Loading...
HomeMy WebLinkAboutNCS000557_NOD_20220930ROY COOPER Governor ELIZABETH S. BISER Secretory BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 30, 2022 CERTIFIED MAIL 7017 2680 0000 2237 2478 RETURN RECEIPT REQUESTED Town of Zebulon Attn: Joeseph Moore, Town Manager 450 E Horton Street Zebulon, NC 27597 Subject: NOTICE OF DEFICIENCY (NOD-2022-PC-0146) Town of Zebulon NPDES MS4 Permit No. NCS000557 Wake County Dear Mr. Moore: On August 18, 2022, staff from the North Carolina Department of Environmental Quality (DEQ) conducted a compliance audit of subject National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit. The audit identified minor deficiencies with the specific components of the MS4 permit that were reviewed, as provided in the attached DEQ MS4 Permit Compliance Audit Report. This report lists and describes the deficiencies with certain components of the MS4 permit, which constitutes a violation of the Clean Water Act and is grounds for enforcement action. In accordance with Part VI of the permit and DEQ policy, a new 5-year MS4 permit will be issued in response to the audit. As such, the permittee is required to complete the following actions: I . Respond in writing within thirty (30) calendar days from the date of receipt of this notice to acknowledge these requirements and the intent to comply. 2. Self -evaluate the permit components that were not reviewed by DEQ for compliance and submit the results within one hundred twenty (120) calendar days from the date of receipt of this letter. The Part Il of the MS4 Phase II Audit Template on the DEQ stormwater web site can be used for this purpose. The specific sections that should be self -audited include: a. Section C, Public Involvement and Participation; b. Section E: Construction Site Runoff Controls; c. Section F: Post -Construction Site Runoff Controls; and d. Section H: Total Maximum Daily Loads 3. Develop a Stormwater Management Plan (SWMP) which details specific actions, measurable goals, and implementation timelines for the stor nwater management program over the new 5- year permit term. The SWMP must be documented utilizing the DEQ Phase II MS4 SWMP Template. The permittee shall submit the SWMP to DEQ for review and comment within one hundred twenty (120) calendar days from the date of receipt of this letter. \ort 11 ca; ohlld 0epar'Ia lent of Lnvirol ntivnt l Quality I Diviilo31 of Vncr gy, Liltwt-a; and La nd Re sou ices D,�_,--^EQ';R.deiylt RegronoI Of Iice Ii,28 Mail Set vice Center 13NOO Rarrett [ 1 kv I Raleiy11.1m tIt Carol€na 27601) 6:w:e+.wrre.++ro..�nraKr1 �it4191 •1200 Notice of Deficiency Joeseph Moore, Town Manager September 30, 2022 Enclosures: DEQ MS4 Program Audit Report {August 18, 2022, Town of Zebulon} CC: Joe Moore, jmoore@townofzebulon.or , DEMLR Stormwater Program Supervisor Isaiah.Reed@ncdenr.gov, DEMLR Interim MS4 Program Coordinator DEMLR NPDES MS4 Permit Laserfiche File