Loading...
HomeMy WebLinkAbout20141131 Ver 1_Application_20141028SR (1715)Bunn Simpson Rd SR (17 16) Holly Sch ool Rd SR (1717)Sandy Smith Rd SR (1006)Olive Branch Rd SR (1714) B urnsville R d S R (1710) Pleasant Hill Church Rd SR (17 13) Jerusale m Ch urch Rd S R ( 1 7 1 9) Mars h ville- Oliv e Bra n c h R d 218 C r e e k G o u r d v i n e Creek Gourdvine BEGIN PROJECT END PROJECT 0 PROFILE (HORIZONTAL) RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) D E P A R T MEN T O F TRAN SPORTA T IO N S T A TE OF NORT H CAR O LI N A 1020 20 2001020 4 2 0 4 8 PLANS PREPARED FOR THE NCDOT BY: VICINITY MAP N.T.S. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 40 P.E. 40 NCDOT CONTACT: PROJECT LENGTH DHV D T V = = = = =MPH ADT N/A N/A =ADT DESIGN DATA 6% SIGNATURE: P.E. P.E. ENGINEER HYDRAULICS SIGNATURE: ENGINEER DESIGN ROADWAY 4 2012 35 DETOUR P R E L I M I N A R Y P L A N S Division Bridge Manager NIKKI T. HONEYCUTT, PE PROJECT DESIGNER 17BP.10.R.74 17BP.10.R.74 2025 P R O J E C T W B S : 17 B P . 10 . R . 7 4 LOCAL FUNC. CLASSIFICATION: -L- STA. 12+20.00 BEGIN PROJECT WBS 17BP.10.R.74 TYPE OF WORK: GRADING, PAVING, DRAINAGE, & STRUCTURE m a b d e la z i z R : \ H y d r a u li c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 7 4 _ H y d _ P r m _ t s h . d g n 10 / 14 / 2 0 14 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 C O N T R A C T : -L- STA. 15+55.00 END PROJECT WBS 17BP.10.R.74 UNION COUNTY LOCATION: BRIDGE #342 OVER GOURDVINE CREEK ON SR 1715 (BUNN SIMPSON RD.) -L- SR 1715 (BUNN SIMPSON ROAD) -L- STA. 13+65.00 BEGIN BRIDGE -L- STA. 14+50.00 END BRIDGE GARLAND HAYWOOD, PE TOTAL LENGTH OF PROJECT WBS 17BP.10.R.74 = 0.063 MILES LENGTH OF STRUCTURE PROJECT WBS 17BP.10.R.74 = 0.016 MILES LENGTH OF ROADWAY PROJECT WBS 17BP.10.R.74 = 0.047 MILES 1,400 2,800 MAAMOON K ABDELAZIZ JULY 15, 2014 SEPTEMBER 17, 2014 STREAM IMPACTS SITE 1 C REEK G O U RD VIN E ofSheet Permit Drawing NORTH CAROLINA TO SR 17 16 TO SR 1710 Scale : 80 N SRS 2 0 0 7 N AD 8 3 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. R :\ H y d r a u l i c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 7 4 _ H y d _ P r m _ p s h 0 4 .d g n 10 / 14 / 2 0 14 14+00 365 370 375 380 385 390 395 14+50 15+0012+00 12+50 13+00 13+50 17BP.10.R.74 395 390 385 380 375 370 365 15+50 16+00 16+5011+50 17+00 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 N AD 8 3 N SRS 2 0 0 7 SITE 1 FIGURE SEE SITE 1 ofSheet Permit Drawing GRAPHIC SCALE 0'40'40' LEGEND SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) 0.04 0.01 69 47 -L - P O T S t a . 17 + 0 0 .0 0P T S t a . 13 + 9 0 .4 2 P OC S ta. 11+ 5 0 .0 0 S R 17 15 B U N N S IM P S O N R O A D Scale : 40 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PI = 13+20.00 EL = 384.73' (-)4 .5 7 0 0% VC = 50' K = 10 PI = 15+15.00 EL = 385.48' (+)0.3846%(+)4.1250% VC = 65' K = 17 DS = 15 MPH DS = 20 MPH 1. 5 : 1 1.5 :1 -L- STA 13+65.49 BEGIN BRIDGE -L- STA 14+50.50 END BRIDGE EXISTING GROUND PROPOSED GRADE BEGIN PROJECT WBS 17BP.10.R.74 EL = 389.30 -L- STA 12+20.00 EL = 387.13' -L- STA 15+55.00 END PROJECT WBS 17BP.10.R.74 LOW POINT ELEV. 384.82' STA. 13+41.12 SPEED PER SUB-REGIONAL TIER DESIGN GUIDELINES IS UP TO 20 MPH LESS THAN OVERALL DESIGN NOTE: DESIGN SPEED SHOWN FOR VERTICAL CURVES SIDES) EXCAVATION (TOTAL BOTH UNCLASSIFIED STRUCTURE ESTIMATED 400 C.Y. BL-1 BL-2 BL-3 TO BE REMOVED EXIST BRIDGE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = 2000 = 25 = 378.0 = 2898 = 100 = 379.33 = >3800 = >500 = 384.9 T G A T E 4' 5S B W EXISTING R/W BL-1 GOUR DVINE CR E E K EXISTING R/W E X I S T I N G R/ W E X I S T I N G R/ W 4 0 . 0 0 ' 4 0 .0 0 ' DORIS SUE THOMAS FULLWOOD DB 1053 PG 105 DB 6201 PG 386 MELISSA THOMAS YORK THOMAS VINSON YORK SHARON AUSTIN LITTLE RODNEY LEN AUSTIN DB 283 PG 533 SANDRA O. MEDLIN DB 6226 PG 201 1 4 3 2 15 + 0 0 16 + 0 0 14 + 0 0 13 + 0 0 12 + 0 0 S S S S S S S S S S S S S TS TS TS TS TS TS TS TS TS TS TSTSTS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TSTS TS TSTS TSTS TS TS TS TS TS TS TSTS TS TS TS TSTS TS TS TS TS TS TS TS TS TS TSTS TS TS S F F F F C F F F C F F F C C C C C F F F C F HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. R :\ H y d r a u l i c s \ P E R M IT S _ E n v i o r n m e n t a l \ D r a w i n g s \ P r m S H T \ 10 R 7 4 _ H y d _ P r m _ p s h 0 4 A .d g n 10 / 14 / 2 0 14 Scale : 20 14+00 365 370 375 380 385 390 395 14+50 15+0012+00 12+50 13+00 13+50 17BP.10.R.74 395 390 385 380 375 370 365 15+50 16+00 16+5011+50 17+00 900 West Trade St., Ste. 715 Charlotte, NC 28202 NC License Number F-0991 N AD 8 3 N SRS 2 0 0 7 SITE 1 FIGURE SEE SITE 1 ofSheet Permit Drawing GRAPHIC SCALE 0'40'40' LEGEND SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY S TS S TS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) .04 .01 69 47 -L - P O T S t a . 17 + 0 0 .0 0P T S t a . 13 + 9 0 .4 2 P OC S ta. 11+ 5 0 .0 0 S R 17 15 B U N N S IM P S O N R OA D 4A DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PI = 13+20.00 EL = 384.73' (-)4 .5 7 0 0% VC = 50' K = 10 PI = 15+15.00 EL = 385.48' (+)0.3846%(+)4.1250% VC = 65' K = 17 DS = 15 MPH DS = 20 MPH 1. 5 : 1 1.5 :1 -L- STA 13+65.49 BEGIN BRIDGE -L- STA 14+50.50 END BRIDGE EXISTING GROUND PROPOSED GRADE BEGIN PROJECT WBS 17BP.10.R.74 EL = 389.30 -L- STA 12+20.00 EL = 387.13' -L- STA 15+55.00 END PROJECT WBS 17BP.10.R.74 LOW POINT ELEV. 384.82' STA. 13+41.12 SPEED PER SUB-REGIONAL TIER DESIGN GUIDELINES IS UP TO 20 MPH LESS THAN OVERALL DESIGN NOTE: DESIGN SPEED SHOWN FOR VERTICAL CURVES SIDES) EXCAVATION (TOTAL BOTH UNCLASSIFIED STRUCTURE ESTIMATED 400 C.Y. BL-1 BL-2 BL-3 TO BE REMOVED EXIST BRIDGE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA = 2000 = 25 = 378.0 = 2898 = 100 = 379.33 = >3800 = >500 = 384.9 3 6 8 370 3 7 0 3 7 0 3 7 0 3 7 2 3 7 2 3 7 4 374 3 7 6 376 376 3 7 6 3 7 6 378 3 7 8 3 7 8 378 38 0 3 8 0 380 3 8 0 380 380 3 8 0 380 382 3 8 2 382 382 3 8 4 384 3 8 4 384 384 384 3 8 6 386 386 3 8 6 3 8 8 388 3 8 8 3 8 8 388 3 9 0 3 9 0 390 390 3 9 0 390 3 9 0 3 9 2 3 9 2 3 9 2 3 9 2 394 394 396 396 396 3 9 8 398 398 4 0 0 400 4 0 0 400 400 400 402 402 404406 408 410 410 412 414 T G A T E 4' 5S B W EXISTING R/W BL-1 GOUR DVINE CR E E K EXISTING R/W E X I S T I N G R/ W E X I S T I N G R/ W 4 0 . 0 0 ' 4 0 .0 0 ' DORIS SUE THOMAS FULLWOOD DB 1053 PG 105 DB 6201 PG 386 MELISSA THOMAS YORK THOMAS VINSON YORK SHARON AUSTIN LITTLE RODNEY LEN AUSTIN DB 283 PG 533 SANDRA O. MEDLIN DB 6226 PG 201 +50.00 +50.00 20.00', 48.00' +50.00 20.00', 43.00' +55.00 +50.00 42.00', 48.00' 19.69' +20.00 48.00' 20.29' +75.00 43.00' 1 4 3 2 15 + 0 0 16 + 0 0 14 + 0 0 13 + 0 0 12 + 0 0 DAOR NOSPMIS NNUB -L- S S S S S S S S S S S S S TS TS TS TS TS TS TS TS TS TS TSTSTS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TSTS TS TSTS TSTS TS TS TS TS TS TS TSTS TS TS TS TSTS TS TS TS TS TS TS TS TS TS TSTS TS TS S T DORIS SUE THOMAS FULLWOOD DB 1053 PG 105 SANDRA O. MEDLIN DB 6226 PG 201 DB 6201 PG 386 MELISSA THOMAS YORK THOMAS VINSON YORK SHARON AUSTIN LITTLE RODNEY LEN AUSTIN DB 283 PG 533 GOUR DVINE CR E E K G O U R D V I N E C R E E K 2 3 1 4 DAOR NOSPMIS NNUB -L- 14 + 0 0 S S S S S S S S S S S S S S TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TSTSTS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TS TSTS TS TS TSTS TS TS TSTS TS TS TS TS TS TS TSTS SITE 1 SURFACE WATER DENOTES IMPACTS IN IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND S TS S TS ofSheet Permit Drawing N AD 8 3 N SRS 2 0 0 7 DIVISION OF HIGHWAYS NCDOT 10/14/2014 UNION COUNTY PROJECT: 17BP.10.R.74 # SHEET 1 OF 1GRAPHIC SCALE 0'10'10' IN SURFACE WATER TEMPORARY IMPACTS IN SURFACE WATER TEMPORARY IMPACTS STREAM PERMIT IMPACT SW IMPACTS PERMANENT SW IMPACTS TEMPORARY AREA (AC)LENGTH (FT) 0.04 0.01 69 47 IN SURFACE WATER TEMPORARY IMPACTS IN SURFACE WATER PERMANENT IMPACTS (BUNN SIMPSON ROAD) ON SR 1715 GOURDVINE CREEK BRIDGE 342 OVER SCALE 1"=20' IN SURFACE WATER PERMANENT IMPACTS PROPERTY OWNERS PARCEL NO.NAMES ADDRESS 10/14/2014SHEET 1 OF 1 1 2 3 SCALE 1"=10' MARSHVILLE, NC 28103 5901 BUNN SIMPSON ROAD MARSHVILLE, NC 28103 6207 BUNN SIMPSON ROAD MARSHVILLE, NC 28103 BUNN SIMPSON ROAD MARSHVILLE, NC 28103 BUNN SIMPSON ROAD 4 SANDRA O. MEDLIN NAMES AND ADDRESSES DIVISION OF HIGHWAYS NCDOT UNION COUNTY PROJECT: 17BP.10.R.74 # (BUNN SIMPSON ROAD) ON SR 1715 GOURDVINE CREEK BRIDGE 342 OVER MELISSA THOMAS YORK THOMAS VINSON YORK SHARON AUSTIN LITTLE RODNEY LEN AUSTIN DORIS SUE THOMAS FULLWOOD Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 -L- 12+98 to 13+26 0.01 0.04 47 69 TOTALS:0.01 0.04 47 69 ATN Revised 3/31/05 SHEET WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS 85' (33" Box Beam); w/4' End Bent Caps UNION COUNTY NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 17BP.10.R.74 10/24/2014