HomeMy WebLinkAboutNCC223343_ESC Approval Submitted_20220929DocuSign Envelope ID: 66F2BCB4-1626-4858-B6CC-D5F33ED37370
ROY COOPER
Governor
'.JZABETF1 S. BISBR
%crrt�r�y
BMAN WRBNN
Otrecrer
NC n'm CAROLINA
Envkanmonral Quality
September 13, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Burleson Development Group, LLC
Attention: Joseph L. Burleson, Member/Manager
248 Market Street
Locust, North Carolina 28173
RE: Project Name: Copper Ridge Subdivision
Project ID: STANL-2022-032
Acres Approved: 6.71
County: Stanly
City: Albemarle
Location: Nelson Mountain Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Jones Civil Design
Date Received by LQS: September 06, 2022
Plan Type: Revised
Dear Mr. Burleson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129,
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eN01 form to the Stormwater Progyram staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 413 .0118(a) and the NCGO 1 permit require that the following documentation be kept
on file at the job site:
l . The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality Di4sion of Energy, Mineral and Resources
Mooresville Reginal Office iG 10 East Center Avenue, Suite 30[ Mooresville, North Carolina 28115
70A.663.1G99
�arvwsat of pnvNm.rnHal rv�iaON
DocuBign Envelope ID: 66F2BCB4-1626-4858-66CC-D5F33ED37370
Letter of Approval with Modifications
Burleson Development Group, LLC
September 13, 2022
Page 2 of 3
2. The NCGOI permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Jones Civil Design
Attn: C. Matthew Jones
1019 Thornsby Lane
Matthews, NC 28105
Sincerely,
DOCUSigned by:
/8B37DAC4A1OE49A...
Kenny S. Llywelyn
Assistant Regional Engineer
Land Quality Section
RE Q�/�
Ao-Id1A9111Q RRFdRAIItIF111
North Carolina Department of Environmental Quality Division of Energy, Mineral and kesoumes
Mooresville Reginal Office. 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 29115
704.663.1699
Docu5ign Envelope ID; 86FZBCB4-1626-4858-B6CC-05F33ED37370
Letter of Approval with Modifications
Burleson Development Group, LLC
September 13, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Copper Ridge Subdivision
Project ID: STANL-2022-032
County: Stanly
Reviewed by: Kenny S. Llywelyn
Move all notes and leaders outside of the review area as much as possible. The many notes
and leaders are in the way of reviewing critical details and features on the plan.
k
*-A North Carolina Department Of Environmental Quality Divksion of Energy, Mineral and Resources
' Mooresville Reginal Office 16 W East Center Avenue, Suite 301 Mooresville, North Carolina 291 l
n;r r€Dm E Q
r�J NA 704.663.1699
oat�a€tman7al emtrcnniara€I �3willr