HomeMy WebLinkAboutNCC223414_ESC Approval Submitted_20220930ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
June 15, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Mills River Self Storage, LLC
Attn: Mr. John Sikorski
108 Angeline Rd.
Mills River, NC 28759
RE: Project Name: MILLS RIVER STORAGE
Acres Approved: 4.6
Project ID: HENDE-2022-015
County: Henderson
City: Mills River
Address: Boylston Hwy.
River Basin: French Broad
Stream Classification: UT to Boylston Creek - Class C
Submitted By: Cape Fear Engineering - Mr. Michael House, P.E.
Date Received by LQS: May 16, 2022
Plan Type: Commercial
Dear Mr. Sikorski,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at
Dom,, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
�JJ/n Asheville Regional Office 1 2090 U.S. Highway 70 1 5wannanoa, North Carolina 28776
nar,mcea ! P
Ds+b..ffl 01 f vk —.bd uw�r, r 828.296.450o
Letter of Approval with Modifications
Mills River Self Storage, LLC
Attn: Mr. John Sikorski
Date: June 15, 2022
Page 2 of 5
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in to future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Fred Walker, P.E.
Engineer III
Division of Energy, Mineral, and Land Resources
Letter of Approval with Modifications
Mills River Self Storage, LLC
Attn: Mr. John Sikorski
Date: June 15, 2022
Page 3 of 5
Enclosures: Certificate of Coverage
NPDES NCG01 Fact Sheet
Modifications
ec: Ms. Shawna Riddle- NCDEQ LQS [shawna.riddle@ncdenr.gov)
Mr. Landon Davidson, P.G. - NCDEQ DWR (landon.davidson(ftcdennguov)
Mr. Andrew Moore, P.G. - NCDEQ DWR [and rew.w.moore ncdenr. ov)
cc: Regional Office file
Letter of Approval with Modifications
Mills Inver Self Storage, LLC
Attn: Mr. John Sikorski
Date: June 15, 2022
Page 4 of 5
MODI)F'ICATIONS REQUIRED FOR APPROVAL
Project Name: MILLS RIVER STORAGE
Project ID: HENDE-2022-015
County: Henderson
For final approval submit the required documents to the Asheville Regional Office Land
Quality Section, Construction activities cannot begin until final approval is received from
this office.
1. Provide revised original notarized Financial Responsibility/Ownership Form so that
the information in Part B.1 exactly matches the information on file with the N.C.
Secretary of State. If Parts A,9 and B.1 do not exactly match, provide written
landowner consent to the Financially Responsible Party to conduct land disturbing
activities associated with this plan. Revise latitude and Iongitude in Section A.2,
coordinates provided are not the site's coordinates. {G.S. 113A-54.1.(a)}
2. Revise construction sequence to include the following language: notify NCDEQ LQS
inspector 48 hrs. before project starts, no major grading activities or basin
construction are to take place during wet weather or periods of predicted wet
weather i.e. Hurricanes, notify NCDEQ LQS inspector when project is ready for a
close out inspection, file for NPDES NCGO10000 e-Notice of Termination when final
close out inspection report is received from NCDEQ LQS, specify the order that the
traps and basins and their collection systems be installed in before any other grading
takes place on site, prior to construction of the sediment basin, silt fence shall be
installed below the toe of the proposed embankment of the sediment basin to
prevent sedimentation damage during sediment trap construction, sediment basin
embankments shall be provided with adequate groundcover immediately upon
construction, construct SW system from point A to point B while installing inlet
protection as soon as each inlet is constructed, inspect and cleanout SW system
before bringing online, specify when F&SC measures are to be converted into post -
construction SW BMP's Le, sediment basin converted to retention pond — requires
separate individual sequence for conversion, site must be "storm ready" before any
extended breaks in construction activities including weekends. {15A NCAC
04B .0106(a)(3))
3. Provide Iegend on E&SC sheets fG.S. 113A-57.(3))
4. If discharging onto slope 5% or greater increase stone apron length and width and
potentially stone size to account for discharge onto grade. {15A NCAC 04B.01081
S. Remove S. Lespedeza from seeding list fG.S. 113A-57.(3)1
6. Provide stabilized inlets into sediment basin floors. {G.S. 113A-57.(3))
7. Provide construction detail for stabilization matting, specific maintenance
instructions for each E&SC measures, and horizontal dimensions for inlet protection
detail. f G.S. 113A-57.(3))
Letter of Approval with Modifications
Mills River Self Storage, LLC
Attn: Mr. John Sikorski
Date: June 15, 2022
Page 5 of 5
8. Note on plan that any barrow or waste must come from or go to a permitted site and
or facility. Note on plan the waste and or fiIi site permit number. {15A NCAC
04B .0110}
9. Obtain post -construction stormwater permit & DOT encroachment approvals. {G.S.
113A-57.(4))
10. Retaining wall design must be approved by local building authority and designed by
geotechnical engineer or professional of equivalent expertise. {G.S. 113A-57,(4))
Ref. G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NEDES for Construction Activities