLDSM) AND THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE SPECIFIED IN THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. 2. ALL PUBLIC STREETS WITHIN THE DEVELOPMENT WILL BE CONSTRUCTED TO THE CITY OF CHARLOTTE STANDARDS IN ORDER TO BE DEDICATED PUBLIC RIGHT OF WAYS. 3. ALL CURBS SHALL HAVE A 5-0" RADIUS AT THE FACE OF CURB UNLESS OTHERWISE NOTED. ALL R/W SHALL HAVE A 20' RADIUS UNLESS OTHERWISE NOTED. 4. DEVELOPER WILL PROVIDE STREET SIGNS PER CLDSM #50.05A OR #50.05B. SIGNS SHOULD BE LOCATED PER CLDSM #50.06. 5. LAND DEVELOPMENT ENGINEER SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO CONSTRUCTION. 6. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. FURTHER REQUIREMENTS MAY BE MADE BY THE CITY OF CHARLOTTE DEPARTMENT OF TRANSPORTATION (CDOT). 7. NON-STANDARD ITEMS (I.E.: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT OF WAY REQUIRE ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL ENCROACHMENT AGREEMENTS. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT CDOT AT (704) 336-3888. 8. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3600 P.S.I. AT 28 DAYS AND SHALL COMPLY WITH SECTION 1000 OF THE NCDOT STANDARD SPECIFICATIONS. SIDEWALKS SHALL BE CONSTRUCTED OF NOT LESS THAN 3600 PSI CONCRETE AND SHALL BE FOUR (4) INCHES THICK, CONSTRUCTED ON AN ADEQUATELY GRADED BASE, EXCEPT WHERE A SIDEWALK CROSSES A DRIVEWAY IT SHALL BE SIX (6) INCHES THICK. 9. ALL CONCRETE SHALL BE CURED WITH 100% RESIN BASE, WHITE PIGMENTED CURING COMPOUND WHICH MEETS A.S.T.M. SPECIFICATIONS C-309, TYPE 1, APPLIED AT ONE GALLON TO 400 SF WITHIN 24 HOURS OF PLACEMENT OF CONCRETE. 10. ALL CURB AND GUTTER SHALL BE BACKFILLED WITH SOIL APPROVED BY THE INSPECTOR 48 HOURS AFTER CONSTRUCTION TO PREVENT EROSION. 11. ALL BACKFILL SHALL BE NON -PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL, OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND THE MATERIAL SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 12. ALL TRENCHES IN THE STREET RIGHT OF WAY SHALL BE BACKFILLED WITH SUITABLE MATERIAL IMMEDIATELY AFTER THE PIPE IS LAID. 13. ALL SUBGRADE FOR ROADS SHALL BE COMPACTED TO 100% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER TEST. 14. ALL TESTS SHALL BE PERFORMED BY THE DEVELOPER AT NO COST TO THE CITY. 15. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR SHALL PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAGMEN TO DIRECT TRAFFIC IN ACCORDANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H.). 16. SUBGRADE FOR SIDEWALKS SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER TEST. THE SURFACE OF THE SIDEWALK SHALL BE STEEL TROWEL AND LIGHT BROOM FINISHED AND CURED WITH AN ACCEPTABLE CURING COMPOUND. TOOLED JOINTS SHALL BE PROVIDED AT AN INTERVAL NOT LESS THAN FIVE (5) FEET AND EXPANSION JOINTS AT INTERVALS NOT MORE THAN 45 FEET. THE SIDEWALK SHALL HAVE A LATERAL SLOPE OF 1 /4" PER FOOT. 17. THE ELEVATION OF THE SIDEWALK SHALL BE RELATED TO THE ELEVATION OF THE CROWN OF THE ADJACENT ROADWAY. THE SIDEWALK SHALL BE NO LESS THAN SIX (6) INCHES OR MORE THAN 18 INCHES ABOVE THE ROADWAY CROWN, EXCEPT THAT THE CROSSWALK ELEVATIONS SHALL BE PROPERLY RELATED TO THE EXISTING OR PROPOSED ROADWAY CURB. 18. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR BASED ON FIELD CONDITIONS. 19. UTILITY INSTALLATIONS MAY ONLY CROSS BUFFER AREAS AT INTERIOR ANGLES MEASURED AT PROPERTY LINES WHICH ARE NOT LESS THAN 75 DEGREES AND, TO THE EXTENT POSSIBLE, PATHS CLEARED FOR SUCH UTILITY LINES SHALL BE REPLANTED WITH PLANT MATERIALS FROM THE ORDINANCES APPROVED PLANT LIST. 20. NO BUILDINGS, PARKING SPACES OR MANEUVERING AREAS MAY BE LOCATED WITHIN ANY BUFFER AREAS. 21. THE DEVELOPER SHALL MAKE A DILIGENT EFFORT TO PRESERVE AREAS OF REQUIRED BUFFERS WHERE SIGNIFICANT VEGETATION EXISTS. THESE AREAS SHALL REMAIN UNDISTURBED EXCEPT TO THE EXTENT NECESSARY TO ACCOMMODATE THE ABOVE ITEMS OF THIS SECTION. 22. UNDER DRAINAGE SHALL BE PROVIDED AS DIRECTED BY GEO-TECHNICAL ENGINEER. DETERMINATION SHALL BE MADE IN THE FIELD. DRAINS TO BE INSTALLED PER CMLD STD #30.05. 23. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 24. "AS -BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY/COUNTY SUBDIVISION ORDINANCE. 25. CURB AND GUTTER ON THE PLANS MAY BE ADJUSTED BASED ON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. 26. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SIDE) IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND/OR OBSTRUCTION TO STORM WATER FLOW IS PROHIBITED. 27. HIGH -DENSITY POLYETHYLENE (HDPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT-OF-WAY MUST BE APPROVED BY THE CITY'S INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT-OF-WAY. 28. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 29. ALL DEVELOPMENT CREATING A TOTAL 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL REQUIRE STORM DRAINAGE DETENTION. 30. NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT KRYSTAL BRIGHT AT 704-336-3888 OR KRYSTAL.BRIGHT@CHARLOTTENC.GOV. 31. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT AND WILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT ERIC WEIDEMANN AT (980)722-5463 OR ERIC.WEIDEMANNOCHARLOTTENC.GOV AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS. CONTRACTOR SHALL CONTACT CASEY MASHBURN AT (704) 336-8348 OR CASEY.MASHBURN@CHARLOTTENC.GOV AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 32. THE DEVELOPER SHALL CONTACT THE IMPLEMENTATION SECTION MANAGER OF THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (CDOT) OR THEIR DESIGNEE AT 704-336-4119 TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60- 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 33. PEDESTRIAN -SCALE LIGHTING AND/OR STREET LIGHTING SHALL NOT BE INSTALLED WITHIN THE RIGHT-OF-WAY WITHOUT REVIEW AND APPROVAL OF CDOT. DEVELOPER TO CONTACT CANDACE INGE (704-336-3932 OR CAN DACE.INGE@CHARLOTTENC.GOV) FOR LOCAL STREET LIGHTING CRITERIA WITH RESIDENTIAL SUBDIVISION PROJECTS AND TO CONTACT ANTHONY MENDEZ (704-962-7173 OR ANTHONY.MENDEZOCHARLOTTENC.GOV) FOR ALL OTHER PROJECTS LIGHTING REQUIREMENTS. COORDINATE WITH DUKE ENERGY AND CDOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. 34. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION - FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, CDOT ROW UTILITY COORDINATOR AT 704-336-4248 OR RTRUITTOCHARLOTTENC.GOV. 35. A JOINT USE MANHOLE (MEET -ME MANHOLE) IS TO BE PROVIDED BY THE DEVELOPER TO ACCOMMODATE ALL UTILITY TELECOM SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BE LOCATED ON PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT-OF-WAY. NOW OR FORMERLY GLENN 0. LITAKER DB 21765 PG 917 PID # 20120107 ZONED: l-7 USE: DAY CARE CENTER LOT 5&6 NOW OR FORMERLY PRICE ROAD COMMERCIAL PARK JAMES EARL TERRY, SR. DB 10856 PG 108 PID J 20120106 ZONED: l- I (CD) USE: INDUSTRIAL LOT 5 NOW OR FORMERLY CHRISTOPHER POINDEXTER JAOUELINE SMALL THE CAROLINA SOUTH SHORE REVOKABLE TRUST DB 37404 PG 199 PID # 20720705 ZONED: l-I(CD) USE: INDUSTRIAL T_ J 7- ROJEOROUGH PHAS MAP SITES 24, 25, , COMMON ELEMEN MB 29 PG 267 PID # 20120298 ZONED: R-9MF (C USE: MULTI-FAMIL LOT 4 NOW OR FORMERLY MECKLENBURG PAINT COMPANY, INC DB 8332 PG 680 PID # 20120139 ZONED: l-1 USE: INDUSTRIAL NOW OR FORMERLY AGM STONE POINT, LLC CIO MCDOWELL PROPERTIES PID J 20140101 ZONED: R-17MF _ _ U 7771=mIL� V \ NOW OR FORMERLY \ LOT 7 YORK ROAD DEVELOPMENT PMT PARTNERS V, LLC DB 73008 PG 547 MB 22 PG 665 MB 23 PG 585 PID J 104 ZONED: B' (CD) j .. USE: COMMERCIAL \ LOT 2A \ PID: 201-401-42 7 \ 7 \ _ \ NOW OR FORMERLY LOT 7 YORK ROAD DEVELOPMENT PMT PARTNERS C 13008PG 547 DB / MB 22 PG 665 MB 23 PG 585 PID J 0104 .• ZONED. BBS(CD) USE: COMMERCIAL MOSS ROAD SR #1122 PUBLIC R/W VARIES CDOT MAINTAINED 30 MPH SPEED LIMIT CONTACT INFORMATION OWNER: WE YORK RIDGE SPE OWNER, LLC CONTACT: JEFFEREY WEISKOPF ADDRESS: 12 COLLEGE ROAD MONSEY, NY 10952 PHONE: 845-369-8793 CIVIL ENGINEER & LANDSCAPE ARCHITECT: URBAN DESIGN PARTNERS PLLC CONTACT: BRIAN D. SMITH, PE ADDRESS: 1213 WEST MOREHEAD ST. SUITE 450 CHARLOTTE, NC 28205 PHONE: 704-334-3303 ARCHITECT: ROLAND ARCHITECTURE CONTACT: JOHN ABISCH PHONE: 585-233-1587 SHEET INDEX Sheet Number C-1.0 C-1.1 C-2.0 C-2.1 C-2.2 C-3.0 C-3.1 C-3.2 C-3.3 C-4.0 C-4.1 C-4.2 C-5.0 C-5.1 C-5.2 C-5.3 C-5.4 C-5.5 C-5.6 C-6.0 C-6.1 C-6.2 C-6.3 C-6.4 C-7.0 C-7.1 C-7.2 C-8.0 C-8.1 C-8.2 C-8.3 C-8.4 C-8.5 C-9.0 LS-1.0 LS-1.1 LS-1.2 LS-2.0 Sheet Title Cover Sheet Submittal Table Existing Conditions Existing Conditions (Removed) Demolition Plan Overall Site Plan Site Plan A Site Plan B Open Space Plan Overall Grading Plan Grading Plan A Grading Plan B Overall Storm Drainage Plan Storm Drainage Plan A Storm Drainage Plan B BMP Plan & Details BMP Details Storm Drainage Area Plan BMP Drainage Area Plan Overall Utility Plan Utility Plan A Utility Plan B Sanitary Sewer Profiles Sanitary Sewer Profiles Erosion Control - Phase 1 Erosion Control - Phase 2 Erosion Control - Phase 3 Site Specifications & Details Site Specifications & Details Site Specifications & Details Site Specifications & Details Erosion Control Details Erosion Control Details Turning Movement Overall Landscape Plan Landscape Plan A Landscape Plan B Landscape Details GRAPHIC SCALE 100 0 50 100 200 INCH = 100 FEET U R B A N DESIGN PARTNERS 1213 w morehead st ste 450 charlotte, nc 28208 P 704.334.3303 u rbandesi gn partners. com nc firm no: P-0418 sc coa no: C-03044 cz Q GOW 09/14/2022 N L0 W O 0 T z O N U � N GG0 T C CO I` N 00 N z 0 Cz 00 O O CO T N � � Q QQ m m m LU C\J CO Q �w z Q z LU z LU w p} LU m �o�000 0 a 0 w w} o Q m 0 a 0 w w o Q a 0 w w o Q LU U v o N N N N N N LLI N N N N N N M r- r Q r O r N lye r 0 Sri co co r- C0 rn 000000 z 0 0 0 0 0 0 Project No: 21-CLT-103 Date: 02.25.2022 Designed By: UDP Checked By: BDS Sheet No: C-1 00