Loading...
HomeMy WebLinkAboutNCG020992_NOV-2022-PC-0556_20220923ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quatity September 23, 2022 CERTIFIED MAIL # 7022 0410 0002 1249 4318 Buechel Stone Corporation Attn: Chris Bucy 7274 Hwy 221 N Marion, NC 28752 Subject: NOTICE OF VIOLATION NOV-2022-PC-0556 Permit No. NCG020992 Steel Gray Mine Mitchell County Dear Mr. Bucy: On September 21, 2022, staff of the Asheville Regional Office conducted a compliance inspection of the subject mine. A copy of the inspection report is enclosed for your review. The site inspection was due to a complaint of muddy water being discharged into the North Toe River. DEMLR records indicate that the subject mine is covered under NPDES Stormwater General Permit NCG020000 by Certificate of Coverage (COC) NCG020992. Permit coverage authorizes the discharge of stormwater only to receiving waters designated as North Toe River, class C;Tr, a waterbody in the French Broad River Basin. Accordingly, the following permit condition violations were noted during the inspections and file review: 1. Failure to notify the Division that mining activities discharge activities had changed after the issuance of the COC. (Part A, NCG020000 Permit Coverage). Failure to report incorrect information on the Notice of Intent (NOI) application. COC issued if for stormwater discharge only. (Part K, Requirement to Report Incorrect Information). Required Response If oft_E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 o.amtima�a�mae� 828.296.4500 Notice of Violation Steel Gray Mine NCG020992 September 23, 2022 Page 2 of 2 Accordingly, you are directed to respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and include the following: 1. Cease all mining activity. 2. Install all traps as shown on the approved mine map. 3. Maintain trap T-IA. 4. Submit a modification to the NCG02 Notice of Intent to include dewatering of wastewater. 5. Modify the Certificate of Coverage (COC) for wastewater discharge. 6. Submit updated maps with additional outfall shown. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral, and Land Resources regarding these issues and any future/continued violations that may be encountered. This office requires that the violations, as detailed above, be abated immediately and properly resolved. Environmentaldamage and/or failure to secure proper authorizations have been documented on the subject tract as stated above. Your efforts to undertake activities to bring the subject site back into compliance is not an admission, rather it is an action that must be taken in order to begin to resolve ongoing environmental issues. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. Your above -mentioned response to this correspondence, the degree and extent of harm to the environment and the duration and gravity of the violation(s) will be considered in any civil penalty assessment process that may occur. Should you have any questions regarding these matters, please contact Shawna Riddle or me at 828-296-4500. Sincerely, Stanl E. Aik , l cst, Regional Engineer Asheville Regional Office ec: William E. Vinson, PE, Chief of Program Operations and NCORR Liaison (toby.vinson@ncdenr aov) Albert B. Cole, PE, Albert B. Cole, PE, Section Chief of Regional Operations (brad.cole@ncdenr.gov) Bethany Georgoulias, Environmental Engineer (bethany.geor oulias ncdenr.gov) Compliance Inspection Report Permit: NCG020992 Effective: 05/10/22 Expiration: 06/30/25 Owner: Buechel Stone Corporation SOC: Effective: Expiration: Facility: Steel Gray Mine County: Mitchell - Allapass Hwy Region: Asheville Spruce Pine NC 28777 Contact Person: Chris Bucy Title: Phone:828-756-8220 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/21/2022 Primary Inspector: Shawna Riddle Secondary Inspector(s): Certification: Phone: Entry Time 10:30AM Exit Time: 12:OOPM Phone: 919-302-5311 Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020992 Owner - Facility: Buechel Stone Corporation Inspection Date: 09/21/2022 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Inspection due to a complaint of muddy water being discharged into the North Toe River. Met with Chris Bucy for the inspection. Mine was not in operation during the inspection. T-1A trap has an outfall that is not approved to discharge to the river. Site has one approved outfall 001. Trap T-1A needs to be maintained. All traps need to be installed as shown on the approved plan. COC needs to be modified for waste water discharge, submit updated maps including additional outfall, NCG02 Notice of Intent needs to be modified to include dewatering of waste water. Page 2 of 3 Permit: NCG020992 Owner -Facility: Buechel Stone Corporation Inspection Date: 09/21/2022 Inspection Type :Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ E ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ 0 ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ E # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Unpermitted outfall at T1-A trap. Page 3 of 3