Loading...
HomeMy WebLinkAboutNCC223343_ESC Approval Submitted_20220929DocuSign Envelope ID: 66F2BCB4-1626-4858-B6CC-D5F33ED37370 ROY COOPER Governor '.JZABETF1 S. BISBR %crrt�r�y BMAN WRBNN Otrecrer NC n'm CAROLINA Envkanmonral Quality September 13, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Burleson Development Group, LLC Attention: Joseph L. Burleson, Member/Manager 248 Market Street Locust, North Carolina 28173 RE: Project Name: Copper Ridge Subdivision Project ID: STANL-2022-032 Acres Approved: 6.71 County: Stanly City: Albemarle Location: Nelson Mountain Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Jones Civil Design Date Received by LQS: September 06, 2022 Plan Type: Revised Dear Mr. Burleson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 form to the Stormwater Progyram staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413 .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: l . The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality Di4sion of Energy, Mineral and Resources Mooresville Reginal Office iG 10 East Center Avenue, Suite 30[ Mooresville, North Carolina 28115 70A.663.1G99 �arvwsat of pnvNm.rnHal rv�iaON DocuBign Envelope ID: 66F2BCB4-1626-4858-66CC-D5F33ED37370 Letter of Approval with Modifications Burleson Development Group, LLC September 13, 2022 Page 2 of 3 2. The NCGOI permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Jones Civil Design Attn: C. Matthew Jones 1019 Thornsby Lane Matthews, NC 28105 Sincerely, DOCUSigned by: /8B37DAC4A1OE49A... Kenny S. Llywelyn Assistant Regional Engineer Land Quality Section RE Q�/� Ao-Id1A9111Q RRFdRAIItIF111 North Carolina Department of Environmental Quality Division of Energy, Mineral and kesoumes Mooresville Reginal Office. 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 29115 704.663.1699 Docu5ign Envelope ID; 86FZBCB4-1626-4858-B6CC-05F33ED37370 Letter of Approval with Modifications Burleson Development Group, LLC September 13, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Copper Ridge Subdivision Project ID: STANL-2022-032 County: Stanly Reviewed by: Kenny S. Llywelyn Move all notes and leaders outside of the review area as much as possible. The many notes and leaders are in the way of reviewing critical details and features on the plan. k *-A North Carolina Department Of Environmental Quality Divksion of Energy, Mineral and Resources ' Mooresville Reginal Office 16 W East Center Avenue, Suite 301 Mooresville, North Carolina 291 l n;r r€Dm E Q r�J NA 704.663.1699 oat�a€tman7al emtrcnniara€I �3willr