Loading...
HomeMy WebLinkAboutNCS000557_Audit Report_20220930MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PROGRAM AUDIT REPORT NPDES PERMIT NO. NCS000557 Zebulon, NORTH CAROLINA Zebulon, NORTH CAROLINA 450 E Horton Street Zebulon, NC 27597 Audit Date: August 18, 2022 Report Date: September 30, 2022 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 9th floor 1612 Mail Service Center Raleigh, NC 27699-1612 TABLE Of CONTENTS AuditDetails ........... .. ..................... .......................................................................................................... t PermitteeInforrnation.................................................................................................................................. 2 Listof Supporting Documents...................................................................................................................... 3 ProgramImplementation,Documentation & Assessment..........................................................................4 PublicEducation and Outreach.................................................................................................................... 8 Illicit Discharge Detection and EIimination (IDDE)..................................................................................... 11 Pollution Prevention and Good Housekeeping for Municipal Operations ................................................. 14 Site Visit Eva luatIon. Municipal Facility No. 1 ............................................................................... . .... 1$ Site Visit Evaluation. MS4 OutfalI No, I ...................... ................... .............. ........ .............. ...................... 20 Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1........................................... 22 Appendix A. Supporting Documents Appendix 8- Photograph Log DISCLAIMER This audit consists of an evaluation of program compliance with the issued permit and implementation of the approved Stormwater Management Plan. This audit report does not include a review of all program components, and program deficiencies in addition to those noted may be present. The permittee is required to assess program progress and permit compliance, and to implement the approved Stormwater Management Plan in accordance with the issued permit. NCS000557 Zebulon MS4 Audit 20220930 Si Audit Details Audit ID Number: Audit Dates): NCS000557 Zebulon MS4 Audit_20220930 August 18, 2022 Minimum Control Measures Evaluated: ® Program Implementation, Documentation & Assessment ® Public Education & Outreach ❑ Public Involvement & Participation ® Illicit Discharge Detection & Elimination ❑ Construction Site Runoff Controls — No delegated Sediment and Erosion Control Program ❑ Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program ❑ Post -Construction Site Runoff Controls ® Pollution Prevention and Good Housekeeping for Municipal Operations ❑ Total Maximum Daily Loads (TMDLs) Field Site Visits: ® Municipal Facilities. Number visited: 1 ® MS4 Outfalls. Number visited: 1 ❑ Construction Sites. Number visited: Choose an item. ® Post -Construction Stormwater Runoff Controls. Number visited: 1 ❑ Other: Number visited: Choose an item. ❑ Other: Number visited: Choose an item. Inspector(s) Conducting Audit Name. Title Organization Thad Valentine DEQ DEMLR Land Quality Section Lauren Garcia DEQ DEMLR Land Quality Section Audit Report Author: Date: Signature Audit Report Author: Date Signature NCS000557_Zebulon MS4 Audit_20220930 Page 1 of 25 List of Supporting Documents Item Number Document Title When Provided (Prior to/During/After) 1 SWMP 2 Stormwater Program PowerPoint 3 Wake County Agreement 4 CWEP Agreement 5 BMP and Measurable Goal Tables 6 IDDE Inspection Example 7 5CM Inspection Example 8 Public Education Ad 9 Brochure Example 10 Public Works SWPPP 11 SPCC Plan 12 Evaluation of Town Owned Properties 13 Pesticide Licenses 14 PP&GH Training Sheet from Safety Meetings NCS000557 Zebulon MS4 Audit 20220930 Page 3 of 25 Program Implementation, Documentation & Assessment II.A.3 Keeping the The permittee kept the Stormwater Plan up to date. Yes 1 Stormwater Plan Up to Date The permittee notified DEMLR of any updates to the Stormwater Plan. Not Applicable Comments {indicate the date of latest Stormwater Alan and describe the nature of any updates, if applicable). The SWMP shows the latest revision was June 2022. There have been no major updates to the SWMP. II.A.4 Availability The permittee kept an up-to-date version of its Stormwater Plan available to the of the Stormwater Division and the public online. No --- Plan The online materials included ordinances, or other regulatory mechanisms, or a list identifying the ordinances, or other regulatory mechanisms, providing the legal Yes Online authority necessary to implement and enforce the requirements of the permit. Comments (Note what materials are available on line) A copy of the SWMP is not available on the webpage. Ordinances are available online but are not linked on the webpage: https://www.townofzebulon.org/departments/pIanning/documents. II.A.3 & II.A.5 Stormwater Plan Did DEMLR require a modification to the Stormwater Plan? No --- Modifications If yes, did the permittee complete the modifications in accordance with the Not established deadline? Applicable Comments (Note date of DEMLR notification, modifications required, and date modifications were completed, as applicable) DEMLR did not require a modification to the SWMP. II.A.6 Sharing Responsibility Are any control measures implemented by an entity other than the permittee? Yes 3,4 If yes, is there a written agreement in place? Partial 3,4 Comments (List the specific control measures implemented by others that do not have adequate written agreements, if applicable) Wake County implements construction stormwater and post -construction stormwater for the Town. The Town also has an agreement with CWEP for public education and outreach and public involvement and participation. An interlocal agreement is needed to address post -construction stormwater between Wake County. II.A.7 The permittee maintained written procedures for implementing the six minimum Written control measures. Yes 1 ' 5 Procedures Written procedures identified specific action steps, schedules, resources and responsibilities for implementing the six minimum measures. Yes 1, 5 Comments Gist the specific minimum measures that do not have adequate written procedures, if applicable) Written procedures for each minimum control measure are included in the SWMP on pages 5-19. The Town also maintains BMP and Measurable Goal Tables for each measure. NCS000557_Zebulon MS4 Audit_20220930 Page 5 of 25 Program Implementation, Documentation & Assessment 4. Fiscal analysis. *Qs Comments (Note dates that annual reports cover under current permit and generally describe report deficiencies, if any) The Town submits annual reports through BIM5. Additional Comments: NCS000557 Zebulon MS4 Audit. 20220930 Page 7 of 25 Public Education and Outreach II.B.2.d Residential The permittee described issues, such as pollutants, the likely sources of those and Industrial/ pollutants, potential impacts, and the physical attributes of stormwater runoff in } Commercial Issues their education/outreach program. Comments (Generally describe the residential/industrial/commercial issues addressed) The outreach program is included in Section 7.1.4 of the 5WMP. 11.6.2.e The permittee promoted and maintained an internet web site designed to convey the Informational program's message. Partial Web Site Comments (list web page address and general contents, or attach screen shot of landing page) The Town does not have a webpage dedicated to stormwater, but they do use the CWEP website and facebook posts to communicate with residents. II.B.2.f The permittee distributed stormwater educational material to appropriate target Public Education Yes 8 Materials groups. Comments (list distributed materials and quantity, message, distribution mechanism, target audience for each if not included in program documentation/annual reporting) During the audit, the Town displayed their stormwater booth with merchandise that is set up at community events. Brochures are sent to residential houses. Water bill inserts with stormwater information are also mailed to residents. II.B.2.tt The permittee promoted and maintained a stormwater hotline/helpline for the Hotline/Help Line purpose of public education and outreach. Partial Online Comments (Note hotline contact information and methods) for advertising it) The Town does not currently have a dedicated hotline for stormwater issues. Complaints are submitted to Public Works. The Public Works phone number is promoted and there is a webpage that is dedicated to reporting issues, including stormwater: https://www.townofzebulon.org/report-problem. NCS000557_Zebulon MS4 Audit_20220930 Page 9 of 25 Illicit Discharge Detection and Elimination (IDDE) Staff Interviewed: Mary Duffy, Contracts/Admin Manager —Town of Zebulon (Name, Title, Chris Ray, Director of Public Works —Town of Zebulon Role) Betsy Pearce, Post -construction Stormwater— Wake County Carrie Mitchell, Environmental Engineer —Wake County Permit Citation Program Requirement Status Supporting Doc No. II. D.2.a IDDE Program The permittee maintained a written IDDE Program. Yes 1 If yes, the written program includes provisions for program assessment and Yes 1 evaluation and integrating program. Comments (Note any deficiencies) IDDE is included in Section 7.3 of the SWMP. Evaluation of the Program is addressed in Section 7.3.9. The permittee maintained an IDDE ordinance or other regulatory mechanism(s) that Yes Online II.D.2.b provides the legal authority to prohibit illicit connections and discharges to the MS4. Legal Authorities if yes, the ordinance applies throughout the corporate limits of the permittee. (Permit Part I. DI Yes Online Comments The IDDE Ordinance is included in Section 151.65 of the UDO: https:Hcodelibrary.amlega1.com/codes/zebulon/latest/zebuIon_nc/0- 0-0-7923. Authority is included in Section 151.02. II.D.2.c The permittee maintained a current map showing major outfalls* and receiving Storm Sewer Yes --- System Map streams. Comments All pipes and outfalls are mapped. The Town provided a binder that contains all stormwater mapping for Zebulon. *Major outfalls are discharges from > 36" diameter pipes or drainage areas of > So acres. In areas zoned for industrial activity, major outfalls are > 12" or drainage area > 2 acres. II.D.2.d The permittee maintained a program for conducting dry weather flow field Dry Weather Flow observations in accordance with written procedures. Partial i Program Comments (Generally summarize program, including frequency of observations and # or % of outfalls screened) Dry weather field screening is included in two paragraphs of the SWMP as a part of Section 7.3.5 of the SWMP. It states dry weather field screening will be conducted as needed. Written procedures for finding the source of illicit discharges and removing /correcting illicit discharge connections are included in the IDDE section of the SWPPP. The Town's goal is to conduct inspections at atleast 10% of outfalls annually. NCS000557_Zebulon MS4 Audit_20220930 Page 11 of 25 Illicit Discharge Detection and Elimination (IDDE) II.D.2.1 The permittee promoted, publicized, and facilitated a reporting mechanism for the Yes Online Public Reporting public to report illicit discharges. Mechanism The permittee promoted, publicized, and facilitated a reporting mechanism for staff to report illicit discharges. Yes The permittee established and implemented response procedures for citizen requests/reports. No Comments (Generally describe reporting mechanisms and how promoted/publicized/facilitated/established) There is a report a concern webpage on the Town website: https://www.townofzebuIon,org/report-problem. Town employees usually contact Public Works to report issues. There are not currently response procedures in place for citizen complaints, but they are usually handled within 48 hours II.Q.2.1 The permittee implemented a mechanism to track the issuance of notices of violation Enforcement and enforcement actions administered by the permittee. Yes If yes, the mechanism includes the ability to identify chronic violators for Not initiation of actions to reduce noncompliance. Applicable Comments (Generally describe the established tracking mechanism, if applicable) The Town is still small enough that complaints and documentation are all maintained manually in the binder. The Town has not yet needed to issue an NOV and there have been no repeat violators. Additional Comments: NCS000557.Zebulon MS4 Audit 20220930 Page 13 of 25 Pollution Prevention and Good Housekeeping for Municipal Operations Parking Lots If yes, the permittee evaluated the effectiveness of existing and new BMPs Maintenance based on cost and the estimated quantity of pollutants removed. Yes 2 Comments Street sweeping is tracked by hours, miles and debris collected. The Town has doubled in street miles and has used the data collected to request more of a budget. HAM O&M for Catch The permittee maintained and implemented an O&M program for the stormwater sewer system including catch basins and conveyance systems that it owns and F.O --- Basins and maintains. Conveyance Systems Comments (Briefly describe O&M program) Pollution Prevention and Good Housekeeping is addressed in Section 7.6 of the SWPPP. There is not a dedicated O&M Program for stormwater sewer system conveyance systems, but the maintenance and cleaning of these are mentioned in the SWMP. An 0&M Program for the stormwater sewer system including catch basins should be developed. II.G.2.¢ The permittee maintained a current inventory of municipally -owned or operated Structural structural stormwater controls installed for compliance with the permittee's post- Yes 7 Stormwater Controls construction ordinance. Comments (Describe inventory information and number of controls in inventory) The Town has two town -owned SCMs. The SCMs information and inspections are kept in binders. II.G.2.h The permittee maintained and implemented an O&M program for municipally - O&M for Structural owned or maintained structural stormwater controls installed for compliance with Partial 7 Stormwater Controls the permittee's post -construction ordinance. If yes, then: The O&M program specified the frequency of inspections and routine maintenance requirements. No --- The permittee documented inspections of all municipally -owned or maintained structural stormwater controls. Yes 7 The permittee inspected all municipally -owned or maintained structural stormwater controls in accordance with the schedule developed by permittee. Yes The permittee maintained all municipally -owned or maintained structural stormwater controls in accordance with the schedule developed by permittee. Yes ! The permittee documented maintenance of all municipally -owned or maintained structural stormwater controls. Yes Comments Dedicated O&M Plans for the SCMs were not available. However, each SCM is inspected annually by an engineer. Other visual inspection take place and regular maintenance is documented in work orders- ll'G'2'i The permittee ensured municipal employees are properly trained in pesticide, herbicide and fertilizer application management. Yes NCS000557_Zebulon MS4 Audit_20220930 Page 15 of 25 Pollution Prevention and Good Housekeeping for Municipal Operations WC5000557_Zebulon MS4 Audit_20220930 Page 17 of 25 Site Visit Evaluation: Municipal Facility No. 1 Does the MS4 inspector's process include taking photos? Asneeded Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)? Yes Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? Yes Did the MS4 inspector miss any obvious areas of concern? If so, explain: No Does the MS4 inspector's process include presenting the inspection findings to the facility contact? Yes Inspection Results Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)? Material was leaching out of the salt storage area. This will need to be addressed. If compliance corrective actions were identified, what timeline for correction/follow-up was provided? N/A Notes/Comments/Recommendations N[S000557—Zebulon MS4 Audit 20220930 Page 19 of 25 Site Visit Evaluation: MS4 Outfall No.1 Inspection Results Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)? Yes, additional rip rap Will a follow-up outfall inspection be conducted? If so, for what reason? No Notes/Comments/Recommendations NCS000557 Zebulon MS4 Audit_20220930 Page 21 of 25 Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1 Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Yes Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain: No Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Yes Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? Minor maintenance If compliance issues were identified, what timeline for correction/follow-up was provided? N/A Notes/Comments/Recommendations NCS000557_Zebulon MS4 Audit_20220930 Page 23 of 25 APPENDIX B: PHOTOGRAPH LOG NC5000557_Zebulon MS4 Audit_20220930 Page 25 of 25