September 19, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
JimmieKerr LLC
Attention:Balvantbhai Patel, Owner
1506 Bowmoore Place
McLeansville, NC 27301
RE: Project Name: Jimmie Kerr Road C Store
Project ID: ALAMA-2023-003
Acres Approved: 2.9
County: Alamance
City: Graham
Address: Jimmie Kerr Road
River Basin: Cape Fear
Stream Classification: WS-V; NSW; Jordan Lake Watershed
Submitted By: LEADS Group, PA
Date Received by LQS: September 15, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
iewed and found to be complete, you will receive a
Construction General Permit. After the form is rev
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Parry shown on the FRO form submitted for
this project, you MUST obtain the COC at de .ncocommencement .�o /NCGO 1 Please f direct questions aboug
activity. The eNOI form may be accessed
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible parry must obtain a new COC.
North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources
Winston-Salem Regional office 1450 Hanes Mill Road, Suite 300 Winston-Salem, North Carolina 27105
336-776-9800
w oru
Letter of Approval with Modifications
JimmieKerr LLC
September 19, 2022
Page 3 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Jimmie Kerr Road C Store
Project ID: ALAMA-2023-003
County: Alamance
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. The sediment basins should have flat bottoms to allow sediment laden water adequate spread
across the bottom to increase opportunity for sediment deposition and lessening the chance of
channel flow to the skimmer. [G.S. 113A-57(3)]
2. Provide outlet stabilization for all skimmer sediment basins. A stone outlet in the silt fence is
not a suitable replacement for outlet stabilization designed to achieve non -erosive flow. [15A
NCAC 4B .0106(a)(6)]
3. Be advised the financially responsible parry must have all retaining walls over 4 feet
designed, sealed, and construction certified by a professional engineer licensed in North
Carolina in accordance with all state and local building codes/ordinances. This plan review is
for erosion and sediment control and construction stormwater during construction only and
does not include approval of retaining wall construction or slope -stability analysis. [North
Carolina Building Code 1807]
4. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 413 .0110]
5. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
6. The NCGO 1 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCGO1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
your construction accordingly to avoid contacting our office prematurely for a closure