Loading...
HomeMy WebLinkAbout20110089 Ver 7_Stormwater Site Plans_20220921L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-00.00 Cover.dwg Sep 20, 2022 - 1:57pm GENERAL NOTES: 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE OFFICE OF STATE CONSTRUCTION, DEPARTMENT OF INSURANCE, NCDENR, AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL GUIDELINES. ALL UTILITY CONSTRUCTION SHALL COMPLY WITH APPLICABLE LOCAL JURISDICTIONAL STANDARDS AND SPECIFICATIONS. 2. EXISTING SURVEY INFORMATION INCLUDING TOPOGRAPHIC INFORMATION PROVIDED BY STEWART , UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, COORDINATING AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES. THE CONTRACTOR SHALL PROVIDE NOTICE OF EXCAVATION TO NOTIFICATION CENTER AND FACILITY OWNERS (PER NC STATUTE) NO LESS THAN 3 BUSINESS DAYS AND NO MORE THAN 12 WORKING DAYS PRIOR TO BEGINNING DEMOLITION, EXCAVATION OR ANY OTHER FORM OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. NO EXCAVATION OR DEMOLITION SHALL BE STARTED WITHOUT ALL UTILITIES BEING LOCATED. 4. ALL SUB -SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND/OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 5. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND COORDINATING PERMITS, INSPECTIONS, CERTIFICATIONS AND OTHER REQUIREMENTS WHICH MUST BE MET UNDER THIS CONTRACT. 7. THE CONTRACTOR SHALL MAINTAIN "AS -BUILT" DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT, VALVE AND MANHOLE CHANGES, AND HARDSCAPE OR LANDSCAPE CHANGES. DRAWINGS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE AT REGULAR INTERVALS, OR AS REQUESTED THROUGHOUT THE PROJECT FOR RECORD KEEPING. 8. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THERE OF SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE OWNER'S REPRESENTATIVE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY LINES REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COORDINATION AND COSTS OF THE RELOCATION AND ASSOCIATED WORK. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH CAUSED BY THE CONTRACTOR. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. 11. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 12. ROADWAYS (TEMPORARY OR PERMANENT) MUST BE CAPABLE OF SUPPORTING FIRE FIGHTING APPARATUS (85,000 LBS) DURING ALL PHASES OF CONSTRUCTION ONCE VERTICAL CONSTRUCTION HAS BEGUN. EXISTING CONDITION NOTES: 1. THIS SURVEY MAP IS INTENDED TO REPRESENT THE EXISTING CONDITIONS/TOPOGRAPHY ON A PORTION OF THE PROPERTY AND ALL ENCUMBRANCES UPON THE PROPERTY MAY NOT BE SHOWN. 2. HORIZONTAL DATUM IS NAD 83-2011 AND VERTICAL DATUM IS NAVD88. 3. THIS DRAWING DOES NOT CONFORM TO N.C. GS47-30 AND THEREFORE IS NOT FOR RECORDATION. 4. UTILITIES SHOWN HEREON ARE BASED ON ABOVE GROUND VISIBLE EVIDENCE AND UTILITY DESIGNATION / MARKING SERVICES PERFORMED BY STEWART INC, AND THE AVAILABLE RECORD INFORMATION. CONTRACTOR SHALL FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR TO COMMENCING CONSTRUCTION. 5. SURVEY INFORMATION BASED ON FIELD SURVEY BY STEWART COMPLETED ON 04/09/2021. 6. TREES SHOWN HEREON MAY NOT REPRESENT ALL VEGETATION ON THE SUBJECT PROPERTY. 7. THE SUBJECT PROPERTY LIES IN ZONES X (AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE AND FUTURE CONDITIONS 1% ANNUAL CHANCE FLOODPLAIN). BASED ON THE FLOOD INSURANCE RATE MAP COMMUNITY MAP NUMBER 3710460300J DATED AUGUST 16, 2007. 8. NO WETLANDS HAVE BEEN IDENTIFIED WITHIN THE PROJECT OR PARCEL SHOWN. DEMOLITION NOTES: 1. THE CONTRACTOR SHALL REMOVE CONCRETE (WHERE REQUIRED) TO THE FIRST COLD JOINT OR SAW CUT TO OBTAIN A CLEAN EDGE. 2. THE CONTRACTOR SHALL SAWCUT EXISTING ASPHALT (WHERE REQUIRED) TO OBTAIN A CLEAN EDGE. 3. CLEANOUTS AND WATER VALVES LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUCTION SHALL BE PROTECTED FROM DAMAGE AND RAISED TO BE FLUSH WITH NEW GRADE. 4. ANY UTILITY SERVICES SHOWN TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY PROVIDER. CONTRACTOR IS RESPONSIBLE FOR APPROPRIATE SEQUENCING OF UTILITY DEMOLITION WITH THE RESPECTIVE UTILITY AGENCIES. 5. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UTILITIES PRIOR TO BEGINNING DEMOLITION OPERATIONS. NOTIFY "NORTH CAROLINA ONE CALL" (TELEPHONE 1-800-632-4949) AT LEAST 48 HOURS PRIOR TO START OF DEMOLITION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NORTH CAROLINA ONE CALL." 6. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL. COMPACTION OF THESE SOILS SHALL BE PERFORMED IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. 7. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY, INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED. 8. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE DISPOSED OF LEGALLY OFF -SITE UNLESS OTHERWISE NOTED ON THIS PLAN. 9. REFER TO LANDSCAPE AND EROSION CONTROL DRAWINGS FOR TREE PROTECTION PLAN AND REQUIREMENTS. 10. ALL DEMOLITION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL JURISDICTIONAL CODES OR REQUIREMENTS. 11. TREE PROTECTION FENCING SHALL BE IN PLACE PRIOR TO BEGINNING DEMOLITION 12. EROSION CONTROL PERMIT SHALL BE OBTAINED AND ONSITE PRIOR TO BEGINNING DEMOLITION. 13. ITEMS DESIGNATED TO BE SALVAGED AND/OR RE -USED SHALL BE REMOVED BY THE CONTRACTOR AND PROVIDED TO THE OWNER. COORDINATE STORAGE LOCATION WITH OWNER'S REPRESENTATIVE. 14. WHERE UTILITIES ("TO BE REMOVED") IMPACT THE FOOTPRINT OF THE NEW BUILDING, THE CONTRACTOR SHALL EXECUTE AND REMOVE AN ADDITIONAL 2 FEET OF SOILS TO EITHER SIDE OF THE PIPE, AND 1 FOOT BELOW. CLEAN SUITABLE SOIL SHALL BE UTILIZED FOR BACKFILL AND COMPACTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 15. DEMOLITION AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE PIPING SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES REMOVED DO NOT IMPACT DRAINAGE UPSTREAM OF THE SYSTEM. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE PATTERNS DURING CONSTRUCTION. 16. DEMOLITION AND SUBSEQUENT CONSTRUCTION OF UTILITIES (WATER, SEWER, ETC) SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES REMOVED DO NOT IMPACT OR MINIMIZE SERVICE INTERRUPTION TO EXISTING FACILITIES TO REMAIN. PROVISIONS SHALL BE MADE TO MAINTAIN SERVICE DURING CONSTRUCTION. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL DAMAGES TO THE EXISTING DRIVEWAY, PARKING LOT, SIDEWALK AND CURB AND GUTTER AS A RESULT OF CONSTRUCTION ACTIVITY AND TRAFFIC. CONTRACTOR SHALL MAINTAIN A PRE -CONSTRUCTION VIDEO OR PHOTO DOCUMENTATION TO SHOW NO DAMAGES OCCURRED. 18. ALL MATERIALS, FURNISHINGS, UTILITIES, AND PAVEMENT THAT ARE NOT SCHEDULED TO BE DEMOLISHED AND ARE DAMAGED BY THE CONTRACTOR AS A RESULT OF THE DEMOLITION OR CONSTRUCTION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 19. WHERE UTILITIES ARE SHOWN TO BE "REMOVED", CONTRACTOR SHALL INCLUDE NECESSARY PLUG OR VALVES TO ENSURE UTILITY LINES TO REMAIN WILL CONTINUE TO BE IN SERVICE. COORDINATE NECESSARY SHUT DOWN AND REMOVAL WITH THE LOCAL JURISDICTION OR UTILITY OWNER. 20. CONTRACTOR SHALL PROVIDE PEDESTRIAN INGRESS / EGRESS TO ALL EXISTING BUILDINGS, PARKING LOTS, AND PATHS OF PEDESTRIAN TRAVEL THROUGHOUT THE CONSTRUCTION PERIOD SITE NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF THE CONSTRUCTION LAYDOWN AREA, PERIMETER FENCE, AND ASSOCIATED GATES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE REMOVAL OF THE CONSTRUCTION LAYDOWN AREA PERIMETER FENCE AND ASSOCIATED GATES AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL REFERENCE THE ARCHITECTURAL PLANS FOR DIMENSIONS, JOINTS AND INLAY SPECIFICATIONS NEAR THE BUILDING AND COURTYARD. THE CONTRACTOR SHALL PROVIDE JOINTS IN WALKWAYS EVERY EIGHT(8) FEET MAXIMUM, OR AS INDICATED ON ARCHITECTURAL PLANS SHEETS. 2. ALL CONSTRUCTION TRAFFIC SHALL ENTER SITE FROM AIRLIE PARKWAY UNLESS OTHERWISE APPROVED IN WRITING FROM THE OWNER'S REPRESENTATIVE FOR AN ALTERNATE POINT OF ACCESS. 3. REFER TO ARCHITECTURAL PLANS FOR BUILDING INFORMATION. 4. ALL DIMENSIONS ARE IN DECIMAL FEET TO OUTSIDE FACE OF BUILDINGS, TO CENTERLINES, AND/OR FACE OF CURB UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE PRIOR TO ANY CONSTRUCTION. 6. ALL WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE FROM DRAWINGS. 7. ALL UTILITIES WITH SURFACE ACCESS SHALL BE LOCATED WITHIN THE PAVING PATTERN AND SHALL BE COORDINATED WITH CIVIL ENGINEER PRIOR TO CONSTRUCTION. REFER TO LAYOUT DRAWINGS. 8. ALL ANGLES ARE 45 DEGREES OR 90 DEGREES UNLESS OTHERWISE NOTED. 9. ALIGN ALL JOINTS, CORNERS, AND EDGES AS SHOWN 10. CONTRACTOR SHALL REFER TO AND COORDINATE WITH ARCHITECTURAL, STRUCTURAL, AND MEP DRAWINGS AT ALL TIMES PRIOR TO AND DURING CONSTRUCTION. 11. ALL CURB TAPERS ARE SIX (6') FEET LONG UNLESS OTHERWISE SHOWN ON PLAN. 12. WHERE NEW SIDEWALK ADJOINS EXISTING WALK, PROVIDE EXPANSION JOINT BY DRILLING INTO THE FACE OF THE EXISTING WALK FOR PLACEMENT OF DOWELS. TIE NEW SIDEWALKS INTO NEAREST EXISTING PAVEMENT JOINT; MATCH WIDTH OF EXISTING WALKWAY. 13. WHERE SIDEWALK OR WALKWAYS ARE ADJACENT TO PARKING SPACES THE WALKWAY SHALL BE A MINIMUM 6.5' WIDE AS MEASURED FROM THE FACE OF CURB. 14. MAXIMUM RUNNING SLOPE FOR WALKING SURFACES CANNOT BE GREATER THAN 1:20 AND CROSS SLOPES CANNOT BE GREATER THAN 1:48. HANDICAP SPACES SURFACE SLOPES SHALL NOT EXCEED 1:48 IN ALL DIRECTIONS. 15. SIGHT TRIANGLES - NOTHING OVER 30" HIGH SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLES. 16. THE SITE SHALL BE FULLY STABILIZED (90% COVERAGE) PRIOR TO ISSUANCE OF A BUILDING CERTIFICATE OF OCCUPANCY OR PROJECT APPROVAL 17. HANDICAP RAMPS SHALL BE INSTALLED PER THE PLANS AND SPECIFICATIONS AND THE NC BUILDING CODE. A MAXIMUM SLOPE OF 1/12 FOR 6-FEET AND A MAXIMUM CROSS SLOPE OF 1:48 SHALL BE PROVIDED. IF EXISTING CONDITIONS PRECLUDE THIS REQUIREMENT, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION 18. THE TESTING AGENCY SHALL BE RESPONSIBLE FOR PROVIDING THE ASPHALT AND CONTRACTOR CERTIFICATION MEMO TO NCDOT FOR ALL ROADWAY IMPROVEMENTS WITHIN THE PUBLIC RIGHT-OF-WAY. GRADING AND STORM DRAINAGE NOTES: 1. CONTRACTOR SHALL REPORT ANY GRADE DISCREPANCIES TO THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING CONSTRUCTION OPERATIONS. 2. THE MAXIMUM SLOPE ALONG ANY HANDICAP ACCESSIBLE PATHWAY SHALL NOT EXCEED 5.0% AND SHALL NOT EXCEED A 2.0% CROSS SLOPE. HANDICAP RAMPS INDICATED ON PLANS SHALL BE A MAXIMUM OF 1/12 SLOPES WITH A MAXIMUM RISE OF 30" BETWEEN LANDINGS. NON -CURB CUT RAMPS SHALL HAVE HANDRAILS AND GUARDS PER DETAILS WITH 5' LANDINGS AT THE BOTTOM AND TOP OF RAMP. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL NEWLY CONSTRUCTED STORM DRAINAGE IMPROVEMENTS AND RECEIVING STORM DRAINAGE SYSTEMS REMAIN CLEAN OF SEDIMENT AND DEBRIS. PRIOR TO OWNER ACCEPTANCE OF SYSTEM, THE CONTRACTOR SHALL COORDINATE AND PROVIDE A VISUAL OBSERVATION VIDEO OF ALL STORM DRAINAGE IMPROVEMENTS 12" AND LARGER. THE VISUAL OBSERVATION SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE. THE CONTRACTOR SHALL PROVIDE TWO (2) DVD COPIES OF THE ENTIRE DRAINAGE VISUAL OBSERVATION. 4. PRIOR TO ISSUANCE OF A BUILDING CERTIFICATE OF OCCUPANCY THE CONTRACTOR SHALL PROVIDE THE OWNER WITH THE VIDEO INSPECTION OF THE STORM SEWER SYSTEM. (BOTH PUBLIC AND PRIVATE). THIS SUBMITTAL MAY NEED TO BE REVIEWED AND ACCEPTED BY THE LOCAL JURISDICTION PRIOR TO THE ISSUANCE OF THE BUILDING CO. 5. REFER TO THE EROSION CONTROL SHEETS FOR THE SEQUENCE OF CONSTRUCTION 6. INTERIM GRADING SHALL BE PROVIDED THAT ENSURES THE PROTECTION OF STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, AND WASHOUT. 7. INTERIM GRADING SHALL BE PROVIDED TO DIRECT WATER AWAY FROM BUILDINGS AND PREVENT PONDING. 8. TIE ROOF LEADERS WHERE POSSIBLE TO UNDERGROUND STORM SYSTEM. CONTRACTOR TO FIELD VERIFY LOCATE AND INSTALL WHERE POSSIBLE OR AS SHOWN ON PLANS. 9. MAXIMUM SLOPE ACROSS ANY HANDICAPPED PARKING SPACE AND AISLE SHALL NOT EXCEED 2% IN ANY DIRECTION. 10. PROPOSED CONTOURS ARE APPROXIMATE. SPOT ELEVATIONS AND ROADWAY PROFILES SHALL BE USED IN CASE OF DISCREPANCY. 11. PLACE BACKFILL AND FILL MATERIALS IN LAYER NOT MORE THAN 8 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND -OPERATED TAMPERS. PLACE BACKFILL AND FILL MATERIALS EVENLY ON ALL SIDES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. COMPACT SOIL TO NOT LESS THAN 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698 FOR EACH LAYER OF BACKFILL OR FILL MATERIAL UP TO TWO FEET OF FINISHED GRADE. COMPACT SOIL TO NOT LESS THAN 98 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698 FOR EACH LAYER OF BACKFILL OR FILL MATERIAL FOR THE FINAL TWO FEET. 12. SITE GRADING IMMEDIATELY ADJACENT TO FOUNDATION OF BUILDING SHALL SLOPE NOT LESS THAN 1/20 AWAY FOR MINIMUM DISTANCE OF 10 FEET. ALTERNATIVE METHOD SHALL BE PROVIDED TO DIVERT WATER AWAY FROM FOUNDATION VIA SWALES SLOPED AT A MINIMUM OF 2% OR IMPERVIOUS SURFACES SLOPED AWAY A MINIMUM OF 2% AWAY FROM BUILDING. 13. CONTRACTOR SHALL ADJUST RIM ELEVATIONS OF EXISTING MANHOLES, METERS, VALVES, ETC. AS REQUIRED TO MEET NEW FINISHED GRADES. 14. CONTRACTOR SHALL SLOPE GRADES TO ASSURE POSITIVE STORMWATER FLOW TO KEEP WATER FROM POOLING ALONG CURBS AND WALLS. 15. TOP OF WALL ELEVATIONS INDICATE THE ELEVATION AT THE FINISHED GRADE AT THE HIGH SIDE OF THE WALL, UNLESS OTHERWISE NOTED. 16. BOTTOM OF WALL ELEVATIONS INDICATE THE ELEVATION OF THE FINISHED GRADE AT THE LOW SIDE OF THE WALL. UTILITY NOTES: 1. UNLESS OTHERWISE NOTED, ALL MANHOLES SHALL BE PRE -CAST CONCRETE STRUCTURES. 2. THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF UNDERGROUND UTILITIES (WATER, SEWER, STORM, ELECTRICAL, GAS, OR OTHER) FOR THIS PROJECT WITH THE BUILDING PLANS. THE UTILITY CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE INSTALLATION OF ALL UTILITY SERVICES TO WITHIN FIVE (5) FEET OF THE BUILDING CONNECTION POINT. 3. THE CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTORS ON SITE AND UTILITY PROVIDERS DURING CONSTRUCTION TO ENSURE SMOOTH TRANSITION BETWEEN DISCIPLINES. 4. THE CONTRACTOR SHALL COORDINATE ALL PEDESTRIAN AND VEHICULAR INTERRUPTIONS WITH OWNER'S REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO BEGINNING WORK. 5. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK INSIDE THE PUBLIC RIGHT OF WAY PRIOR TO RECEIPT AND COMPLIANCE WITH ALL APPLICABLE NCDOT PERMITS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY FLAGGERS AND TRAFFIC CONTROL DURING ALL WORK INSIDE THE PUBLIC RIGHTS OF WAY. 6. THE CONTRACTOR SHALL NOT RE -USE ANY FIRE HYDRANT REMOVED AS PART OF THIS PROJECT. ANY FIRE HYDRANT SHOWN TO BE REMOVED OR RELOCATED SHALL BE REPLACED WITH A NEW FIRE HYDRANT MEETING THE LOCAL JURISDICTIONAL REQUIREMENTS AND STANDARDS. 7. ALL EXISTING SUB -SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND/OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE. DEPTHS OF EXISTING UTILITIES SHOWN IN PROFILE VIEWS ARE BASED ON STANDARD ASSUMPTIONS. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION, DEPTH, SIZE AND MATERIAL OF ANY AND ALL SUB -SURFACE CONDITIONS REFERENCED IN THESE PLANS PRIOR TO ANY EXCAVATION OR CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 8. ELEVATIONS OF UTILITIES ARE GIVEN TO THE EXTENT OF INFORMATION AVAILABLE, WHERE ELEVATIONS ARE NOT GIVEN AT POINTS OF EXISTING UTILITY CROSSINGS, SUCH ELEVATIONS SHALL BE DETERMINED BY THE CONTRACTOR AND REPORTED TO THE ENGINEER, WHEN UNKNOWN LINES ARE EXPOSED, THEIR LOCATIONS AND ELEVATIONS SHALL ALSO BE REPORTED TO THE ENGINEER. 9. UNDERGROUND UTILITIES SHOWN ON THIS PLAN SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION OF PARKING AREA, DRIVES, CURB AND GUTTER OR CONCRETE WALKS / PADS. IF UTILITIES SHOWN ON THIS PLAN CANNOT BE INSTALLED PRIOR TO INSTALLATION OF IMPERVIOUS (ASPHALT / CONCRETE) CONDUIT SHALL BE INSTALLED FOR THE "FUTURE" UTILITY INSTALLATION. 10. AS -BUILT DOCUMENTATION REQUIREMENTS: PRIOR TO APPROVAL FROM LOCAL JURISDICTION OR ENGINEER THE CONTRACTOR SHALL PROVIDE AS -BUILT DRAWINGS (IN BOTH PAPER AND ELECTRONIC FORMAT (CAD / PDF) PREPARED AND SEALED BY A PROFESSIONAL LAND SURVEYOR SHOWING ALL UTILITY INSTALLATION. HORIZONTAL AND VERTICAL INFORMATION SHALL BE PROVIDED FOR WATER, SEWER, STORM INCLUDING ALL STRUCTURES, VALVES, HYDRANTS, AND OTHER APPURTENANCES. PROPOSED UTILITY SEPARATION: 1. WATER MAINS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10-FOOT HORIZONTAL SEPARATION IN WHICH CASE; a. THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER; OR b. THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE OF A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP TO THE SEWER. 2. CROSSING A WATER MAIN OVER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION, IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 3. CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. 4. SEPARATION OF SANITARY SEWERS AND STORM SEWERS: a. A 24" VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR BOTH THE SANITARY AND THE STORM LINES SHALL BE CONSTRUCTED OF FERROUS MATERIALS. SEWER NOTES: 1. SANITARY SEWER CLEANOUTS LOCATED IN PAVEMENT AREAS SHALL BE HEAVY DUTY TRAFFIC BEARING CASTINGS. 2. UNLESS OTHERWISE NOTED, ALL SANITARY SEWER MANHOLES ARE 4' DIA. 3. MANHOLES LOCATED IN PAVEMENT, CONCRETE OR OTHER TRAFFIC AREAS SHALL BE SET AT GRADE. MANHOLES LOCATED IN OTHER AREAS (I.E. GRASS OR WOODED AREAS) SHALL HAVE THEIR RIMS RAISED SIX INCHES ABOVE THE SURROUNDING GRADE. MANHOLES SUBJECT TO POSSIBLE WATER INFILTRATION SHALL HAVE WATERTIGHT, BOLTED LIDS. 4. MINIMUM REQUIRED SLOPES FOR SEWER SERVICES: 4" SEWER SERVICE - 2.00% SLOPE 6" SEWER SERVICE - 1.00% SLOPE 8" SEWER SERVICE - 0.50% SLOPE 5. UNLESS OTHERWISE NOTED, LOCATE SANITARY SERVICE CLEANOUTS AT ALL HORIZONTAL OR VERTICAL CHANGES IN DIRECTION. MAXIMUM SPACING BETWEEN CLEANOUTS SHALL BE 75 FEET. 6. SEWER LINES LESS THAN 3 FEET OF COVER SHALL BE CLASS 50 DUCTILE IRON PIPE. SEWER LINES WITH GREATER THAN 3 FEET OF COVER SHALL BE AS NOTED BELOW: 4" SEWER SERVICE - SCH 80 6" SEWER SERVICE - SCH 80 8" SEWER SERVICE - SDR-35 7. SEWER LINES UNDER CONSTRUCTION SHALL BE PROTECTED FROM DIRT, DEBRIS OR OTHER CONTAMINANTS ENTERING THE NEW SYSTEM. A MECHANICAL PLUG SHALL BE UTILIZED BOTH IMMEDIATELY UPSTREAM OF THE NEW CONSTRUCTION AND AT THE FIRST MANHOLE DOWNSTREAM IN THE EXISTING SYSTEM. EXISTING STRUCTURES, PIPING AND APPURTENANCES SHALL BE PROTECTED FROM ANY INFLOW OF WATER, DIRT OR DEBRIS DUE TO NEW CONSTRUCTION CONNECTING TO OR IN THE VICINITY OF THE EXISTING SYSTEM. CONTRACTOR TO REMOVE DEBRIS AND PLUG PRIOR TO OCCUPANCY. 8. ALL MANHOLES COVERS SHALL BE PAINTED TO LOCAL JURISDICTIONAL REQUIREMENTS. WATER NOTES: 1. AS INDICATED, ALL WATERLINES SHALL BE DUCTILE IRON PIPE MEETING THE REQUIREMENTS OF ANSI-AWWA C151 PRESSURE CLASS 350 OR SOFT COPPER TYPE K PIPE PER ASTM B88. IF PVC WATERLINE IS INDICATED ON THE PLANS IT SHALL MEET THE REQUIREMENTS OF AWWA C-900; CLASS 200. 2. ALL WATERLINES SHALL HAVE A MINIMUM OF 3.5 FEET OF COVER. 3. TESTING NOTES: PRESSURE: LEAKAGE SHALL NOT EXCEED THE MAXIMUM ALLOWABLE LEAKAGE SPECIFIED IN AWWA C 600. MINIMUM TEST PRESSURE SHALL BE 150 PSI FOR DOMESTIC AND 200 PSI FOR FIRE PROTECTION. BACTERIOLOGICAL: TWO SAMPLES FOR BACTERIOLOGICAL SAMPLING SHALL BE COLLECTED AT LEAST 24 HOURS APART. IF CONTAMINATION IS INDICATED, THEN THE DISINFECTION PROCEDURE AND TESTING SHALL BE REPEATED UNTIL SATISFACTORY RESULTS ARE OBTAINED. 4. THE CHLORINE IN HEAVILY CHLORINATED WATER FLUSHED FROM MAINS NEEDS TO BE NEUTRALIZED BEFORE DISCHARGE. CONTRACTORS SHALL NEUTRALIZE HEAVILY CHLORINATED WATER FLUSHED FROM MAINS PRIOR TO DISCHARGE OR TRANSPORT ALL HEAVILY CHLORINATED WATER OFFSITE FOR PROPER DISPOSAL. 5. PAINT VALVE COVERS, FIRE HYDRANTS AND OTHER WATER APPARATUS TO MEET THE LOCAL JURISDICTIONAL REQUIREMENTS. SIGNAGE, STRIPING AND MARKING NOTES: 1. ALL INTERNAL SIGNAGE SHALL BE COORDINATED WITH OWNER FOR ACTUAL LOCATION AT TIME OF INSTALLATION. SIGNAGE LEADING ONTO PUBLIC THOROUGHFARE SHALL BE INSTALLED AT RIGHT OF WAY PER DOT STANDARDS 2. ALL PAVEMENT STRIPING (EXCEPT INDIVIDUAL PARKING BAY STRIPING) SHALL BE THERMOPLASTIC REFLECTIVE PAINT. MATERIALS AND DIMENSIONS SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. PARKING BAY STRIPING SHALL BE WHITE REFLECTIVE PAINT. 3. CROSSWALKS SHALL BE CONSTRUCTED OF THERMOPLASTIC MATERIALS AND CONSTRUCTED IN ACCORDANCE WITH STATE DOT SPECIFICATIONS. CONTRACTOR TO INSTALL CROSSWALKS IN SUCH A MANNER THAT CROSSWALKS ARE ALIGNED BETWEEN HANDICAP/WALKWAY ACCESS POINTS OR PERPENDICULAR TO THE ROADWAY / DRIVE LANE. 4. ADA SYMBOLS SHOWN THESE DRAWINGS ARE FOR LOCATION PURPOSES ONLY AND NOT INTENDED TO BE PAINTED. CONTRACTOR RESPONSIBLE FOR INSTALLING ALL REQUIRED ADA SIGNAGE LANDSCAPE NOTES: 1. VERIFY ALL QUANTITIES AND REPORT ANY DISCREPANCIES OR INACCURACIES IN THE PLANS TO THE OWNER'S REPRESENTATIVE PRIOR TO PLANTING. 2. LANDSCAPE WORK SHALL INCLUDE THE FURNISHING, INSTALLATION, AND WARRANTY OF ALL PLANTING MATERIALS WITHIN THE PROJECT AREA. 3. THE LANDSCAPE CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL EXISTING AND NEW UNDERGROUND UTILITIES PRIOR TO EXCAVATION FOR PLANTING. DAMAGES TO UTILITIES CAUSED BY THE LANDSCAPE OPERATION SHALL BE CORRECTED BY THE LANDSCAPE CONTRACTOR AT NO COST TO THE OWNER. 4. LANDSCAPING SHALL REMAIN CLEAR FROM ANY FIRE HYDRANTS ON THE SITE. 5. ALL TREES TO BE A MINIMUM OF 2" IN CALIPER AND MUST MEET THE AMERICAN STANDARD FOR NURSERY STOCK. 6. TREE PROTECTION NOTE: TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 7. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 8. ROOT ZONE PROTECTION AREA: VARIES BASED ON LOCAL JURISDICTION HAVING AUTHORITY. CONTRACTOR SHALL COMPLY WITH LOCAL JURISDICTIONAL REQUIREMENTS. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. 9. SEED BED PREPARATION: ALL AREAS TO BE SEEDED ARE TO BE RECEIVE A MINIMUM OF 2" OF APPROVED TOPSOIL. ALL DEBRIS, ROCKS, ETC. LARGER THAN .5" ARE TO BE REMOVED. ALL LARGE CONCENTRATIONS OF GRAVEL & DEBRIS REGARDLESS OF SIZE ARE TO BE REMOVED PRIOR TO SEEDING OR PLANTING. 10. ALL PLANT BED AREAS ARE TO RECEIVE A MINIMUM OF 6" OF APPROVED TOPSOIL. 11. SOIL SHOULD BE TESTED AND AMENDED WITH LIME AND FERTILIZER FOR HARDWOOD TREES ACCORDING TO NCDA PROCEDURES. SCARIFY PLANT PIT WALLS. CONSULT LANDSCAPE ARCHITECT FOR ALTERNATE COMPLIANCE. 12. SHREDDED HARDWOOD MULCH 3" DEEP EXCEPT AT CROWN OF PLANT UNLESS OTHERWISE NOTED. FLARE AT CROWN SHOULD BE REVEALED. BACKFILL CONSISTS OF THOROUGHLY BROKEN UP NATIVE SOIL. TOTAL VOLUME OF BACKFILL SHOULD BE AMENDED WITH UP TO ONE THIRD PINE BARK MULCH. PIECES SHOULD BE NO LARGER THAN WHAT PASSES THROUGH A ONE INCH SCREEN. IF ADDITIONAL SOIL IS REQUIRED FOR BACKFILL DUE TO DETRIMENTAL SUBSOIL DRAINAGE CONDITIONS, USE SOIL SIMILAR TO EXISTING NATIVE SOIL. ADDITIONAL SOIL TO BE APPROVED BY LANDSCAPE ARCHITECT. MAXIMUM SAUCER HEIGHT IS 6 INCHES. 13. TOP OF ROOTBALL TO BE RAISED 2-3 INCHES ABOVE EXISTING GRADE. 14. FOR B&B PLANTS, NATURAL FIBER BURLAP SHOULD BE TURNED DOWN BY 1/3 TOTAL HEIGHT OF ROOT BALL. PLASTIC FIBER BURLAP AND WIRE BASKETS SHOULD BE REMOVED TO 2/3'S OF TOTAL HEIGHT OF ROOT BALL. 15. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE TREE UPRIGHT AND PLUMB THROUGHOUT THE WARRANTY PERIOD. IF STABILIZATION IS NECESSARY SEE STAKING IN TREE DETAIL, ORANGE FLAGGING TAPE SHOULD BE ATTACHED TO SUPPORT WIRE. STAKING SHOULD BE REMOVED BY CONTRACTOR AT END OF ONE YEAR WARRANTY PERIOD OR AS DIRECTED BY GROUNDS MANAGEMENT. 16. USE STANDARD "GATOR" BAGS FOR WATERING TREES IN AREAS NOT UNDER IRRIGATION. INCORPORATE TERRA -SORB (OR EQUAL) AS PER MANUFACTURERS RECOMMENDATIONS, FOR AREAS NOT UNDER IRRIGATION. 17. USE "BIO-BARRIER" OR EQUIVALENT ACCORDING TO MANUFACTURER'S RECOMMENDATION FOR TREES THAT WILL BE PLANTED WITHIN 10' OF PAVEMENT 18. LANDSCAPING/C.O. STANDARDS NOTE: ALL LANDSCAPING MUST BE IN PLACE PRIOR TO REQUEST FOR A CERTIFICATE OF COMPLIANCE. N �0 a) L 0 x �N _c 0 Q� _c N N Z 0 in co _ rn� rri 1-6 _O K)� L In O O 44 O C 00 N)U NN. www.whnarch.com C U 0 • L U) U ,oliiii !to ` ck R0 `1 , 0 • • • .• • t ¢O Or SEAL 049484 J'ff i:ID BAR° N` 08.25.2022 1(il1JlltttX‘; rig• STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU B E R WASTE WATER Solutions o 0 3 (13 ^ C.L CL X W 0 co • L > ♦ (i) CO nCO HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 4. 5. ---- 6. GENERAL NOTES Sheet Title c-010 WHN ARCHITECTS hereby reserves their common law copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs are not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. U L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C1.00 Existing Conditions Plan.dwg Sep 20, 2022 - 1:57pm G:\Pr NOTES N/F - CONSUS GROUP LLC 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES AND ARE IN D.B. 2739, PG. 231 U.S. SURVEY FEET AND DECIMALS THEREOF, UNLESS OTHERWISE NOTED. P.B. 17 PG. 277 PARCEL 91410 2. ALL AREAS HAVE BEEN COMPUTED BY THE COORDINATE GEOMETRY PIN 4603-22-0619 METHOD. 1041 AIRLIE PKWY. ZONED I-G 3. THIS DRAWING IS NOT INTENDED TO CONFORM TO N.C. GS47-30 AND IS THEREFORE NOT FOR RECORDATION. STEWART 4. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE REPORT AND THEREFORE ALL ENCUMBRANCES UPON THE PROPERTIES MAY NOT BE SHOWN. 5. THE COORDINATE SYSTEM FOR THIS PROJECT IS BASED ON N.C. N.A.D. 83 (N.S.R.S. 2011) AND THE ELEVATIONS ARE BASED ON N.A.V.D. 88. THE INITIAL 101 NORTH TRYON ST, STE 1400 FIRM LICENSE #: C-1051 CHARLOTTE, NC 28202 www.stewartinc.com T 704.334.7925 PROJECT #: G21033 POSITIONS WERE DETERMINED WITH A REAL TIME KINEMATIC GPS UNIT USING THE NORTH CAROLINA GEODETIC SURVEY REAL TIME NETWORK, AND WERE TIED TO THE FOLLOWING NCGS MONUMENT "45 EG 15": Vicinity Map: Not To Scale oPT iMle RD. N: 626282.16' E: 1406964.30' ELEV.: 803.10' 6. THE INITIAL STATE PLANE POSITIONS FOR THIS PROJECT WERE SCALED FROM GRID TO HORIZONTAL GROUND USING THE INVERSE OF A COMBINED GRID FACTOR OF 0.99984532 AT THE LOCATION OF N(Y): 631157.83' U.S. FT., E(X): 1402534.01' U.S. FT. AND ELEVATION OF 806.72' U.S. FT. 7. THE UTILITIES SHOWN HEREON ARE BASED UPON ABOVE -GROUND OBSERVATIONS AND MARKINGS BY STEWART ENGINEERING, INC., ARE TO BE CONSIDERED APPROXIMATE LOCATION, AND ARE SHOWN FOR J PLANNING PURPOSES ONLY. THE LOCATION AND DEPTH OF 11 ' � /(1r ^"� / / UNDERGROUND UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR V4? 1``o) \ 1 I` ft= -' OR OWNER BEFORE BEGINNING ANY DIGGING OR CONSTRUCTION. ' \ Itz- I)j) •- 8. TREES SHOWN HEREON MAY NOT REPRESENT ALL VEGETATION ON THE 1\\\t � / ///// // it 11 SUBJECT PROPERTY. \ //; z D C) v ap m W v z z a; o r / 1 /r ,� / 1 I r f z n _ SITE m RD RUFUs I I i ' / ED NORTH ` / 1 (��/156\ --1------ s�// �151 / t,��-� / A..o �II 6-- �� cr ilitili\w\r(\ --- -N,., i \... _,,59-- / � � 16061. / \\ // \\ �\l /' , ��� l y_i. ^�� �r�r� l ��\�� / % LEGEND ABBREVIATIONS ABBREVIATIONS ,> -�- _-_-16?,OD / / \\\\\\\\\C \��\ _`\ 0 SURVEY CONTROL POINT S �_ J \ \\\\\ �O \`___\\�\ $ SURVEY BENCHMARK �j \\ ,� `_ -0 / / lI r r-S\\\\\\ \\ /,`��\\ Q EIR EXISTING IRON ROD / / � S'I //���\< \\\ • CMF CONCRETE MON FOUND �\ O\,,,‘„, \ \ �- / \\� \\ 12" HDPE MB •I r MAILBOX ��S / INV.=782.21' ~�'����//� \\\\\\� FF FINISHED FLOOR ELEVATION HDPE HIGH DENSITY POLYETHYLENE PVC POLYVINYL CHLORIDE PIPE RCP REINFORCED CONCRETE PIPE TN GS NATIONAL GEODET C SURVEY �\, �\\ /�� //f /--\\\\\\\� O GATE GATE �=� Z� �i_/j/// �/� \\\\\\���1���\� • BOLLARD R/W RIGHT OF WAY DOT DEPARTMENT OF TRANSPORTATION \p \\�� /////- a v SIGN i/% i \ \� \\\\\ �� \8S V% HANDI-CAP SYMB S - // �� / / T TRANSFORMER �O - GRPS / ////'\ 7P LIGHT POLE N/F 11 �\////� % �"� \ \ 12" HDPE TPED -- _��_�_� ///� _ //_ \\ \ \\ INV.=781.82' TEL-COM PEDESTAL I, HUBER TECHNOLOGY INC. ` - ��' �� �_ __ \\\\\\i ����\\\ -% = \ 0M GAS METER D.B. 2761, PG. 880 \ ��'���_ I ( P.B. 17 PG. 277 \\ ,\ ///�/� �- _� - 02, o 1 %/i�l�\ cep\\\\\ J PARCEL 100361 /PIN 4603 21 1754 \ \S \ 4/��l(/,/ X8=���������-_... ��/� )\»\\\\\\\\\\\ (l`\ `` 1 1009 AIRLIE PKWY. \ \ \ (( ��11 ����--�7---//////���////�/�j ZONED I G \ �\ \\\``��\\��\t-....--_-_-_-_-_____.---_---/ /ii�/"'1�/����� \\\, \\ \\11 800, \\\\��-�-'�� -_ ///// v/189 \ o` ' -� RIM=792.15' j// L- \\\\\ \\0 RIM=787.65' INV.=787.18'-IN(S) 10" HDPE / • dr dr. \`\ 1\\- • • • • • .,-,7.:*... I /Jn/ J (//I- J fill � 1 I / wv WATER METER N I WATER VALVE FIRE HYDRANT I' n SEWER CLEANOUT I\ O • EIR (#4 REBAR) S SEWER MANHOLE III ® STORM MANHOLE INV.=783.21'-IN(N) 6" HDPE INV.=787.15' IN(N) 6" HDPE 1 • • '•••••••••••••- " \\�� I\I \ ` /� STORM YARD INLET Title: INV.=783.13'-IN(S) 8 HDPE INV.=787.06'-OUT(E) . •�•_.-< ) •,• • • ••_ `' III \ ® CURB INLET INV.=783.10'-OUT(W) . • • • • • •=•.r-•=�=- 90 • is%• � ///� ' I DESIGN SURVEY FOR: ����/ .• • • • • • • >• ••.�. • •" FLARED ENDSECTION _ �i �� /�� ' ;_• • i i - AIR _ _�_� \! 1 SYSTEM am' TREE LINE =i= ����� • _-; / ;• '= 24" RCP N •, `t & TANK \ . \ �� • • ♦ • ► _ INV.=783.89' CMF (DOT R/W MONUMENT) TBM (#5 REBAR SET) �- /- 4 � � • • • • • • • %"- 10" HDPE ,91,9/' / I �I G UNDERGROUND GAS LINE N:631623.529' _. _�%-.-• • • • • • a • a • i =^� N:631629.943' • E:1401789.136' ! • • • • • !-!!-•=• - ,� \ / / \ I I E UNDERGROUND ELECTRIC LINE n E:1401902.645' ��� gS • • • • � / GRP • %;. RCP EL:780.20' EL:790.53' � �- e /15 RIM=788.90' / RIM=803.90' W UNDERGROUND WATER LINE INV.=799.09'-INN ( ) �_ •. ��,��•r; " ;. _ 0 C cn II .• �; INV.=784.46' IN(S) l INV.=784.42'-IN(W) ® v I T UNDERGROUND TELEPHONE LINE INV.=798.46' OUTS) H U B E R 2` .:. 0 "Ig1� N• /, °• t ' .°. ^°j 10 //,/, / in INV.=783.98'-OUT(N) / // -SS- SANITARY SEWER LINE 7 0, 8S c' �;- . '• '" �. •. :. ♦a 340'Z / " , 4' \ , / I I I - -�0 STORM DRAIN LINE UNABLE TO ACQUIRE SIGNAL OF TECHNOLOGY) Y Q \ °' .. \� /` \I\ ' �" ' ' ° ►' 'J •• // \ �� c -RW- RIGHT WAY ON POWER SERVICE TO •u / 0! ? . 9 1111I "\•* •"• / BUILDING (NO VISIBLE METER) SUBJECT PROPERTY LINE INC. ��II\ : 4, /; / `' ' ��� , UNKNOWN DESTINATION = r 0a0 "" ..4, o �, / •u' t, •p • 1� I Q J U I • "' ."�� ' •� 2-STORY f,. ,`97 /\ ( / ° / I li+ / I `, / / RIM=788.72' INV.=785.13' • EIR (#4 REBAR) �.. II V FF=100.00' FINISH FLOOR ELEV. X 100.00' SPOT ELEVATION 1009 AIRLIE PARKWAY m �� t- \ \ ' • '` 15 RCP ° ° METAL SS GATE ": \ -.: / 1-STORY F� GATE / / I a a '. CONCRETE SURFACE \ i m \ 1 r w METAL BUILDING • • u� ` u nor \ � a = (ib�'' \ �111/ U o Q N / BUILDING ;, o V► • "';• • • S9 '• �'L 411,Z ` �.�.4�� GRAVEL SURFACE ' °• . w .✓� •_`••-_`••-_`� •:� .. s' " FF=792.19' I u.1 \° .. :•d*• ; % " s 1 W w /fo�h�M yl+yN•1+. r '. N�u>�� PUMP STATION AREA TREE (SAPLING) - A.! \ a : • t � :, 4••a ///// 1 �" !+`wM cn TOWN OF DENVER .._ \III ^•'"' � ": •-:' ° �.".. , - FF=792.04'�. 11860, .. - "'�".' //�// ,. Xk , �", C3 BUSH CATAWBA SPRINGS TOWNSHIP 791.41' III .. ° . .�. ` :RAMP . ♦••N. � / II / � LINCOLN NORTH CAROLINA l VCOUNTY, G IIIIII � ( � © C. � _ " � I RIM=784.8T II _,� C:� �- /=`,.,1 T �" ®ICV� �`791II INV.=781.6T-IN(E) IJ� �k 5\ 4 r ( I I � , TBM (#5 REBAR SET) N:631409.130' E:1402530.556' \ INV.-781.57'-OUTS ► �, ( )� \\G.\ ^ b FtGP 15' _792 _ J ► I I EL:801.52'\�� \\ \\ \\ \ \ �� \VA �\ \\rn GRNgS ��r��� \��, \\\ \ \\ \\ '1 \ \ \�,' ,cp O o �9' AS 0 IN I / II ,�g4 ��� / / / 1g5� \ I Q Q � a\\\\\\\\\ DATE: 4-14-2021 SCALE: 1' - 60' CONTOUR INTERVAL 1 FOOT �r1-��� \\\\\\\\\\ \ 1. P(%� ���,.,��� ig.E�t' /W/ ,_.� \�/ �, NCC � � m b allo. Revisions: Date Description \\\\\\�\BASS\\ /�ico ^^j `� 1 5-26-21 ADDRESSED COMENTS ° \ 1111111111 15"RC _RCP J mu4. \ \\\ \ ``\�\ \ \ -�coN _ %//j„���-RIM=807.72occ, id 00 �o qr $0810 ic° \IIIII\,��\ah� > ASPHALT-�_�r�-�_/�/, INV.=795.72'-OUT(S) k� !R� co / /// r^ RIM 79040' \ ( ( INV.-786.32' INN 6" HDP �. ()RIM=790.59'\` �'v x ' 9) ;\ r�°j / / / INV.=786.15'-IN(E) I V -7 7I 1\\\-t_t\ -'�-- \\ \`INV.=786.08' OUTS) INV.-787.36' OUT(W) � INV.=769.19' \\ RIM=790.21' INV.=785.52'-IN(N) EIR REBAR) -- INV.=785.25'-OUT W ( ) Seal: %�,,,►„►►►►►° CAROB °�, (#4 _ EIR REBAR) ��1 (#4 N:631157.83' %%� RIM=786.05' RIM=784.00' INV.=781.97'-IN(E) INV.=780.00'-IN(NW) INV.=781.73'-OUT(W) RIM=787.77' INV.=783.89'-IN(E) INV.=778.71'-IN(NE) INV.=783.64'-OUT(W) INV.=769.61'-OUT(SW) RIM=784.04' N/F INV.=780.28' IN E ( ) UNOX INC. E:1402534.01' THIS GROUND SURVEY WAS PERFORMED AT THE 90% CONFIDENCE LEVEL TO MEET FEDERAL EL:806.72' GEOGRAPHIC DATA COMMITTEE STANDARDS. THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC SURVEY TO THE ACCURACY OF CLASS A AND VERTICAL ACCURACY WHEN APPLICABLE TO THE CLASS A STANDARD, AND THAT THE SURVEY WAS R2o COMPLETED ON 4-9-21; THAT CONTOURS SHOWN ARE AT 1 FOOT INTERVALS; AND ALL S 7S COORDINATES ARE BASED ON NAD 83 AND ALL ELEVATIONS ARE BASED ON NAVD 88. - 8� 6''� .0 c<` : #G •ES S % •••/~,9 • :O� O. O. :' SEAL 7: = �a r� = L-5361 ' %" •: ' Z • ,. •• .•. " • . / •.•••.•• P s` 4,S G s 's A , .4 INV.=780.16'-OUT(SW) D.B. 2615, PG. 798 s� RAC 6S�►►°►►►.►...•• GRAPHIC SCALE P.B. 16 PG. 123 "'o �0 SURVEYOR CERTIFICATE 60 0 30 60 120 PARCEL 91411 G//. `�% PIN 4603-20-2911 �/ CAi0 I, KRIS A. GATH, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY SUPERVISION 987 AIRLIE PKWY. J AND THAT THIS MAP WAS PREPARED FOR THE PURPOSE OF AS-BUILT/TOPOGRAPHIC ( IN FEET) 1 inch = 60ft. ZONED I-G NGS MONUMENT "45 EG 15" STATE PLANE COORDINATES: N:626282.16'°°°°S�g"ed EL:8039604.30's INFORMATION ONLY, AND IS NOT INTENDED TO BE A BOUNDARY SURVEY OF THE PROPERTY SHOWN HEREON. bY: 5/26/2021 Project number: G21033 Date: 4/14/2021 Drawn by: NJB 1 Sheet: OF 1 5s2gF fF�5496..NC PLS L-5361 DATE I Checked by: KAG ects\2021\G21033 - Huber Phase 2 Survey\DWG\G21033-Base.dwg, 5/26/2021 11:21:33 AM, DWG To PDF.pc3 _CU NN co O Cn Cn O Cn a) O MM L 3 0 o 44 -C 00 www.whnarch.com • 0 U� E U �;tSllilt!lr,r • SEAL 049484 r ram, /y f � l ■ F cy 1/,,{'10 BAR° \o. 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 Hu ER WASTE WATER Solutions o Aa• (13 co ri X W 0 c ca Ci) al al n HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 4. 5. ---- EXISTING CONDITIONS PLAN Sheet Title 0-100 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas and designs. These plons, ideas and designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C3.00 Site Plan.dwg Sep 20, 2022 - 1:59pm PROPOSED FIRE HYDRANT (TYP.) SEE DETAIL 1/C-690 PROPOSED HEAVY DUTY CONCRETE 38,553 SF SEE DETAIL 2/C-390 1 PROPOSED BOLLARD (TYP.) SEE DETAIL 3/C-391 SEGMENTAL BLOCK WALL LESS THAN 6' HEIGHT 139 LF SEE DETAIL 5/C-391 1.50' CURB AND GUTTER SEE DETAIL 8/C-390 PROP. LIMITS OF DISTURBANCE NOT TO INFRINGE ON NC HIGHWAY 16 R/W PROPOSED BOLLARD (TYP.) SEE DETAIL 3/C-391 - • \ • m•• d • PROPOSED HEAVY DUTY CONCRETE, 193 SF SEE DETAIL 2/C1--390 u� PROPOSED CURB AND GUTTER SEE DETAIL 8/C-390 10.00' REAR YARD SETBAC EIR (#4 REBAR) 100 I • woo GRASS I I SAND FILTER PROPOSED BOLLARD (TYP.) SEE DETAIL 3/C-391 CONCRETE PAD FOR TANK STORAGE PROP. LIMITS OF DISTURBANCE NOT TO INFRINGE ON STREAM BUFFER PROPOSED STAIRS SEE ARCH. PLANS PROPOSED BOLLARD (TYP.) SEE DETAIL 3/C391 PROPOSED HEAVY DUTY ASPHALT 28,765 SF SEE DETAIL 2/C-390 PROPOSED BUILDING AREA: 124,248 SF CONNECT WALL OF PROPOSED BUILDING TO WALL OF EXISTING BUILDING ° a q31 % 93.81' FROM FACE OF EXISTING BUILDING TO CORNER OF PROPOSED BUILDING 7 FF=792.04' WALL OF EXISTING BUILDING TO REMAIN 1-STORY METAL BUILDING F SPHAI-T W 0 om F W O co 15 PROPOSED PARKING SPACES 1'-6" CURB AND GUTTER SEE DETAIL 8/C-390 BEGIN TRANSITION FROM 1.5' C&G TO 2.5' C&G S69° 32' 38.80"W 225.84' ° • ° ° • • ° • ° a • •° 4 - • d • • • 12'x12' CONCRETE PAD • •a ° FOR TANK STORAGE ° • a " 10'x10' TRANSFORMER PAD • °. a PROPOSED BOLLARD (TYP.) ° SEE DETAIL 3/C-391 10 PROPOSED PARKING SPACES , a • ° ° • PROP. CONCRETE SIDEWALK. SEE DETAIL 5/C-390 10 PROPOSED WHEEL STOP (TYP.) SEE DETAIL 4/C-391 PROPOSED BOLLARD (TYP.) • SEE DETAIL 3/C-391 j a ° • • °° a• a. PROPOSED HEAVY DUTY CONCRETE PAVEMENT 53,171 SF SEE DETAIL 2/C-390 PROPOSED BOLLARD (TYP.) SEE DETAIL 3/C9.31 EXISTING AIR SYSTEM & TANK TO REMAIN 50.00' FROM FACE OF EXISTING BUILDING TO CORNER OF 44.0 PROPOSED BUILDING 2-STORY METAL BUILDING 9 p0' 5.00' / EXISTING TRANSFORMER TO REMAIN FF=792.19' EXISTING 85 PARKING SPACES TO REMAIN 79 PARKING SPACES e. GATE RESTRIPE PARKING 16 PARKING SPACES (10 ADA SPACES, INCLUDING 4 VAN ACCESSIBLE) PROPOSED 1'-6" CURB AND GUTTER SEE DETAIL 8/C-390 _ NM M MN " SECURITY GATE PROPOSED RAISED CURB (TYP.) e6 SEE DETAIL 8/C-390' a ° w EIR (#4 REBAR) EIR (#4 REBAR) PROPOSED STANDARD DUT • ASPHALT, 24,966 SF SEE DETAIL 2/C-390 w EIR (#4 REBAR) II II II II II II 20.00' FRONT SETBACK II I I PROPOSED DRIVEWAY ON NCDOT PUBLIC ROAD REFER TO DETAILS 5 & 6/C-C391 SITE LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE PROPOSED BUILDING PROPOSED HEAVY DUTY CONCRETE PROPOSED HEAVY DUTY ASPHALT PROPOSED LIGHT DUTY ASPHALT PROPOSED CURB & GUTTER PROPOSED ADA PARKING SPACE PROPOSED SEGMENTAL BLOCK WALL PROPOSED WHEEL STOP PROPOSED BOLLARD LIMITS OF DISTURBANCE SEE ARCH. PLANS 2/C-390 2/C-390 2/C-390 8/C-390 9/C-390 2/C-391 4/C-391 3/C-391 N/A : A : ° H/C I I Im • NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND SITE NOTES. SITE DATA PROJECT NAME: SITE ADDRESS: COUNTY: PARCEL PIN #: PARCEL OWNER: PARCEL AREA: CURRENT ZONING: PROPOSED LAND USE: FLOOD PLAIN DATA: RIVER BASIN: MAX BUILDING HEIGHT: PROPOSED BUILDING HEIGHT: PROPOSED BUILDING SQUARE FOOTAGE: TOTAL LIMITS OF DISTURBANCE:: EXISTING IMPERVIOUS AREA: EXISTING IMPERVIOUS REMOVED: PROPOSED IMPERVIOUS AREA: FINAL IMPERVIOUS AREA: PARKING DATA: EXISTING PARKING: EXISTING PARKING REMOVED: PROPOSED PARKING: TOTAL PARKING: HUBER TECHNOLOGY AIRELIE PARKWAY, DENVER, NC 28037 LINCOLN COUNTY 100361 HUBER TECHNOLOGY 20.06 AC I-G WAREHOUSE AND OFFICE ZONE X CATAWBA 60'-0" 39'-0" 139,730 SF 10.99 AC/ 478730 SF 3.26 AC / 142,067 SF 0.71 AC / 30,913 SF 5.97 AC / 260,219 SF 9.24 AC / 402,286 SF 85 SPACES 17 SPACES 120 SPACES 205 SPACES ■ 0 20 40 SCALE: 1 "=40' ■ 80 NORTH N N LO CS) CS) a) a) rr) 00 www.whnarch.com ;.+1 U 0 0 E U U U) F- U SEAS 0494$4 • /,f 4O• BARO�,,.. 08.25.2022 rlrlrllwtit ti�4�;tS1Iilt!lr�r C/476. 17,1 (2, STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU BER WASTE WATER Solutions W Aa• (13 co ri W 0 c ca ■� > }� VJ Ci) a n� HUBER TECHNOLOGY M� 00 N < Z > p I..L Q 0_ U W NJ I� Q0 Z ce Z W a Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 4. 5. ---- SITE PLAN Sheet Title 0-300 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas and designs. These plons, ideas and designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C3.90 Site Details.dwg Sep 20, 2022 - 1:59pm ACCESSIBLE PARKING REQUIREMENTS TOTAL PARKING SPACES PROVIDED MINIMUM NUMBER OF ACCESSIBLE SPACES SPACES REQUIRED MINIMUM NUMBER OF ACCESSIBLE SPACES REQUIRED TO BE VAN ACCESSIBLE 1 TO 25 1 1 26 TO 50 2 1 51 TO 75 3 1 76 TO 100 4 1 101 TO 150 5 1 151 TO 200 6 1 201 TO 300 7 2 301 TO 400 8 2 401 TO 500 9 2 501 TO 1000 2% OF TOTAL 1 IN EVERY 6 ACCESSIBLE SPACES 1001 AND OVER 20 PLUS 1 FOR EACH 100 OVER 1000 1 IN EVERY 6 ACCESSIBLE SPACES REFERENCE: SECTION 1106 OF NC BUILDING CODE NOTES: 1. ALL ACCESSIBLE SIGNS (R7-8P, R7-8, R7-1) SHALL BE MOUNTED AT 7 FEET FROM GRADE TO BOTTOM EDGE OF SIGN FACE (PER MUTCD). MOUNTING HEIGHT CAN BE REDUCED TO 5 FEET IF PLACED IN AN AREA BETWEEN SIDEWALK AND BUILDING FACE IN WHICH PEDESTRIANS ARE NOT EXPECTED TO USE. 2. IF ACCESSIBLE ROUTE IS A RAISED SIDEWALK AREA, THEN RAMPS ARE REQUIRED AT LOADING ZONE AREA. MAINTAIN MIN. 4' WIDE CONTINUOUS PASSAGE. 3. VERTICAL CLEARANCE FOR VANS MUST BE GREATER THAN 98-INCHES. 4. THIS DETAIL IS TO PROVIDE GENERAL GUIDANCE FOR PARKING LAYOUT AND DESIGN; REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) U.S. DEPARTMENT OF TRANSPORTATION AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SUPPLEMENT AND NC BUILDING CODE FOR ADDITIONAL INFORMATION. g ACCESSIBLE PARKING SECTION SIGNAGE (MUST NOT OBSTRUCT ACCESSIBLE ROUTE) PARKING SPACE PAVEMENT MARKINGS ®®©©®© ri 11' 5' VAN ACCESSIBLE SPACE (OPTION 1) VAN ACCESSIBLE RESERVED PARKING MAXIMUM PENALTY $250 0s20-2ze MUTCD R7-8P 12"x6" MUTCD R7-8 12"x18" STANDARD 2'-6" CURB AND GUTTER 1'-6" STANDARD CURB AND GUTTER 1'-6" MEDIAN CURB AND GUTTER TO BE USED IN MEDIANS WHEN LANES ARE SLOPED FROM ISLAND OR AS SPECIFIED BY THE APPROPRIATE CITY ENGINEERING DEPT. $ CONCRETE CURB AND GUTTER SECTION r41 8' VAN ACCESSIBLE SPACE (OPTION 2) NO PARKING ANY TIME OPTIONAL ACCESIBLE LOADING ZONE SIGN 1/8" RADIUS r*1 MUTCD R7-1 12"x18" 0 ACCESSIBLE ROUTE (SEE NOTE 2) NOTE: ONE OUT OF EVERY SIX (6) ACCESSIBLE SPACES. BUT NOT LESS THAN ONE, IS REQUIRED TO BE VAN ACCESSIBLE, PER SECTION 1106.5 OF NC STATE BUILDING CODE RESERVED PARKING MAXIMUM PENALTY $250 GS20-azs SIDEWALK 1/4" R MUTCD R7-8 12"x18" NOT TO SCALE TOP OF CURB 2" R. BATTER 1" ON 6" 1`6"� NTS SLOPE NOTE CURB TO BE CONSTRUCTED IN 10 FOOT LENGTHS. 6" RAISED CURB NTS U311fO ❑Md 8Hf10 02SOdOFid 03 HO1 ONIMVFIO ❑UVONd1S HSI1ON3 SHEET 1 OF 3 848.05 4' x 4' LANDING 3"R DROP CURB (STD. 2'-8" CURB & GUTTER SHOWN) A UTILITY STRIP 2' DETECTABLE 0.02 WARNING DOMES 1 0.08 MAX. MIN. /-0.04 NORM.) X SECTION B-B SIDEWALK 5' MIN. ELEVATION/ I CURB TRANSITION P VARIABLE SLOPES NOT TO EXCEED 10:1 ISOMETRIC VIEW PAY LIMITS FOR CURB RAMP NOTES: 1. DETECTABLE WARNING DOMES WILL COVER 2'-0" LENGTH AND FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAILS. 2. DETECTABLE WARNING DOMES WILL CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK, OR DARK -ON -LIGHT SEQUENCE COVERING THE ENTIRE RAMP. 2' 0" LENGTH RAMP WIDTH AREA IS VARIABLE BASE DIAMETER O O O O 0 ^/ 0.9"R TO 1.40"R TOP DIAMETER OF NO LESS 5 O O O O O THAN 6% %S TO NO MORE THAN 50OF THE BASE DIAMETER DETECTABLE WARNING DOMES W A W+A+9" X B 5' 0.0' 5.8' 5.8' 5.0'* 6' 0.0' 6.8' 6.8' 6.0'** 7' 0.0' 7.8' 7.3' 6.5'** 8' 0.0' 8.8' 7.3' 6.5'** 5' 2.0' 7.8' 7.8' 5.0' 5' 2.5' 8.3' 8.1' 4.8' 5 3.0' 8.8' 8.3' 4.4' 5' 3.5' 9.3' 8.4' 4.1' 5' 4.0' 9.8' 8.6' 3.8' 5' 4.5' 10.3' 8.7' 3.4' 5' 5.0' 10.8' 8.9' 3.1' B = X-(A+9") B = DISTANCE FROM FRONT EDGE OF SIDEWALK TO BACK POINT OF 12:1 (8.33%) SLOPE. * BACK OF SIDEWALK DROP REQUIRED FOR ALL SIDEWALK SLOPES. ** BACK OF SIDEWALK DROP REQUIRED FOR SIDEWALK SLOPES 0.04. 4' MIN. DROP CURB W SIDEWALK (5' STD.) B 0.02 (NORM.) 5' MIN. ON 1TOP OF TRANSITI CURB \CURB GUTTER SECTION A -A 4' X 4' CLEAR SPACE MU T FALL WITHIN CROSSWALK LIMITS. (SEE NOTE 10) 2' MIN. CURB BETWEEN RAMPS SIDEWALK 4" 4' MIN. NOTE: A PORTION OF ONE OR BOTH RAMPS MAY EXTEND OUTSIDE THE RETURN. PLAN VIEW DUAL RAMPS ANY RADII (4' MIN. FLOOR WIDTH) EXPANSION JOINT (SEE STD. 848.01) EXPANSION JOINT (SEE STD. 846.01)/ SIDEWALK O co mccmo LLOJ35 O O =F-lZ 2 z LLi Q U I- 0 H (01- O J 000 z 1-1 = N H H T CL 1 w 0 ENGLISH STANDARD DRAWING FOR CURB RAMP PROPOSED CURB AND GUTTER SHEET 1 OF 3 848.05 E7 CURB RAMP (1/3) SECTION NTS C D /-) A R7-8P DIMENSIONS (INCHES) A B C D E F G H J K L 12 6 3/8 3/8 1-1/2 1-1/2D 1/2 1D 2-1/2 4 1-1/2 " INCREASE SPACING 50% D-FHWA (FEDERAL HIGHWAY ADMINISTRATION/USDOT) SERIES D LETTERS LEGEND AND BORDER - GREEN BACKGROUND - WHITE ACCESSIBLE SIGNAGE D- 0 VAN ACCESSIBLE RESERVED PARKING MAXIMUM PENALTY $ 250 SECTION SIGN R7-8P SIGN R7-8 rFINISHED GRADE NOT TO SCALE NTS )I1VM3OIS 313HONOO 1iO3 ONIMVHO O8b'ONV1S HSI1ON3 SHEET 1 OF 1 848.01 NOTES: CONSTRUCT STANDARD SIDEWALK 5' WIDE AND 4" THICK UNLESS OTHERWISE DENOTED ON PLANS. PLACE A GROOVE JOINT 1" DEEP WITH 113" RADII IN THE CONCRETE SIDEWALK AT 5' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 50' INTERVALS. A Y2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. SEE STD. DWG. 848.05 FOR WHEELCHAIR RAMP LOCATION REQUIREMENTS AND CONSTRUCTION GUIDELINES. 1/8" RAD JOINT SEALER SURFACE OF SIDEWALK " EXPANSION JOINT (SEE STD. 846.01) o. 'u. P. o• o. o. 1/2" JOINT WIDTH.1._ T = SIDEWALK THICKNESS JOINT FILLER TRANSVERSE EXPANSION JOINT IN SIDEWALK BUILDING, WALL, ETC. SIDEWALK INTERVALS " EXPANSION JOINT " EXPANSION JOINT CONCRETE SIDEWALK CROSSWALK 50y-0" INTERVALS SIDEWALK 11'" EXPANSION JOINT (SEE STD. 846.01) PLAN VIEW FILL 3, " WIDE x 1" DEEP GROOVED OR 1/8" RAD SAWN JOINT WITH JOINT SEALING COMPOUND 1/8" RAD -'c'CONC. PAVEMENT DETAILS SHOWING JOINTS IN CONCRETE SIDEWALK Oc 1-1} ¢¢ OOc= CC w¢LL= 10=O0 f1-1 1-2- CO1-0_1 w 0CC oCI) cc _ z •> N F-I T w 0 ENGLISH STANDARD DRAWING FOR CONCRETE SIDEWALK SHEET 1 OF 1 848.01 CONCRETE SIDEWALK SECTION NTS U311f9 aNb' 8Hf10 O3SOdOHd c') C co ENGLISH STANDARD DRAWING FOR SHEET 2 OF 3 848.05 G,9 9y SIDEWALK STOP LINE SEE NOTE 12 SEE Z NOTE 3 OD O SEE NOTE 4 SIDEWALK 4'-0" (TYP) SEENOTE 10 - SIDEWALK ■ DETAIL SHOWING TYPICAL LOCATION OF CURB RAMPS. PEDESTRIAN CROSSWALKS AND STOP LINES FOR TEE INTERSECTIONS ROADWAY PLAN SYMBOL FOR PROPOSED CURB RAMP `- 9 SIDEWALK SEE NOTE 10 STOP LINE SIDEWALK SEE NOTE 4 SEE NOTE 12 SIDEWALK 4'-O" (TYP) 4141 I , SIDEWALK DETAIL SHOWING TYPICAL LOCATION OF CURB RAMPS. PEDESTRIAN CROSSWALKS AND STOP LINES PROPOSED CURB RAMP W/ LANDING ��� PROPOSED OR FUTURE SIDEWALK ALLOWABLE LOCATIONS DUAL RAMP RADII ANY ENGLISH STANDARD DRAWING FOR ♦Y V PROPOSED CURB AND GUTTER SHEET 2 OF 3 848.05 CURB RAMP (2/3) SECTION NTS 12" M4\XDMUM � NALTY 250 G520-37.6 NOTE: SUPPLEMENTAL VAN ACCESSIBLE SIGN (R7-8P) USED IF THERE IS ONLY ONE REQUIRED ACCESSIBLE PARKING SPACE (MUST BE VAN ACCESSIBLE) AND AT EACH ADDITIONAL REQUIRED VAN ACCESSIBLE SPACE. -3/8" (TYPICAL) -*-3/8" (TYPICAL) LEGEND AND BORDER - GREEN BACKGROUND - WHITE SIGN APPROVED FOR USE UNDER GENERAL STATUTE 20-37.6 THIS PENALTY SIGN IS REQUIRED TO ACCOMPANY ALL R7-8 PARKING SIGNS ERECTED AFTER DECEMBER 31,1990 3 ACCESSIBLE SIGNAGE SECTION JOINT SEALENT, FINISHED 1/8" BELOW FLUSH AT PVMT SURFACE 5/8"m x 30" SMOOTH BAR 24" OC., PAINT, GREASE AND CAP ONE END TYP, VAN ACCESSIBLE MAXIMUM PENALTY $ 250 GS20-37.6 CONSTRUCTION JOINT W/ DOWELING JOINT FILLER PAVEMENT SECTION WELDED WIRE MESH 0.0°0°0 °°0 0.0°O°0 °°0 0 °0 0°°0 0 °0 0 00°0000° 0000000° 0 �'0° Oo0° 0 00° 0 -1 II=1 MIMI HIMI I Ill 1 1= III SIGN R7-8P SIGN R7-8 FINISHED GRADE EXPANSION JOINT W/ DOWELING (TYP. AT ALL EXPANSION JOINTS) 4 )-6n0-60-60-60-60-oOC Th O n(Vg nQ-, nO r -CONCRETE ABC - COMPACTED SUBGRADE (95% STD. PROCTOR W/ TOP 24" AT 100%) NOT TO SCALE PAVEMENT TYPE ABC REINF. CONCRETE HEAVY DUTY 9" 1 ROW - 6X6X10/10 WELDED WIRE MESH ON CHAIRS 6" CONCRETE PAVEMENT SHALL BE CONSTRUCTED OF 4000 PSI CONCRETE. REINFORCEMENT SHALL BE AS INDICATED ABOVE. SURFACE FINISHES AND JOINT TO SCALE SHALL BE AS INDICATED ON PLANS AND DETAILS. 'HEAVY DUTY CONCRETE PAVING' 1.5" ASPHALT CONCRETE SURFACE COURSE - TYPE S9.5B 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE - TYPE 119.0E 8" AGGREGATE BASE COURSE (COMPACTED TO 95% MODIFIED PROCTOR) o� O 0 (Doc°Q°9)O�o4�8 oQ�.1v0g 0 005 09Dg 800°0600� 800°00 0000 OOD 00 0 00 000 0 00 000 IIIII - IIIII - IIIII - IIIII - 11111 - 1111 11111 11111 11111-11111 111111111 COMPACTED SUBGRADE (95% STD. PROCTOR W/ TOP 24" AT 100%) 'HEAVY DUTY ASPHALT PAVING' 2 PAVEMENT SCHEDULE SECTION 2.0" ASPHALT CONCRETE SURFACE COURSE - TYPE S9.5B 6" AGGREGATE BASE COURSE (COMPACTED TO 95% MODIFIED PROCTOR) o ,t �oO�oo°0 „° �oboq��oO�o�o4�0 00, ocbB�Oo�oD8;e0°00"09D3;0°00 000 0 00 00 o 00 000 0 00 000 11111 11111 111 11111ggg11111 COMPACTED SUBGRADE (95% STD. PROCTOR W/ TOP 24" AT 100%) 'LIGHT DUTY ASPHALT PAVING' NTS NTS O m SdWVH Ban3 Fi03 ONIMVUO OHb'ONV1S HSI1ON3 SHEET 3 OF 3 848.05 NOTES: 1. CONSTRUCT THE RAMP SURFACE TO BE STABLE, FIRM, AND SLIP RESISTANT. CONSTRUCT THE CURB RAMP TYPE AS SHOWN IN THE PAVEMENT MARKING PLANS OR AS DIRECTED BY THE ENGINEER. 2. LOCATE CURB RAMPS AND PLACE PEDESTRIAN CROSSWALK MARKINGS AS SHOWN IN THE PAVEMENT MARKING PLANS. WHEN FIELD ADJUSTMENTS REQUIRE MOVING CURB RAMPS OR MARKINGS AS SHOWN, CONTACT THE SIGNING AND DELINEATION UNIT OR LOCATE AS DIRECTED BY THE ENGINEER. 3. COORDINATE THE CURB RAMP AND THE PEDESTRIAN CROSSWALK MARKINGS SO A 4'x4' CLEAR SPACE AT THE BASE OF THE CURB RAMP WILL FALL WITHIN THE PEDESTRIAN CROSSWALK LINES. 4. SET BACK DISTANCE FROM INSIDE CROSSWALK MARKING TO NEAREST EDGE OF TRAVEL LANE IS 4' MINIMUM. 5. REFER TO THE PAVEMENT MARKING PLANS FOR STOP BAR LOCATIONS AT SIGNALIZED INTERSECTIONS. IF A PAVEMENT MARKING PLAN IS NOT PROVIDED, CONTACT THE SIGNAL DESIGN SECTION FOR THE STOP BAR LOCATIONS OR LOCATE AS DIRECTED BY THE ENGINEER. 6. TERMINATE PARKING A MINIMUM OF 20' BACK OF A PEDESTRIAN CROSSWALK. 7. CONSTRUCT CURB RAMPS A MINIMUM OF 4' WIDE. 8. CONSTRUCT THE RUNNING SLOPE OF THE RAMP 8.33% MAXIMUM. 9. ALLOWABLE CROSS SLOPE ON SIDEWALKS AND CURB RAMPS WILL BE 2% MAXIMUM. 10. CONSTRUCT THE SIDE FLARE SLOPE A MAXIMUM OF 10% MEASURED ALONG THE CLIRB LINE. 11. CONSTRUCT THE COUNTER SLOPE OF THE GUTTER OR STREET AT THE BASE OF THE CURB RAMP A MAXIMUM OF 5% AND MAINTAIN A SMOOTH TRANSITION. 12. CONSTRUCT LANDINGS FOR SIDEWALK A MINIMUM OF 4'x4' WITH A MAXIMUM SLOPE OF 2% IN ANY DIRECTION. CONSTRUCT LANDINGS FOR MEDIAN ISLANDS A MINIMUM OF 5'x5' WITH A MAXIMUM SLOPE OF 2% IN ANY DIRECTION. 13. TO USE A MEDIAN ISLAND AS A PEDESTRIAN REFUGE AREA, MEDIAN ISLANDS WILL BE A MINIMUM OF 6' WIDE. CONSTRUCT MEDIAN ISLANDS TO PROVIDE PASSAGE OVER OR THROUGHT THE ISLAND. 14. SMALL CHANNELIZATION ISLANDS THAT CAN NOT PROVIDE A 5'X5' LANDING AT THE TOP OF A RAMPS, WILL BE CUT THROUGH LEVEL WITH THE SURFACE STREET. 15. CURB RAMPS WITH RETURNED CURBS MAY BE USED ONLY WHERE PEDESTRIANS WOULD NOT NORMALLY WALK ACROSS THE RAMP. THE ADJACENT SURFACE IS PLANTING OR OTHER NON -WALKING SURFACE OR THE SIDE APPROACH IS SUBSTANTIALLY OBSTRUCTED. 16. PLACE A 1/2" EXPANSION JOINT WHERE THE CONCRETE CURB RAMP JOINS THE CURB AS SHOWN IN ROADWAY STANDARD DRAWING 848.01 17. PLACE ALL PEDESTRIAN PUSH BUTTON ACTUATORS AND CROSSING SIGNALS AS SHOWN IN THE PLANS OR AS SHOWN IN THE MUTCD. 18. CURB RAMPS THROUGH MEDIAN ISLANDS, SINGLE RAMPS AT DUAL CROSSWALKS OR LIMITED R/W SITUATIONS, WILL BE HANDLED BY SPECIAL DETAILS. CONTACT THE CONTRACT STANDARDS AND DEVELOPMENT UNIT FOR THE DETAILS OR FOR A SPECIAL DESIGN. ENGLISH STANDARD DRAWING FOR CURB RAMPS w I- 0 z SHEET 3 OF 3 848.05 44 CURB RAMP (3/3) SECTION NTS N ;o O N 1._ 00 /) N ( CD 0 a) • _O L 0 0 V)r CD N N LO CC) a7 0 0) r7 r7 Mom) 00 www.whnarch.com C U 0 U) E U U U) F- U ;��i11LI11l�r17 �:N C/# `� 4. 71 of f{-.0 BAR 0,`�, 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 13 WASTE WATER Solutions 0 CZ C(3 0 al al HUBER TECHNOLOGY 00 CN LLI ce Lij Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 4. SITE DETAILS Sheet Title C-390 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Controctors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C3.90 Site Details.dwg Sep 20, 2022 - 1:59pm *5'-0" I *SIDEWALK 1 (OPTIONAL) DISSIPATE CURB I BETWEEN THESE LIMITS RADUIS 3'-0" OR AS SHOWN ON PLANS DRIVEWAY TURNOUT EXPANSION JOINT 2" DEEP SAW CUT EXISTING DRIVEWAY PAVEMENT PAVEMENT METHOD OF TIE IN WHEN EXISTING DRIVEWAY PAVEMENT IS CONCRETE, SAW CUT 2" DEEP JOINT AT THE POINT OF TIE-IN. SAW JOINT PERPENDICULAR TO EDGE OF EXISTING DRIVEWAY PAVEMENT. BUILD THIS PORTION OF DRIVEWAY PAVEMENT ONLY AT LOCATIONS WHEN DIRECTED. WIDTH OF DRIVEWAY STREET PAVEMENT-1 ti �► C PLAN DETAIL OF DRIVEWAY * SIDEWALK I (OPTIONAL) I DISSIPATE CURB BETWEEN THESE LIMITS I2 OF 2 FOR DRIVEWAY GRADES) * SIDEWALK TAPERS DOWN 5' BACK FROM DRIVEWAY. RADIUS 3'-0" OR AS SHOWN ON PLANS EXPANSION JOINT VARIABLE (SEE SHEET VARIABLE 6" 2'-0 � 2" 2 -6 /RADIUS 3'-0" OR AS SHOWN ON PLANS DRIVEWAY TURNOUT / BUILD THIS PORTION OF DRIVEWAY PAVEMENT ONLY AT LOCATIONS WHEN DIRECTED. SECTION C-C PROPOSED PAVEMENT Ow Q Q O O O 2 U cc = QUccOO- H I 0OCA= z j T w r 0 ROADWAY STANDARD DRAWING FOR DRIVEWAY TURNOUT RADIUS TYPE SHEET 1 OF 2 848.02 6 DRIVEWAY TURNOUT - RADIUS TYPE SECTION NTS DESIRABLE DRIVEWAY GRADES BERM 6" A B 5'-0" 5'-0" 5'-0" *+2% GRADE WHEN THIS IS SIDEWALK LOCATION * +2% GRADE WHEN THIS IS SIDEWALK LOCATION ROADWAY PAVEMENT 6" *SIDEWALK LOCATION (DO NOT PLACE SIDEWALK ON BERMS LESS THAN 6' WIDE.) 6" A *+2% GRADE WHEN THIS IS SIDEWALK LOCATION ROADWAY PAVEMENT +15% OR FLATTER - +8% OR FLATTER - +15 °o_OR FLATTER - 2 % OR FLATTER 8 % OR FLATTER -15 % OR FLATTER DESIRABLE OR MAXIMUM DRIVEWAY GRADES BERM WIDTH A B DIST. GRADE DIST. GRADE 8' OR LESS 5'-0" +2%* 2'-6" +5% 8' OR LESS 2'-0" +6% 5'-6" +2%* 10' 4'-0" +4% 5'-6" +2%* 12' & OVER 4'-6" +4% 7'-0" +2%* MAXIMUM DRIVEWAY GRADES BERM B * +2% GRADE WHEN THIS IS SIDEWALK LOCATION 5'-0" 5'-0" 5'-0" ROADWAY STANDARD DRAWING FOR DRIVEWAY DRIVEWAY GRADES SHEET 2 OF 2 848.02 DRIVEWAY TURNOUT GRADES SECTION #5 REBAR - 18" MIN. LENGTH 9" 4' 1' 6' PLAN ELEVATION WHEEL STOP \\\\, \\, \\\\, \\\\\ \:;\,; TI\\\ ` ALTERNATING BLACK AND WHITE STRIPES #5 REBAR -18" MIN. LENGTH (TYPICAL) 2 #4X5'9" SECTION NTS / FINISH GRADE NTS BASE 8" DIA. SCH. 40 STEEL PIPE — FILL W/CONC. PAINTED SAFETY YELLOW 24" DIA. �\O I I I 4000 PSI CONCRETE 3 STEEL PIPE BOLLARD SECTION VARIES TO 30" MAX. NOTE: DOWEL UNITS AS PER MANUF. AND PIN FABRIC TO UNITS iTil' i iiTiiTii i i iiTi 1 li 6" _ 4 CROWN CONCRETE AT TOP OF PIPE O PAVEMENT OR TOP OF CURB d CO f =III_ 1111 /— 12" PRECAST CAPSTONE ADHERED TO TOP UNIT AS PER MANUF. 6" x12" PRECAST CONC. UNITS FINISHED GRADE I—d III —III —I I \— 3"-4" OF MULCH III-111-1 I-1 I 1=1 III =III =I I I= 2' 2'-0-0' MI " MIN IIIIIIIII 12" AGG. BACKFILL SOIL BACKFILL NTS NOTE: THE SITE CONTRACTOR IS RESPONSIBLE FOR CONTRACTING WITH A PROFESSIONAL ENGINEER TO DESIGN THE RETAINING WALLS SHOWN ON THESE PLANS. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SELECT BACKFILL NEEDED TO PROPERLY BACKFILL THE RETAINING WALLS, AS DESIGNED BY THE PE. FABRIC SEPARATOR, IF REQ. 4"0 DRAIN PIPE WRAPPED IN FILTER FABRIC; PIPE PLACED ENTIRE LENGTH OF WALL PREPARED SUBGRADE 6" AGG. BASE THE OWNER IS REQUIRED TO ENGAGE INSPECTION AND TESTING SERVICES, INCLUDING INDEPEDENT TESTING LABORATORIES, TO PROVIDE QUALITY ASSURANCE AND TESTING SERVICES THROUGHOUT THE CONSTRUCTION OF ALL RETAINING WALLS. TESTING AND INSPECTIONS SERVICES SHALL ONLY BE PERFORMED BY QUALIFIED AND EXPERIENCED TECHNICIANS AND ENGINEERS. AS A MINIMUM, QUALITY ASSURANCE TESTING SHOULD INCLUDE FOUNDATION SOIL INSPECTION, SOIL BACKFILL TESTING, VERIFICATION OF DESIGN PARAMETERS, AND OBSERVATION OF CONSTRUCTION FOR GENERAL COMPLIANCE WITH DESIGN DRAWINGS AND SPECIFICATIONS. K2) SEGMENTAL BLOCK WALL PLAN BACK OF CURB 2'-6" CURB AND GUTTER NTS CONTRACTION JOINT SEE STD. 10.17B GENERAL NOTES 1'-6" CURB �.... LIP OF GUTTER/EDGE OF PAVEMENT ........................................... ............................ El) CSEUCTRIOBTRANSITION N 10' 0" PLAN VIEW 10' 0" ................... NOTES: 1. TRANSITION TO BE ALONG BACK OF CURB. AND GUTTER NTS N ;O a) W 00 0 X 0 N U) r 0 12 9 _C U N N 0 LO CO CS) CY) (6CY)a) •+ �17 O 0 44 ror 00 www.whnarch.com cn F- U U 0 U) E U U .0111 llllrrJ SEAL 049484. /, 40 BAR° ,\ 08.25.2022 '1/011111,- STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU B E R WASTE WATER Solutions HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 4. 5. ---- SITE DETAILS Sheet Title 0-391 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas and designs. These plons, ideas and designs ore not to be reproduced, changed or copied in any form or monner whotsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2Bldg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C4.00 Erosion Control Plan.dwg Sep 20, 2022 - 1:59pm GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality BLAB XVICR army IOW ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER raft IA.AT= AIEIIOO M MLR • TIC NfElr WONT SI■CT■Lr OOL t IM■TMIO WIOI TIC MUM MOM mm woe 7O Or TIC 111111CTIACI CAPACITY. Omni[ WMriT SLO:T■■ KEN TO it 6iMY MIMI WITH ORM E I■ MO SVfl BELOW GRAii r UT STRUCTURE 31010.02 mv7 OR STIP= CLOW WAX COWL 1■f•■ RMQ anew MU I I BLAB LitATOI ra.O r1 • TIC COMER WATOIF n■CIIOLT f WLL = 10 0M0 MO TIC LOU IMAM AO W OO 71X Or T[ i1MCI1RT 1MILITT TO Mw■E MBMR IMAM CMItlIY Ian. A maul ■ ROCS Or n®T L NEM TOSLIME X= ABOVE GRA� IIT STRI ICTI IRE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. 2. 3. Create designated hazardous waste collection areas on -site. Place hazardous waste containers under cover or in secondary containment. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Inspection records must Include: Self -inspections below. When adverse personnel to be in which it is safe to greater than 1.0 performed upon were delayed shall Inspect are required during weather or jeopardy, the inspection perform the inspection. inch occurs outside the commencement be noted in the Frequency (during normal business hours) (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no dairy rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division, (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the Inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit (6) Ground stabilization measures NOTE: The rain After each phase of grading inspection resets 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. the required 7 calendar day inspection requirement. Ai ' NORTH CAROLINA k R:01 Environmental Quality SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be documented in the manner 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements far all E&SC Measures have been performed. e Corrective actions have been taken { } to E&SC Measures. Initial and date a copyof the approved E&SC pp Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence (a) Visible sediment deposition in a stream or wetland (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above Reporting • • • • Timeframes (After Discovery) and Other Requirements Within 24 hours, an oral or electronic notification. Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that may endanger noncompliance, and its causes: the period of noncompliance, including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 NPDES Stormwater Discharge Permit for Construction Activities (NCGO1) NCDENR/Division of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) STABILIZATION SITE AREA DESCRIPTION TIMEFRAME EXCEPTIONS 7 days None Perimeter dikes, swales, ditches, slopes High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 N 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. _ Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. SEEDING PREPARATION: EROSION CONTROL NOTES: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONED, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY ALL AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW). 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM 4 TO 6 INCHES DEEP SEEDBED IS PREPARED. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESENDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED , REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESENDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 50% DAMAGED , REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES AND LANDSCAPING PLANS. 10. SEE LANDSCAPING PLANS FOR PERMANENT SEEDING, MULCHING, AND FERTILIZING RATES. ALL AREAS NOT DESIGNATED TO RECEIVE PLANTS SHALL BE SEEDED PER THE LANDSCAPING PLANS. TEMPORARY SEEDING PREPARATION: CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE ADMIXTURE BELOW). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES (MAX 3:1) DATE AUG 15 - NOV 1 TALL FESCUE NOV 1 - MAR 1 MAR 1 - APR 15 APR 15 - JUN 30 JUL 1 - AUG 15 SLOPES (3:1 TO 2:1) DATE MAR 1 -JUN 1 (MAR 1 - APR 15) JUN 1 - SEP 1 SEP 1 - MAR 1 TYPE TALL FESCUE & ABRUZZI RYE TALL FESCUE HULLED COMMON BERMUDAGRASS TALL FESCUE ***BROWNTOP MILLET ***OR SORGHUM-SUDAN HYBRIDS TYPE ***BROWNTOP MILLET ADD TALL FESCUE OR ADD HULLED COMMON BERMUDAGRASS ***TALL FESCUE AND ***BROWNTOP MILLET ***OR SORGHUM-SUDAN HYBRIDS ANNUAL RYE AND TALL FESCUE ADD ABRUZZI RYE PLANTING RATE 300 LBS/ACRE 300 LBS/ACRE 25 LBS/ACRE 300 LBS/ACRE 25 LBS/ACRE 120 LBS/ACRE 35 LBS/ACRE 30 LBS/ACRE PLANTING RATE 50 LBS/ACRE 120 LBS/ACRE (MAR 1 - JUN 30) 25 LBS/ACRE 120 LBS/ACRE 35 LBS/ACRE 30 LBS/ACRE 70 LBS/ACRE 120 LBS/ACRE (NOV 1 - MAR 1) 25 LBS/ACRE CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. 1. REFER TO C0.10 FOR GENERAL NOTES. 2. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN BEST LOCATION BASED ON FIELD CONDITIONS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CONSTRUCTION ENTRANCES AS NECESSARY TO PREVENT THE TRACKING OF SEDIMENT OFF -SITE. THE OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION IS COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED. 5. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). 6. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR AND ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 7. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE LIMITS OF DISTURBANCE (L.O.D.) SHALL BE PERMITTED. THE L.O.D. SHALL BE MAINTAINED BY THE ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 8. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 9. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.). 10. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE MAINTAINED BY THE CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT. COPIES OF THE WRITTEN INSPECTION REPORTS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE TWICE PER WEEK AND AFTER RAINS OF GREATER THAN 0.5". RAIN GAUGE REQUIRED ON SITE. 11. ANY AREAS OF EXPOSED SOILS THAT WILL NOT BE DISTURBED FOR FOURTEEN DAYS SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY EIGHT (48) HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE A MINIMUM THICKNESS OF 2 TO 3 INCHES. 16. INTERIM SLOPES MAY BE GRADED TO A MAXIMUM SLOPE OF 2:1 (HORIZONTAL: VERTICAL); CUT SLOPES SHALL BE LIMITED TO A MAXIMUM SLOPE OF 1.5:1. 17. THE SURFACE OF AREAS SLOPES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL THAT ARE TO RECEIVE INTERIM FILL SHALL BE PLOWED, FURROWED, TILLED OR BROKEN UP PRIOR TO PLACING FILL SO THAT FILL MATERIAL WILL BOND WITH EXISTING . " SURFACE. INTERIM FILL SHALL BE PLACED AS SPECIFIED FOR PERMANENT FILLS AND IN LIFTS NOT GREATER THAN 6". 18. PROVIDE DUST CONTROL MEASURES INCLUDING, BUT NOT LIMITED TO, WETTING DOWN TO CONTROL DUST ON SITE, IN ORDER TO PREVENT ANNOYANCE/AND OR DAMAGE TO ADJACENT SITES. CALCIUM CHLORIDE OR ANY OTHER CHEMICAL MATERIAL MAY NOT BE USED ON SUBGRADES OF AREAS TO BE SEEDED OR PLANTED. 19. SEDIMENT LADEN RUNOFF FROM EXCAVATIONS SHALL NOT BE PUMPED DIRECTLY TO STORM DRAINAGE. 20. INSPECTOR REFERS TO LOCAL JURISDICTIONAL (NCDENR OR LOCAL) LAND QUALITY INSPECTOR OR HIS REPRESENTATIVE. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE INSPECTOR. 21. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL. 22. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE PERSON RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES IS REQUIRED TO INSPECT THE PROJECT AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131 TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM HTTP://WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML ADMIXTURES: TREE PROTECTION NOTES: AGRICULTURAL LIMESTONE: 2 TONS/ACRE FERTILIZER: 1,000 LBS/ACRE - 10-10-10 SUPERPHOSPHATE: 500 LBS/ACRE - 20% ANALYSIS MULCH: 2 TONS/ACRE - SMALL GRAIN STRAW ANCHOR: ASPHALT EMULSION AT 300 GALS/ACRE 1. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. OR OBTAIN A GRADING PERMIT THEN TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE 2. TREE PROTECTION FENCING SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 3. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE Date: Page: TEMPORARY SEEDING FOR LATE WINTER Seeding Mixture Species Rye (grain) Annual lespedeza Piedmont and Coastal Korean in Mountains) Omit annual lespedeza temporary cover is not Seeding Dates Mountains -Above 2500 Below 2500 Piedmont -Jan. 1 - May Coastal Plain 1 RECOMMENDATIONS AND EARLY SPRING Rate (lb/acre) 120 (Kobe in 50 Plain, when duration of to extend beyond June. feet: Feb. 15 - May 15 feet: Feb. 1- May 1 1 - Apr. 15 Anchor straw by or a mulch with blades set nearly a mulch anchoring tool. not fully adequate. mulch immediately damage. TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER Seeding Mixture Rate Species Ib/acre p ( ) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding Dates Mountains -May 15 - Aug. 15 Piedmont -May 1 - Aug. 15 Coastal Plain -Apr. 15 - Aug. 15 Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. TEMPORARY SEEDING RECOMMENDATIONS FOR FALL Seeding Mixture Species Rate (lb/acre) Rye (grain) 120 Seeding Dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont -Aug. 15 - Dec. 31 Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. -Dec. Mulch Apply 4,000 lb/acre straw. tacking with asphalt, netting, anchoring tool. A disk straight can be used as Maintenance Refertilize if growth is Reseed, refertilize and following erosion or other LIMING- Apply lime according to soil test recommendations. If the pH coarse -textured soils and 2-3 tons/acre on fine -textured soils is higher need not be limed. FERTILIZER- Base application rates on soil tests. When these are the top 4-6 inches of soil. If a hydraulic seeder is used, do not SURFACE ROUGHENING- If recent tillage operations have resulted surface to become sealed or crusted, loosen it just prior to seeding surface with a loosen uniformly fine texture. All ridges and depressions finished grades are obtained and seedbed preparation is completed. SEED BED PREPARATION: agricultural limestone at the rate of 1 to 1 z tons/acre on into the top 4-6 inches of soil. Soils with a pH of 6 or lb/acre. Both fertilizer and lime should be incorporated into except to break up large clods. If rainfall causes the fine grading. The finished grade shall be a smooth even soil surface drainage. Planting is to be done immediately after (acidity) of the soil is not known, an application of ground usually sufficient. Apply limestone uniformly and incorporate not possible, apply a 10-10-10 grade fertilizer at 700-1,000 mix seed and fertilizer more than 30 minutes before application. in a loose surface additional roughening may not be required, by raking, harrowing, or other suitable methods for shall be removed and filled to provide the approved i `; ; NORTH CAROLINA Environmental Quality TEMPORARY SEEDING RECOMMENDATIONS EFFECTIVE DATE: 11 12i202') MADE AT THE EDGE ON THE TREE ROOTS OUTSIDE OF THE TREE SAVE AREA. THIS SHALL OCCUR AT THE SAME TIME THAT OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. 4. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED TREE AREA. 5. TREE PROTECTION AREA: EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. TOTAL AREA OF DISTURBANCE 10.99 AC/ 478730 SF AREA TO BE STABILIZED WITH VEGETATION 3.93 AC/ 171,046 SF www.whnarch.com (r) F- U I U 0 U) E U U ��;►►►ttlli)lill:r •\��� N C O f'`�, '• -7 SEAL ▪ 049484. t• . GINS - '\ • f,{{i D BARO,• 08.25.2022 1011111►► STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HUBER CH NOLOGY WASTE WATER Solutions o Aa• (13 co ri W L- 0 c cc, \ ■� / ■rn a (13 0 0_ HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 5. ---- EROSION CONTROL NOTES Sheet Title C-400 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2Bldg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C4.00 Erosion Control Plan.dwg Sep 20, 2022 - 2:21 pm \ EMERGENCY SPILLWAY \ SKIMMER SEDIMENT BASIN #3 TOP OF BERM: 772.00 BOTTOM OF BASIN: 768.00 SKIMMER INV: 769.00 REFER TO DETAIL: 4/C-491 BAFFLES REFER TO DETAIL 2&3/C-491 ROCK CHECK DAM, TYP. REFER TO DETAIL 7/C-491 TEMPORARY SILT FENCE OUTLET REFER TO DETAIL 8/C-490 TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 .441 0 SLOPE TERRACES TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 \\\ \ \ \\ \ / 2 \\ N2.0. -77 -CRT (CrOT-R/W-MONLIMENT_c TEMPORARY SILT FENCE REFER TO DETAIL 7/C-490 \ \ \ \ \ \ \ \i \N \\\ \\\\ \ \ \I \ \ \ \ \ \ \ \ \ \ \ \ \ \ ut\ \ \\ ) / \ \ \ \\ \ \Nt`2 \ I \ \ \ \ \ \\ \ \\\ \ tq(at\-° \ / / \\\\\\\\\NNNNN V\\\\\\ \\\ \NNN \\`` CONVERT TO DROP INLET WITH BLOCK AND GRAVEL INLET \ PROTECTION \NNNN N N N\\\ cle2 N\N\\N \\ \\ XNN\\\ \N NN X\\ \ N\ \ NNN * N \ \\ \\ \\ \ \ \ \ \ \\\\ \\\\\\\ \ \ \\ N HIGHHA ZARD D ZA R DOUBLE \\ \\ N \. \ -Za_ ROW SILT FENCE \ HORSESHOE INLET PROTECTION AND SLOPE DRAIN TO BASIN REFER TO DETAIL 3/C-490 \\ NN\;) \\\NN TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 ROCK CHECK DAM, TYP. REFER TO DETAIL 7/C-491 N N \ \ \ \ �O� 1009 AIRLIE-PKWY. Z9ED I-G / \ \ \ / \ ` 1 I / DRAINAGE AREA BOUNDARY EMERGENCY SPILLWAY zz /77/ BAFFLES REFER TO DETAIL 2&3/C-491 FAIRCLOTH SKIMMER REFER TO DETAIL 1/C-491 re TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 SEDIMENT BASIN #1 TOP OF BERM: 750.00 BOTTOM OF BASIN: 744.50 SKIMMER INV: 745.50 REFER TO DETAIL: 8/C-491 OLL DO N/F HUBER TECHNOLOGY INC. D.E 2761, PG. 880 P.B. 17 PG. ZZ7- PA 100361 PIN 4603 21-1754 I I \ \ \\( \ /' BM-f#5R S -195 :631-629.94T Et 790. 3` T \\ NN \ RIM--784.0 N IN -78O ItIv 778 -1'- \\N "N HORSESHOE INLET PROTECTION AND SLOPE DRAIN TO BASIN REFER TO DETAIL 3/C-490 \ SKIMMER SEDIMENT BASIN #2 _- TOP OF BERM: 780.00 BOTTOM OF BASIN: 775.50 SKIMMER INV: 776.50 __- REFER TO DETAIL: 4/C-491 /7, 717/(//77 ( I ( DRAINAGE AREA #1 A = 6.47 AC ?,,,,,_,:.--,----_,:________, ,----___- ------ 77, DD HORSESHOE INLET PROTECTION AND SLOPE DRAIN TO BASIN REFER TO DETAIL 3/C-490 RIP -RAP AlpRON REFER TO DETAIL 4/C-490 / )/ f / \\\\\\\ ) -\\ LIMITS OF DISTURBANCE ROCK CHECK DAM, TYP. REFER TO DETAIL 7/C-491 HIGH HAZARD SILT FENCE REFER TO DETAIL 1/C-490 DD TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 r , \\\\ / A I t\\\\ - / / / \ 1/, lir --,\\\ , - ) ,\\\\ ,Lc-l--7_-____.____--:-__7__----:------:-4_________/__r'__)----- -->-- .-----,--1_____-____ -'/.-----________________>:____ r:/_____ _,_::: y---7 -ZONED I-G ;'1\21;.t';:ti. \\ /iiN2aiii47182/ k( ;\ I( \\\A\ I ))'\ \ ) I z e\k\ )) / \\ \A \\\j/ //( BLOCK & GRAVEL INLET PROTECTION REFER TO DETAIL 5/C-490 SYSTEM \ & TANK UNABLE TO ACQUIF SIGNAL ON POWER SERVICE TO BUILDING (NO VISIBLE METER) \*\\\01\\I: TEMPORARY SILT FENCE REFER TO DETAIL 7/C-490 TEMPORARY DIVERSION DITCH REFER TO DETAIL 2/C-490 \\J\ \\\\ 11\1 / RGP ROCK CHECK DAM, TYP. REFER TO DETAIL 7/C-491 ,t /// '/ ///, iiii1/1/11/ / ;5°`°N& / ri? coe377 t, ii);\\'--17&,/ -)r-ir/h -711 CONCRETE WASHOUT / '7'80 781 I ///////i/- ////8/ N_ 783 1/// ////0\---786 ////1//,--=17:86789 /////// ilr =79°11 1--///////////////--793 /////// ///// // I///// 795 // 0//////////r 797- TEMPORARY CONSTRUCTION ENTRANCE 799 REFER TO DETAi/C-49/°7 4//////////////- _so, 7 /////////t _____,,:::////////////////////: /////z //////////// -j/p///////// // g §:ip/7// / 71 //; / Zb\' ///7/ i////// / 7///// I / / // I I / / / e ( /T\ LdC\21\11///// Z./////' /// ///2=849.0,////////// ///7/// / / / /111\\II\VI:=79998i°4:::0\117(S)/ / / .13' C)ATI CH BASIN INLET PROTECTION ( REFER TO DETAIL 5/C-491 8.72' SET) :1402530.556' L:801.52' CONCRETE WASHOUT TEMPORARY CONSTRUCTION ENTRANCE REFER TO DETAIL 6/C-490 9 EIR (#4 REBAR) E:1402534.01' EL:806.72' 7 \ ///// ///7/(/ // (7( / // // 5 EG 15" LINETYPE LEGEND: SYMBOL DESCRIPTION PROPERTY LINE EASEMENT SETBACK RIPARIAN BUFFER BZ (50') TP TREE PROTECTION FENCE EROSION CONTROL LEGEND: SYMBOL DESCRIPTION ,--- BLOCK & GRAVEL INLET PROTECTION CATCH BASIN INLET PROTECTION HARDWARE CLOTH & GRAVEL INLET PROTECTION HORSESHOE INLET PROTECTION SILT FENCE OUTLET CHECK DAM FLARED END SECTION RIP RAP DISSIPATER TEMPORARY CONSTRUCTION ENTRANCE 111 IP 0 QCG IP C:1-9) 1 •40. - % %* SF SILT FENCE DD DIVERSION DITCH NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND SITE NOTES. 2. SEE SHEET C4.00 FOR EROSION CONTROL NOTES. 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS. PHASE 1 SEQUENCE OF CONSTRUCTION ACTIVITIES: 1. AFTER OBTAINING APPROVAL OF EROSION CONTROL PLAN APPLY FOR NCGO1 CERTIFICATE OF COVERAGE (COC) BEFORE ANY LAND DISTURBING ACTIVITIES CAN OCCUS. THE CERTIFICATE OF COVERAGE CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (E-N01) FORM AT DEQ.NC.GOV/NCG01. PLEASE NOTE, THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE SEDIMENT AND EROSION CONTROL PLAN HAS BEEN APPROVED. 2. ONCE COC HAS BEEN RECEIVED PROVIDE A COPY TO THE LINCOLN COUNTY NATURAL RESOURCES DEPARTMENT AND SCHEDULE AN ONSITE PRE -CONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITY. 3. OBTAIN GRADING PERMIT. 4. DETERMINE AND MARK LIMITS OF DISTURBANCE. 5. A PRE -CONSTRUCTION CONFERENCE MUST BE HELD 48 HOURS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. THE EROSION CONTROL INSPECTOR, ARCHITECT, ENGINEER, AND CONTRACTOR SHALL BE PRESENT TO SATISFY REQUIREMENTS. INSTALL CONSTRUCTION ENTRANCE, TREE PROTECTION FENCING, SILT FENCE, PERIMETER EROSION CONTROL DEVICES AND ALL REQUIRED BASINS AND TRAPS. 7. INSTALL SEDIMENT BASINS 1, 2, AND 3. INSTALL TEMPORARY DIVERSION DITCHES TO DIVERT SEDIMENT -LADEN RUNOFF INTO THE SEDIMENT BASINS. 8. SCHEDULE SITE INSPECTION. 9. UPON APPROVAL TO PROCEED BY THE EROSION CONTROL INSPECTOR, HARVEST ANY TIMBER. 10. CONSTRUCT REMAINING EROSION CONTROL MEASURES AS REQUIRED. / 11. REMOVE AND/OR STORE TOPSOIL. 12. CONSTRUCTION IS ESTIMATED TO START IN NOVEMBER 2022 AND END IN NOVERMBER 2023. • 20 40 • 80 NORTH 00 0 • CNI LO NO NO NO NO NO NO www.whnarch.com 0 0 0 Ili CAA) -"/1/;74, 0.'.BAR-0\3‘#, 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 13 WASTE WATER Solutions 0 (13 0 al (13 HUBER TECHNOLOGY 00 CN z ce Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET EROSION CONTROL PLAN (PHASE I) Sheet Title C-401 WH N ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify ond be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2Bldg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C4.00 Erosion Control Plan.dwg Sep 20, 2022 - 2:18pm J HOOK TO SILT FENCE O_UTLET, TYP. \\\ N \\ \\N \\\ MdC2 N, N\\\ \\ \\ \\\\\ \ \''s6\ \\\\\\ >'°N h\ \ \ \\\\: N NN\ \\ \\\ \ N N \ \ -CRT (DOT-R/W- MONUMENT \ AL 1623.529' 1 I \ \ E:140178-97136'— \ \ \ 1 L�780.20' \ I I \\ \ I I I \�\ \ \ I \ I I \ \ \ J HOOK TO SILT FENCE OUTLET, TYP. \ \ \ \ \\\ \ \\ \ \\ \\ \ N \ 746 \\\ \ 7499� \ \\\\\ 50� \\ \ \\ N j 60 6 ) 6A \)66 \ \ .>• j6 \ \ > 9 \ \ \ \ \\ \ \ \\\\\\ \\\ \ \\\ STREAM BUFFER DISCHARGING TO FORNEY CREEK SKIMMER SEDIMENT BASIN #3 USE SKIMMER SEDIMENT BASIN #1 CLEAN OUT AND CONVERT TO UNTIL FINISHED GRADE CAN BE OBTAINED, SAND FILTER ONLY UPON APPROVAL \ AND STORM DRAINAGE SYSTEM IS INSTALLED FROM EROSION CONTROL INSPECTOR AND FINAL SITE STABILIZATION IS REACHED. UPON APPROVAL FROM THE EROSION CONTROL INSPECTOR CLEANOUT SKIMMER SEDIMENT BASIN AND REMOVE ONCE SITE IS FULLY STABILIZED. \ aD DOUBLE ROW HIGH HAZARD SILT FENCE REFER TO DETAIL 1/C-490 \ \\ \\\ \ \\\ \ \\ \\\ \ \ \ \ \ \ \ \\ \\ \ , \ \ \ \ \ \ \\ \\\ \\ \ \ CLEAN OUT BASIN ONLY UPON APPROVAL FROM EROSION CONTROL INSPECTOR RIP -RAP APRON REFER TO DETAIL 4/C-490 TEMPORARY SILT FENCE OUTLET REFER TO DETAIL 8/C-490 PROPOSED TERRACES REFER TO DETAIL 6/C-591 EROSION CONTROL EMBANKMENT MATTING REFER TO DETAIL 9/C-490 STOCKPILE HEIGHT SHALL NOT EXCEED 35' AND SIDE SLOPES SHALL NOT EXCEED 2:1 AirEROSION CONTROL EMBANKMENT MATTING NA, _r14,7 \\\ \ \ \ RIP -RAP APRON \ \\ \ \ REFER TO DETAIL 4/C-490 / \ \\\\ \\\ \\\\\\ / / I \ �\�\\ \\\ � / l�//jig \ \ \ \ \ j77/(//77 // })/ ) PI 46053T29-1-1-11 ZONED I-G TOP OF BANK STREAM BUFFER — MaD EROSION CONTROL EMBANKMENT MATTING REFER TO DETAIL 9/C-490 TEMPORARY SILT FENCE OUTLET REFER TO DETAIL 8/C-490 BLOCK & GRAVEL INLET PROTECTION REFER TO DETAIL 5/C-490 TEMPORARY CONSTRUCTION ENTRANCE REFER TO DETAIL 6/C-490 —757 DOUBLE ROW HIGH HAZARD SILT FENCE REFER TO DETAIL 1/C-490 CATCH BASIN INLET PROTECTION REFER TO DETAIL 5/C-491 1J- 'Pr 477/// '4/1 180 76A— // //hi, = - 787 LIMITS OF DISTURBANCE Pfir 79° ///////// ;9923 /fi //////////; TEMPORARY CONSTRUCTION ENTRANCE ___ ///////////t///ir - 797- / 79B- -// /////////////K 99 //// ///////41K 7800 PROTECTION 7/7////////i / / /7 OVCA ( L CATCH BASIN INLET PROTECTION REFER TO DETAIL 5/C-491 3115 .83' 806.72' 5 EG 15" 801 LINETYPE LEGEND: SYMBOL DESCRIPTION PROPERTY LINE — EASEMENT SETBACK RIPARIAN BUFFER BZ (50') TP TREE PROTECTION FENCE EROSION CONTROL LEGEND: SYMBOL DESCRIPTION — AtIPCG 0IP IP BLOCK & GRAVEL INLET PROTECTION CATCH BASIN INLET PROTECTION HARDWARE CLOTH & GRAVEL INLET PROTECTION - CD _ HORSESHOE INLET PROTECTION SILT FENCE OUTLET FLARED END SECTION RIP RAP DISSIPATER SF SILT FENCE sF HEAVY DUTY SILT FENCE DD DIVERSION DITCH DRAINAGE AREA BOUNDARY SOIL TYPE BOUNDARY TREELINE SKIMMER lierierie: EROSION CONTROL EMBANKMENT MATTING STOCKPILE NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND SITE NOTES. 2. SEE SHEET C4.00 FOR EROSION CONTROL NOTES. 3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION CONTROL SPECIFICATIONS. PHASE 2 SEQUENCE OF CONSTRUCTION ACTIVITIES: 1. BEGIN GRADING OPERATIONS. 2. CLEAN SEDIMENT BASINS/TRAPS WHEN ONE-HALF FULL. 3. BEGIN INSTALLATION OF THE UNDERGROUND STORM DRAINAGE SYSTEM. INSTALL INLET PROTECTION ON ALL STORM DRAINAGE STRUCTURES. 4. CONTINUE TO UTILIZE SEDIMENT BASIN #1 UNTIL SKIMMER SEDIMENT BASIN #3 IS COMPLETED AND THE FINISHED GRADE AT THE TOP OF THE FILL SLOPE CAN BE OBTAINED. ONCE THE UNDERGROUND STORM DRAINAGE SYSTEM IS COMPLETED AND APPROVAL FROM EROSION CONTROL INSPECTOR IS GIVEN, CLEAN OUT AND REMOVE SEDIMENT BASIN #1 AND UTILIZE SKIMMER SEDIMENT BASIN #3 TO TREAT THE RUNOFF FROM THE SITE. 5. ALL STREETS SURROUNDING THE PROJECT SHALL BE KEPT CLEAN AT ALL TIMES. 6. PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 7. PERMANENT SURFACE STABILIZATION SHALL BE INSTALLED FOR ALL AREAS WITHIN 14 DAYS AFTER FINAL GRADE HAS BEEN REACHED. AS NECESSARY, FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 8. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND DISPOSE BY MEANS DEEMED ACCEPTABLE BY THE ENGINEER. SCHEDULE SITE INSPECTION. UPON APPROVAL BY THE EROSION CONTROL INSPECTOR, REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE STABILIZATION. 9. ONCE THE SITE IS FULLY STABILIZED AND APPROVAL IS GRANTED FROM THE EROSION CONTROL INSPECTOR, CLEAN OUT AND CONVERT SEDIMENT BASIN #1 (PHASE 2) TO A 10. STORMWATER PERMIT INSPECTION REPORTS SHALL BE PERFORMED BY THE CONTRACTOR UNTIL NOTIFIED OTHERWISE BY THE EROSION CONTROL INSPECTOR. 11. ONCE THE SITE IS COMPLETE AND STABILIZED WITH THE ESTABLISHMENT OF PERMANENT GROUNDCOVER AND APPROVAL FROM LINCOLN COUNTY NATURAL RESOURCES HAS BEEN GIVEN TO CLOSE OUT THE EROSION AND SEDIMENT CONTROL PLAN, THE PERMITTEES SHALL VISIT DEQ.NC.GOV/NCGO1 TO SUBMIT AND ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. NOTES: 1. INSPECTOR REFERS TO LOCAL JURISDICTIONAL (NCDENR OR LOCAL) LAND QUALITY INSPECTOR OR HIS REPRESENTATIVE. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE INSPECTOR. 2. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL PLANNING LAND DESIGN MANUAL. 3. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE PERSON RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES IS REQUIRED TO INSPECT THE PROJECT AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 46.0131 TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM 20 40 80 NORTH DO o NI NI LO www.whnarch.com • 0 1-1 ClAi? SEAL 049484 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU 13 ER WASTE WATER Solutions 0 (13 0 al al HUBER TECHNOLOGY 00 ce LLI a Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: EROSION CONTROL PLAN (PHASE II) Sheet Title C-402 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Controctors shall verify ond be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2Bldg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22OO7-C4.9O Erosion Control Details.dwg Sep 20, 2022 - 2:OOpm STEEL POST WIRE FENCING WOVEN FILTER FABRIC 11-fTi=m-m= m=m-m=m-m=m=m=m=m=m=m=m=m=m=m= Ti=m=m= 111-11-111-1 H 111E111E111E111E111E111E111E111E 11E1111E1_1E111E11 E111E111E1 =111-111-11 111-111=111= =11=111E111E111E111E11=111E111E111E111-111=1 11=111E11=111= 11=111=1 1IE 11-11, 11111 i 1111 ' 11E111E111E111E111E1111 1117111E 11E111E1 1E111E11E111E111E1 711 III -III -I I IEI I I_ ' I lE111E111E111E1 IEI I IEI I I-1I Ir _lil=1 E 1- 1-1 11111„11= 111E . 8' MAX. GENERAL NOTES: 1. WIRE FENCING SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 7. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 8. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 9. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 10. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 11. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. MAINTENANCE NOTES: 0 M it I Ili III 4' MIN. STEEL POST WIRE FENCING FILTER FABRIC #5 WASHED STONE Q�c. FLOW `2"'O I- °\\-I I I I ll I7 m=1Ti- Ili�= 1T 1=111=111- �111r 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. /,1DOUBLE ROW HIGH HAZARD SILT FENCE PLAN MAINTENANCE NOTES: Inspect riprap outletstructures weekly and aftersignificant (1/2 inch or greater) rainfall events to see if any erosion around or below the riprap has taken place, or if stones have been dislodged. Immediately make all needed repairs to prevent further damage NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 8. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 9. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL FOR DESIGN DATA. OUTLET La W1 W2 d50 *T H FES-15 20' 23' 9' 0.6' 16" 2' FES-27 10' 11.25' 3.75' 0.3' 10" 0.83' OUTFALL-1 20' 23' 9' 0.6' 16" 2' " d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 T = 1.5 X dmax. T(min.)=10" RIP RAP APRON PLAN STEEL POST WOVEN FILTER FABRIC W/ HOG WIRE BACKING GENERAL NOTES: 8' MAX III®®I-■ a 111=111-11f NATURAL GRADE W2 END OF FLARED SECTION W1 END OF APRON PLAN 0 % SLOPE in- EINN®®Nab®®= 115tl ■a NOTE: MINIMUM H=2/3 ELEVATION RIP RAP NTS ea i ae bn- a se a �-II��II 1 MIN FILTER FABRIC LAP (IF NEEDED) T (THICKNESS)=10" MIN. LAYER OF FILTER FABRIC PIPE DIAMETER SECTION B-B Z_ 0 M -III-III-III-III-III-III-III-III-III-III-III-III-III-III-I 1I- I 11=1 11=1 11=1 11=111=1 11=111=1 11=111=1 11=111=1 11=111=1 11=111=1 -III-111-III=III=III=III=III=III=111=111=111=111=111=111=111= II=III=III=III=IIIEIIIEIIIEIIIEIIIEIIIEIIIEI I IEI I IEI I IEI I IEI 7111E111-111=111=111-11" 111-III=111=111=111=111=111-III: WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 3. TURN SILT FENCE UP SLOPE AT ENDS. 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. \ SILT FENCE PLAN MAINTENANCE NOTES: ce W _ m N 31BI 1 IIIIII 8" STEEL POST FILTER FABRIC #5 WASHED STR,NE 7 FLOW c.).• I, -a -fill 111� I- TTI=Tf1= II ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL MIN. NTS FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. NTS FILL SLOPE 2' MIN NA URALC RRDEND TIC III== __ I1I I-III-III=11I=1I I=11- = = =III -I T I=I T I=1 T 1=1 T 1=1 T 1=1 T 1=1 T 11 T 11 T 1=1 = `-1 I -I 1=1 1=1Ti=1TiN=M=M=M=1Ti=1Ti=u I- .ITi-ITi-ITi=111E111�111�111�111�111=111=III=111=11 I- .1=ITi=ITi=ITi=ITi=ITi=ITi=ITi=ITi=1 I I -I I I_II I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 11= ' =1 I I-III=1 I L=III=I I I1=1 I I, .III=11 6' TYP. 2' MIN COMPACTED BERM -III-I I I� --IIL91EI11 I -I I I-1 T I, I . T, NOTE: WIDTH AND DEPTH OF DITCH TO BE DESIGNED BY ENGINEER (18" MIN) 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1%. i2 TEMPORARY DIVERSION DITCH PLAN Agi M..19eacoiNKIAPa8 4aOer - 401364 cm. o0 *13 $-o .A aep .4,w% a eteT o eV,* Cl NTS CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCH BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE 2. WIRE MESH WITH 1/2-INCH OPENING OVER ALL BLOCK OPENING TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL,3/4-TO 1/2-INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED WOOD STAKES MAINTENANCE NOTES INSPECT THE BARRIER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (''A INCH OR GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. aoo•$ oe•. WOOD STAKES #5 WASHED STONE SPECIFIC APPLICATION: (1/4" TO 1/2" GRID OPENING) THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. BLOCK AND GRAVEL STONE INLET PROTECTION PLAN STEEL POST WIRE FENCING (IF APPLICABLE) WOVEN FILTER FABRIC GENERAL NOTES: 4' MAX. CLASS 1 OR 2 RIP -RAP WITH 4" OF WASHED STONE ON UPSTREAM FACE -111E1117111E1111-I 11-111E111E111III-III-III-III-III-1 I I-.. 111=1 1 11 1 1=1111 1 1=111111=1111 1 1111=1 1 1=111=1 1 1-1111 1 11 -111E111-111-1 1 1-111E111E111E111E111E111E111-111-1 1 1-111-111- 111E111E111E111E111E111E111-E111E111E111E111E111E111E111=111=1 -III-III-III-I � I -III -III -III -III -III -III -III -III -I � I -III -I I I- 111-1 1 1-1 1 1-111-111-1 1 11 111 1 1-1 1 1-1 1 1-1 1 1-111-1 1 1-1111 1 11 7111E111E111E111=111-11' -111-111111E111E111E111EI I I-11I I _lil=lil ' � E� I_lil=1 I I„I 11=1i1- CONCRETE BLOCK DROP INLET WITH GRATE NTS 1. SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. CLASS 1 OR 2 RIP -RAP SHALL BE USED AND COVERED WITH 4 INCHES OF NCDOT #5 OR #57 WASHED STONE ON THE UPSLOPE SIDE. 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTION OF THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. CLASS 1 OR 2 RIP -RAP MAINTENANCE NOTES: 1' MIN =1TI_M1 T I1 =IIhIii=n1 STEEL POST WAHSED STONE (NCDOT #5 OR #57) FLOW -III n I I=111=l l E l 1 1111111E 1l II II6EITI= _ 1. FILTER OUTLETS SHALL BE INSPECTED BY THE F NANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED IT. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. SILT FENCE OUTLET (8` PLAN NTS STABILIZED OUTLET CORRUGATED PLASTIC PIPE Y 1 1 1-1 1 1-1 -I I -III -III -III -I I I III III III III III_ 4' MIN LEVEL SECTION FLOOD STORAGE ZONE SEDIMENT STORAGE AREA AREAS TO BE DISTURBED HOLD-DOWN STAKES DIVERSION BERM HAND COMPACTED FILL OVER INLET 1 . 1=111=111=111=111=111=111=111=111=1 1_ (=1 I I=1 I I=1 I I=1 I I=II II=II II=II II=II II=II II=I1I1-_ 111E111=111E11LEEEE==1I 1_ Z III- 3.1 Z 3. 1 ,1=1 I- 1 I I- =1 =1 =1 =1 =1 1_ I I I11 -I IEMEI 11 =1 T 11 T 11 T 11 T 11 T 11 T 41_ in 1-111=11-111E111E111E1 1=111=111=111=11E111E111E111_ -I I1E1 I -I I1E1_I1E1 I1E1 I I= I I I=1_I I=1_I I1-1 T 1=1 I1E111E111E111- 1-I I -III- 1-1I IEI I I=1I IEI I IEI I I=, =111E 1-111E111E111-111 I1111E111E111I11 - .�. E111E111= 1111 1111= III III III III INLET/DIVERSION TOP OF DIVERSION BERM NATURAL GROUND IIIIIIIIIIIIIIIIIIIIIII1 DIVERSION DITCH CLASS 1 RIPRAP (SEE SECTION XTHRU BASIN BELOW) 7- NOTE DIMENSIONS ARE MINIMUM ACCEPTABLE UNLESS OTHERWISE NOTED. PERSPECTIVE VIEW PIPE INVERT FLOW I z_ 4'MIN-0-1 I III III I 4' MIN III III III- 111-111-III-I I1 E111E111E111 11=111=111=111 111E11 E111E111E111 11E1 11E1 11E1 11E111I I 11E111E11=111E111E111 11E111E111E111E111E111-1 III-111E111E11=111-111-I I I III III III III -III -III -III -I 111E111E111-11 I-11-11 I-11 I-111 1 - 11-111E111E111E111E111=111=1 -111E111E111E111E111E111E1 11=.. I 1=1 11 I I -I 1 I -I 1 I -I 117111E 1 I-- -111- III -III -III -III -III -III - I I=1 I I- I I=1 I I=1 I I=1 I I=1 I I= I I=1 I I-_ IIi -111- -III=1Ti=1Ti=1Ti=1Ti=1Ti=1-... 11-1 I-1 I-1 I-1 I-1 I- I I-1 I I-1 I I-_ =1 I-f T I-1 1=1 1=1 1=1 1=1 1=1 1=1 1=1 I I-� 11=1 I Int I I=111=111=111=111=11=111=111=111-.. =III=III=III=III=III=III=III=III=III=III-III- I III I IIIIIIIIIIIII I IIIIIIIIII-I I, � III III TOP OF HAND COMPACTED FILL I I I -III -III -III -III -III -III -III L j) 5# WASHED STONE / (1' THx3' HIGH MIN) NOTE GRAVEL & RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 10 ACRES OR LESS. NATURAL GROUND FILTER FABRIC CLASS 1 RIPRAP #57 WASHED STONE MAX SEDIMENT DEPTH (CLEAN OUT POINT) SECTION THROUGH BASIN, FILTER AND CULVERT PIPE HORSESHOE INLET PROTECTION & SLOPE DRAIN PLAN X NOTES: 1. A STABILIZED ENTRANCE PAD OF 2-3" OF WASHED STONE AND/OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A EXISTING GROUN CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 100' MIN. I I-1 111 I I-1 I I-1 I I11 i I CONSTUCTION ENTRANCE PLAN 100' MIN. SOIL STABILIZATION FABRIC UNDER 2-3" OF WASHED STONE NTS PUBLIC STREET PUBLIC STREET EX. CONC. DRIVEWAY APRON WITH SIDEWALK AT BACK OF CURB (IF RETAINED DURING CONSTRUCTION.) NTS N0I1V11d1SNI d03 ONIMVIIO Ot1VONV1S HSI1ON3 SHEET 1 OF 1 1631.01 MATTING IN DITCHES III1111 111 111 111 111 III I I I 1 I 4" -I H4" O' II Staple Check MATTING ON SLOPES 18" (MIN.) >• BACKFILL �yv MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED EXISTING GROUND STAPLES ON l' CENTERS IN TRENCH STAPLES ON l' CENTERS IN TRENCH DIAGRAM 1 Staple 7 DIAGRAM C) NOTES: THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION. STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1 INCH AND NOT LESS THAN 6 INCHES IN LENGTH. Staple Check Pattern DIAGRAv NOT TO SCALE Oz 1-1 LU ENGLISH STANDARD DRAWING FOR INSTALLATION SHEET 1 OF 1 1631.01 I \ MATTING INSTALLATION 9) PLAN NTS 00 0 • NO CD CN www.whnarch.com 0 0 SEAL 049484 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 13 WASTE WATER Solutions 0 -ZE! CZ C(3 o al (13 HUBER TECHNOLOGY co z ce Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 4. EROSION CONTROL DETAILS Sheet Title C-490 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in any form or monner whotsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Controctors shall verify ond be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions ond specifications on these drawings. r WATER ENTRY UNIT WITH TRASH SCREEN ORIFICE OPENING INSIDE THE ORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD SCHEDULE 40 PVC PIPE (BARREL OR ARM) LEXIBLE HOSE �VC VENT PIPE OUTLET PIPE WATER ENTRY UNIT END VIEW GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. ARTHEN EMBANKMENT MERGENCY SPILLWAY GRATE L11!L 111!1!Li I_I1!1! 11i11!111IllU.!1 W I I STORM WATER DISCHARGE OPENING SIDE VIEW (NO SCALE) MAXIMUM HEIGHT OF FLOAT WHEN NO OTHER STORM WATER DISCHARGE OPENINGS EXIST (MAJOR STORM EVENT) INVERT OF LOWEST STORM WATER DISCHARGE OPENING (MINOR STORM EVENT) FLEXIBLE HOSE MUST BE SECURELY FASTENED TO THE WATER QUALITY DISCHARGE OPENING MAINTAIN DEPRESSION TO MINIMIZE CHANCE OF SKIMMER BECOMING STUCK PVC VENT PIPE FLOAT 0 L = 1.4 X DEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES SCHEDULE 40 PVC PIPE (BARREL OR ARM) DRAWN BY T. R. EVANS 10/10 FAIRCLOTH SKIM& ER°DISCHARGE SYSTEM WITH OUTLET STRUCTURE J. W. FAIRCLOTH & SON INC. WWW.FAI RCLOTH SKI M M ER. COM TELEPHONE: (919) 732-1244 FAX: (919) 732-1266 EMAIL: WARREN@FAIRCLOTHSKIMMER.COM 4 FAIRCLOTH SKIMMER DETAIL SECTION MAINTENANCE NOTES Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re -anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. If this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in the winter to prevent the skimmer from plugging with ice. SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA < 10 AC. (ACRES) MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 325 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED PLAN VIEW INFLOW AVERAGE _ AREA* WIDTH LENGTH * AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO DETAIL 8 ON THIS SHEET FOR BAFFLE SPACING AND INSTALLATION 3. SKIMMER INVERT ELEVATION = BASIN BOTTOM + 1' MIN. 4. H = SPILLWAY ELEVATION - SKIMMER INVERT ELEVATION CROSS-SECTION VIEW INFLOW BAFFLES DEWATERING ZONE FILTER FABRIC CLEANOUT DEPTH (H/2) DATA BLOCK 1' SEDIMENT STORAGE LENGTH 10' MIN. SKIMMER DEWATERING DEVICE 1' FREEBOARD 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY MOUND RIP -RAP AS PEDESTAL (OR APPROVED EQUIVALENT) Z=5' MAX. W=5' MIN. H=2' MIN SKIMMER ARM LENGTH = H x 1.5 (MIN. 5') EMBANKMENT EMERGENCY SPILLWAY LENGTH, L (10' MIN.) EMBANKMENT T=1.5' MIN. EMERGENCY SPILLWAY ANTI -SEEP COLLAR BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 BASIN VOLUME BASIN SURFACE AREA CLEANOUT DEPTH (FT.) H/2 H (FEET) Z (FEET) L (FEET) T (FEET) W (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER REQUIRED (CUBIC FT.) PROVIDED (CUBIC FT.) REQUIRED (SO FT.) PROVIDED (SQ FT.) 2 1.07 1.07 5.06 1,926 2,732 1,644 1,682 1 2 3.5 6' 1.5' 5' 2.0" 0.75" 3 7.93 6.31 37.01 11,360 22,864 12,027 12,800 1 2 3.5 35' 1.5' 5' 2.5" 2" A SKIMMER SEDIMENT BASIN 9-) SECTION NTS NTS EMERGENCY SPILLWAY OUTLET ZONE - 25% OF SURFACE AREA BAFFLE SPACING SECOND CHAMBER - 25% OF SURFACE AREA EARTHEN EMBANKMENT FIRST CHAMBER - 25% OF SURFACE AREA INLET ZONE - 25% OF SURFACE AREA EXPANSION RESTRAINT SECTION SECTION HOOD NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE AND/OR CLOSE OUT OF GRADING PERMIT. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). GRATE 1" REBAR FOR BAG REMOVAL FROM INLET FILTER BAG DUMP LOOPS CATCH BASIN 5 SILT SACK INLET PROTECTION SECTION GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). III.111_III_JL111 11A MAXIMUM SPACING =III_ •�:�i���'� '111_111_III_III=111_111__-III_III_ �����'�'�rs III=111=III_III_III-111- A AND B ARE AT EQUAL ELEVATIONS 1'-6" MIN. IIIII III=U - It - -In= It l�tl_1 III-,, Trl=, ItI- =11 DEFLECTOR REQUIRED WHEN USED ON EXISTING MAINTAINED STREETS. DEFLECTOR SHALL BE PLACED SUCH THAT IT WILL NOT COMPLETELY OBSTRUCT STORM WATER FLOW FROM ENTERING VIA THE CURB OPENING. ENSURE NO MORE THAN 25% OF CURB OPENING IS OBSTRUCTED. OUTLET INSTALLATION CLASS B RIP RAP-N 2 1'-6" MIN. CROSS SECTION r9,1. 4. -=i ,��I1~11 i=1=1= r Off+ F•�� r�� 1111=III=,•III=�11=111=,_-'._' 1=�11=_III=_III=1_I= It _ q'=1t'= 111=111=Ill-Itl=lt'_Il'=ql=lt'_It _ PLAN FILTER CLOTH # 5 WASHED STONE FLOW 2' MAX AT CENTER NTS NTS 700 G/M2 COIR EROSION BLANKE OR COIR MESH BAFFLE ATTACHED TO POSTS WITH LENGTHS OF WIRE BAFFLE INSTALLATION NOTES 1. DRIVE STEEL FENCE POST AT LEAST 24" INTO SOLID GROUND 2. WOOD POSTS ARE NOT ACCEPTABLE 3. USE STAPLES 1' APART TO ATTACH FABRIC 4. ALL BAFFLES SHALL BE TIED INTO THE BASIN EMBANKMENTS TO PREVENT WATER FROM BYPASSING ON EITHER SIDE. MAINTENANCE 1. INSPECT BAFFLES AT LEAST ONCE A WEEK OR AFTER ANY RAINFALL 2. REMOVE SEDIMENT WHEN IT REACHES HALF FULL. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGN STORAGE DEPTH. 3. TAKE ALL PRECAUTION TO MAINTAIN QUALITY OF BAFFLES. IF BAFFLES ARE DAMAGE, REMOVE AND REPLACE. 3 BAFFLE DETAIL ) SECTION TOP OF BAFFLE SHOULD BE 6" HIGHER THAN INVERT OF SPILLWAY. TOP OF BAFFLE SHOULD BE 2" LOWER THAN THE TOP OF BERMS. SUPPORT WIRE FENCE AND NETTING BURIED IN TRENCH OR PINNED WITH 8" MATTING STAPLES 8" DEEP TRENCH, BACKFILLED AND COMPACTED SECTION AT OPENING NTS Date: NCDOT #5 0R #57 WASHED STONE 19-GAUGE HARDWARE CLOTH (4 MESH OPENINGS) NCDOT #5 OR #57 WASHED STONE Construction: 1. Uniformly grade a shallow depression approaching the inlet. 2. Drive 5-foot steel posts 2 feet into the ground surrounding the inlet. Space posts evenly around the perimeter of the inlet, a maximum of 4 feet apart. 3. Surround the posts with wire mesh hardware cloth. Secure the wire mesh to the steel posts at the top, middle, and bottom. Placing a 2-foot flap of the wire mesh under the gravel for anchoring is recommended. 4. Place clean gravel (NC DOT #5 or #57 stone) on a 2:1 slope with a height of 16 inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized, remove accumulated sediment, and establish final grading elevations. 6. Compact the area properly and stabilize with groundcover. Page: ::1 F Maintenance: 1. Inspect sediment fences at least once a week and after each 1 inch or greater rainfall. Make any required repairs immediately. 2. Clear the mesh wire of any debris or other objects to provide adequate flow for subsequent rains. Take care not to damage or undercut the mesh during sediment removal. 3. Replace stone as needed. ` NORTH CAROLINA I. 811 Environmental Quality INLET PROTECTION HARDWARE CLOTH & GRAVEL INLET PROTECTION SECTION SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN. LENGTH TO WIDTH RATIO 2:1 MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 435 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED INFLOW DEWATERING ZONE FILTER FABRIC DATA BLOCK CLEANOUT DEPTH (H/2) PLAN VIEW INFLOW AVERAGE AREA" WIDTH = LENGTH * AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY CROSS-SECTION VIEW 2' MIN. I' SEDIMENT STORAGE BAFFLE (TYP.) 1' FREEBOARD 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY CMP PRIMARY SPILLWAY (RISER) BAFFLES • W BAFFLE (TYP.) H X 1.5 (5' MIN.) MOUND RIP -RAP AS PEDESTAL (OR APPROVED EQUIVALENT) NOTES: 1. REFER TO NCESCPDM SECTION #6.61 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SEDIMENT BASINS. 2. REFER TO DETAIL 8/C9.10 FOR BAFFLE SPACING AND CMP INSTALLATION. BARREL CMP RISER 8'X8'X0.5' ANTI -FLOTATION BLOCK 3. FIRST BAFFLE IS TO BE CONSTRUCTED OF RIP -RAP. WITH A MIN. HEIGHT OF 3' AND MIN. TOPWIDTH OF 2'. 4. SKIMMER INVERT ELEVATION = BASIN BOTTOM + 1' MIN. 5. H = SPILLWAY ELEVATION - SKIMMER INVERT ELEVATION EMBANKMENT EMERGENCY SPILLWAY ANTI -SEEP COLLAR NOT TO SCALE BASIN DRAINAGEDENUDED (ACRES) (ACRES) QIo BASIN VOLUME BASIN AREA DEPTH (FT.) H/2 (FEET) (FEET) (FEET) (FEET) (FEET) SKIMMERPEORIFICE DIAMETER R DIAMETER RISER DIAMETER BARREL DIAMETER REQUIRED (CUBIC FT.) PROVIDED (CUBIC FT.) REQUIREDRFACE (SO FT.) PROVID D (SQ FT.) 1 6.47 4.85 27.06 8,730 19,616 11,769 12,000 1 2 3.5 12' 1.5' 5' 2.5" 1.5" 30" 24" SEDIMENT BASIN SECTION NTS NTS a) C O x _C 12 0 N N LC) O O O 03 0") 1'6 rri Ist") M 4 O O www.whnarch.com F- U U 0 U) E U U ;��}1111!Jllr1�r �.� :3"-e'9E1511S- 84 L '/ CP BAR° .•\ 08.25.2022 '1/011111,- STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 Hu B E R WASTE WATER Solutions o 0 CZ (13 w O c ca ■ = Ci) al (13 HUBER TECHNOLOGY MO W N < z 5J p 0_ U W J I- I/ Q0 VJ z c W z W a Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: 2. 3. 4. 5. 6. EROSION CONTROL DETAILS Sheet Title 0-491 TEMPORARY ROCK CHECK DAM 7 SECTION NTS WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or monner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.00 Grading & Storm Drainage Plan.dwg Sep 20, 2022 - 2:30pm \\\\\ \\\\\` N\ \\\ \\\ \\ \\\ \\\\ PROPOSED SAND FILTER BOTTOM OF BASIN: 769.00 TOP OF BERM: 774.00 REFER TO DETAILS ON SHEET C-590 RIP -RAP APRON REFER TO DETAIL 4/C-490 N 2:1 REINFORCED SLOPE TW: 785.00 NNSEGMENTAL IELOCK RETAINING WALL NN N \ \ -----\ ' ) \ \ \ \ TW: 782.96 \ \ \ 1 I BW779.74I N \ I \� \ \ \\ I I \ N \ 1 TW:779.59 N N \ \ \ \ BW: 779.59 w \ \ \ \ \ \ \ \ \ \_, .7- 7\ \ \ \ N \ \ \ \\ \ \ \ \ \' \ \ \ \ \ \���o\\\ \\ 6� \ \ TW:778.63 / / / \ \ \ %, \ \\ \ BW:777.92 \ \ a'�`r \ \\ \ \\ \ \ N\\ \ \\ \ \\ \ \ \ \ \\ \ N TW:777.73 \ \ \ \ BW: 775.30 \\ N N \\\\ \' SEGMENTAL BLOCK RETAINING WALL \ \ \ \ \ TW:776.67 BW: 773.70 TW: 785.69 BW: 780.74 \N N N N N TW: 784.70 TW: 773.13 \ BW: 773.06 \\ \\ \\ \\ \ \ \\\\ \ \\ \\ \\\ \ \\ \\ \ \\\ \\\\\\\ 7.8 REFER TO DETAIL 1&2/C-590 TOP OF BANK '.. Lk4 1\A( \\ II t N \\\ \\7\\\\\ ,\\\\\ \ \ \\\ \ \ 0,A,\\\\''k 1\\�\ \ \\\ \\\\\NNNN \\\\\ \ \ \ - 1 \ \u\V\\\\k \\ x\\\ „ N \ ,\ \\ , NNN,\ \\ ,,,, vv \\ ,N N., ..,.„,,,, ,„-.--,_,, ,,,,:,,,,„„, ..,.,,,..,,.%,,, \y vv vvvv vvv v\ \ w V, \v\ \\ AA \�-- \.,...4;r \\ \\\\\ \\ \\\ \\ mo\ \\ \ - NNN \/ / - EMERGENCY SPILLWAY INV: 773.00 REPLACE EXISTING CATCHBAS1N GRATE WITH A DROP INLET GRATE AND MATCH FINISHED GRADE / //' \\\ \\\\\\\ /zz- \\\\\\\-\\ \.\\\\\\\\\\\\\\\r*: :jj( //////////g, \\\ 1,1111'1111/11;11 '1'111(1 N\- \\ I Till'" II EXISTING STORM 791.64 791.84 Fool DRAINAGE PIPE TO REMAIN SEE DETAIL 6/C-591 TERRACE / MATCH EXISTING GRADE / 2:1 REINFORCED SLoPPE / 17 ________ ------- ..,„---------- ___.---[__ ----- _,--- ------- - Ty APPROXIMATE LOCATION OF , EXISTING STORM DRAINAGE / J // NOT SURVEYED 1///////7/// / /////////1// EIR R) /i/47/////// CONNECT EXISTING STORM DRAINAGE / //// EL 806.7 N DRIVEWAY PROFILE IF LINETYPE LEGEND: SYMBOL • BZ TP DESCRIPTION LIMITS OF DISTURBANCE PROPERTY LINE EASEMENT SETBACK RIPARIAN BUFFER (50') TREE PROTECTION FENCE • ACCESSIBLE ROUTE GRADING LEGEND: SYMBOL DESCRIPTION DETAIL REFERENCE 44.50 TC 44.50 TW 46.00 BW 44.00 PROPOSED JUNCTION BOX PROPOSED CATCH BASIN PROPOSED AREA DRAIN RIPRAP APRON FLOW DIRECTION PROPOSED ELEVATION TOP/BOTTOM OF CURB TOP/BOTTOM OF WALL 200 1/C-592 4/C-490 PROPOSED STORM DRAINAGE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. STORM DRAINAGE NETWORK TYPE CODE: AD = AREA DRAIN FES = FLARED END SECTION JB = JUNCTION BOX RI = RISER YI = YARD INLET CB = CATCH BASIN CI = CURB INLET CO = CLEANOUT TD = TRENCH DRAIN TYPE CODE: L-AD = AREA DRAIN L-JB = JUNCTION BOX L-TD = TRENCH DRAIN L-CO = CLEANOUT UPSTREAM GRD. ELEV. FLOW - UPSTREAM INVERT DOWNSTREAM INVERT DOWNSTREAM STRC DOWNSTREAM GRD. ELEV. NOTES: 1. STRUCTURES WITHIN NCDOT RIGHT-OF-WAY SHALL BE TO NCDOT STANDARDS. 2. STRUCTURES NOT WITHIN RIGHT OF WAY SHALL EITHER ALL BE TO NCDOT STANDARDS OR SHALL ALL BE TO LOCAL JURISDICTIONAL STANDARDS. 3. ALL STORM PIPES TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+25 795 795 790 790 785 785 PROPOSED GRADE 780 780 1 GRADE EXISTING 775 775 \ ir3.31' @ 2% 765 765 -0+25 0+00 0+50 1+50 2+00 • 20 SCALE: 2+50 40 3+00 3+25 • 80 NORTH co a) in co Nri www.whnarch.corn ;.+1 0 LLJ 049484 • STEWART CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU WASTE WATER Solutions coo 0 0 CO (13 co HUBER TECHNOLOGY co ‘_ Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 3. 4. 6. GRADING & STORM DRAINAGE PLAN Sheet Title C-500 WHN ARCHITECTS hereby reserves their common law copyright ond other property rights in these plons, ideas and designs. These plans, ideas and designs are not to be reproduced, changed or copied in on y form or monner whatsoever, nor are they to be ossigned to ony third porty without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drowings shall hove precedence over scaled dimensions. Contractors sholl verify ond be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variotions from the dimensions, conditions and specifications on these drowings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.10 SCM Plan & Details.dwg Sep 20, 2022 - 2:02pm STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 02 - DI 788.57 INV OUT: 785.57 15" RCP (18-DI) 03 - DI 788.24 INV OUT: 784.08 15" RCP (05 - CB) 04 - CB 789.55 INV IN: 784.25 INV OUT: 778.73 15" RCP (07 - CB) 05 CB 789.62 INV IN: 783.17 INV OUT: 778.55 15" RCP (06 - CB) 06 CB 782.49 INV IN: 777.49 INV OUT: 777.29 15" RCP (07 - CB) 07 - CB 788.04 INV IN: 776.80 INV IN: 776.80 INV OUT: 775.55 30" RCP (07A - DI) 07A - DI 789.70 INV IN: 775.25 INV IN: 777.56 INV OUT: 775.05 30" RCP (08 - CB) 7B - DI 790.94 INV IN: 779.04 INV IN: 785.67 INV OUT: 778.84 24" RCP (07A - DI) 08 - CB 790.38 INV IN: 774.13 INV OUT: 773.93 30" RCP (09 - CB) 09 CB 790.92 INV IN: 773.37 INV OUT: 773.17 30" RCP (9A - CB) 9A - CB 788.11 INV IN: 772.39 INV IN: 783.27 INV OUT: 772.19 30" RCP (10 - CB) 9B - TD 784.99 INV OUT: 783.47 15" RCP (9A - CB) 10 - CB 786.46 INV IN: 771.42 INV IN: 774.96 INV OUT: 770.92 36" RCP (11 - MH) 11 - MH 794.02 INV IN: 770.65 INV OUT: 770.45 36" RCP (Outfall - 1) 13-OCS 774.00 INV OUT: 766.00 36" RCP (14 - MH) 14 MH 766.38 INV IN: 762.00 INV OUT: 750.40 36" RCP (15 - FES) 15 - FES 747.41 INV IN: 744.08 16-CB 788.62 INV OUT: 785.13 15" RCP (17-DI) 17 DI 790.66 INV IN: 784.45 INV OUT: 784.25 15" RCP (18-DI) 18-DI 791.26 INV IN: 783.87 INV IN: 783.87 INV OUT: 783.67 15" RCP (19-DI) STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 19-DI 791.15 INV IN: 786.95 INV IN: 787.07 INV IN: 783.11 INV OUT: 782.36 24" RCP (20-DI) 20-DI 790.78 INV IN: 781.93 INV IN: 787.06 INV OUT: 781.73 24" RCP (7B - DI) 22-CB 787 09 INV IN: 781.00 INV OUT: 779.12 15" RCP (23-CB) 23-CB 786.82 INV IN: 776.89 INV IN: 781.46 INV OUT: 776.44 18" RCP (10 - CB) 28 - RD 789.18 INV OUT: 788.45 8" PVC (29 - CO) 29 CO 789.09 INV IN: 788.37 INV OUT: 788.37 8" PVC (36 - CO) 30 - RD 790.16 INV OUT: 789.43 8" PVC (31 - CO) 31 CO 790.07 INV IN: 789.34 INV OUT: 789.34 8" PVC (33 - CO) 32 - RD 789.32 INV OUT: 788.59 8" PVC (33 - CO) 33 - CO 789.24 INV IN: 788.50 INV IN: 788.50 INV OUT: 788.34 10" PVC (35 - CO) 34 - RD 788.90 INV OUT: 788.17 8" PVC (35 - CO) 35 - CO 788.82 INV IN: 787.92 INV IN: 788.08 INV OUT: 787.92 10" PVC (36 - CO) 36 - CO 788.55 INV IN: 787.64 INV IN: 787.80 INV OUT: 787.47 12" PVC (19-DI) 37 - RD 787.64 INV OUT: 786.91 8" PVC (38 - CO) 38 - CO 791.64 INV IN: 786.82 INV IN: 786.49 INV OUT: 786.49 12" PVC (7B - DI) 39 - RD 792.17 INV OUT: 787.24 8" PVC (40 - CO) 40 - CO 792.08 INV IN: 786.99 INV IN: 787.16 INV OUT: 786.82 12" PVC (38 - CO) 41 - RD 792.17 INV OUT: 788.08 8" PVC (42 - CO) 42 - CO 792.11 INV IN: 787.83 INV IN: 788.00 INV OUT: 787.83 10" PVC (40 - CO) 43 - RD 792.17 INV OUT: 788.50 8" PVC (44 - CO) PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 65 - CO 04 - CB 785.30 784.25 8" 52.89' 2.00% PVC 03 - DI 05 - CB 784.08 783.17 15" 33.67' 2.70% RCP 05 - CB 06 - CB 778.55 777.49 15" 80.59' 1.32% RCP 06 - CB 07 - CB 777.29 776.80 15" 99.29' 0.50% RCP 04 - CB 07 - CB 778.73 776.80 15" 81.83' 2.36% RCP 7B - DI 07A - DI 778.84 777.56 24" 64.00' 2.00% RCP 07 - CB 07A - DI 775.55 775.25 30" 59.78' 0.50% RCP 38 - CO 7B - DI 786.49 785.67 12" 41.08' 2.00% PVC 20-DI 7B - DI 781.73 779.04 24" 134.36' 2.00% RCP 07A - DI 08 - CB 775.05 774.13 30" 183.77' 0.50% RCP 08 - CB 09 - CB 773.93 773.37 30" 110.81' 0.51% RCP 9B - TD 9A - CB 783.47 783.27 15" 33.58' 0.60% RCP 09 - CB 9A - CB 773.17 772.39 30" 156.39' 0.50% RCP 9A - CB 10 - CB 772.19 771.42 30" 153.22' 0.50% RCP 23-CB 10 - CB 776.44 774.96 18" 89.57' 1.65% RCP 10 - CB 11 - MH 770.92 770.65 36" 52.13' 0.52% RCP 13-OCS 14 - MH 766.00 762.00 36" 67.19' 5.95% RCP 14 - MH 15 - FES 750.40 744.08 36" 97.18' 6.50% RCP 16-CB 17-DI 785.13 784.45 15" 105.91' 0.64% RCP 17-DI 18-DI 784.25 783.87 15" 43.74' 0.87% RCP PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 42 - CO 40 - CO 787.83 786.99 10" 42.00' 2.00% PVC 41 - RD 42 - CO 788.08 788.00 8" 4.33' 2.00% PVC 44 - CO 42 - CO 788.25 787.83 10" 21.00' 2.00% PVC 43 - RD 44 - CO 788.50 788.42 8" 4.33' 2.00% PVC 46 - CO 44 - CO 789.26 788.42 8" 42.00' 2.00% PVC 45 - RD 46 - CO 789.34 789.26 8" 4.33' 2.00% PVC 48 - RD 49 - CO 789.21 789.14 8" 3.59' 2.00% PVC 49 - CO 51 - CO 789.14 788.20 8" 46.69' 2.00% PVC 50 - RD 51 - CO 788.27 788.20 8" 3.57' 2.00% PVC 51 - CO 52 - CO 788.20 787.89 8" 15.59' 2.00% PVC 53 - RD 54 -CO 789.42 789.34 8" 4.33' 2.00% PVC 55 - RD 56 - CO 789.07 788.99 8" 4.33' 2.00% PVC 54 -CO 56 - CO 789.34 788.99 8" 17.42' 2.00% PVC 57 - RD 58 - CO 788.40 788.31 8" 4.34' 2.00% PVC 56 - CO 58 - CO 788.99 788.31 8" 33.91' 2.00% PVC 58 - CO 59 - CO 788.31 787.90 8" 20.23' 2.00% PVC 60 - RD 61 - CO 786.69 786.46 8" 11.34' 2.00% PVC 62 - RD 63 - CO 786.09 785.86 8" 11.33' 2.00% PVC 61 - CO 63 - CO 786.46 785.86 8" 30.00' 2.00% PVC 63 - CO 64 - CO 785.86 785.53 8" 16.77' 2.00% PVC STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 44 - CO 792.13 INV IN: 788.42 INV IN: 788.42 INV OUT: 788.25 10" PVC (42 - CO) 45 - RD 792.16 INV OUT: 789.34 8" PVC (46 - CO) 46 CO 792.03 INV IN: 789.26 INV OUT: 789.26 8" PVC (44 - CO) 48 - RD 789.93 INV OUT: 789.21 8" PVC (49 - CO) 49 CO 789.86 INV IN: 789.14 INV OUT: 789.14 8" PVC (51 - CO) 50 - RD 789.00 INV OUT: 788.27 8" PVC (51 - CO) 51 - CO 788.93 INV IN: 788.20 INV IN: 788.20 INV OUT: 788.20 8" PVC (52 - CO) 52 - CO 788.63 INV IN: 787.89 INV OUT: 787.56 12" PVC (19-DI) 53 - RD 790.17 INV OUT: 789.42 8" (54 -CO) 54 CO 790.08 INV IN: 789.34 INV OUT: 789.34 8" (56 - CO) 55 - RD 789.82 INV OUT: 789.07 8" (56 - CO) 56 - CO 789.74 INV IN: 788.99 INV IN: 788.99 INV OUT: 788.99 8" (58 - CO) 57 - RD 789.14 INV OUT: 788.40 8" (58 - CO) 58 - CO 789.06 INV IN: 788.31 INV IN: 788.31 INV OUT: 788.31 8" (59 - CO) 59 CO 788.67 INV IN: 787.90 INV OUT: 787.57 12" PVC (20-DI) 60 - RD 787.44 INV OUT: 786.69 8" (61 - CO) 61 - CO 787.21 INV IN: 786.46 INV OUT: 786.46 8" (63 - CO) 62 - RD 786.84 INV OUT: 786.09 8" (63 - CO) 63 - CO 786.61 INV IN: 785.86 INV IN: 785.86 INV OUT: 785.86 8" (64 - CO) 64 CO 786.28 INV IN: 785.53 INV OUT: 785.53 8" (65 - CO) STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 65 - CO 786.05 INV IN: 785.30 INV OUT: 785.30 8" (04 - CB) 66 - RD 786.14 INV OUT: 785.41 8" PVC (67 - CO) 67 - CO 786.04 INV IN: 785.31 INV OUT: 785.31 8" PVC (69 - CO) 68 - RD 785.53 INV OUT: 784.80 8" PVC (69 - CO) 69 - CO 785.43 INV IN: 784.70 INV IN: 784.70 INV OUT: 784.70 8" PVC (71 - CO) 70 - RD 784.81 INV OUT: 784.08 8" PVC (71 - CO) 71 - CO 784.71 INV IN: 783.98 INV IN: 783.98 INV OUT: 783.81 10" PVC (73 - CO) 72 - RD 784.09 INV OUT: 783.36 8" PVC (73 - CO) 73 - CO 784.00 INV IN: 783.09 INV IN: 783.26 INV OUT: 782.93 12" PVC (75 - CO) 74 - RD 783.61 INV OUT: 782.88 8" PVC (75 - CO) 75 - CO 783.52 INV IN: 782.78 INV IN: 782.45 INV OUT: 782.45 12" PVC (22-CB) 76 - RD 786.13 INV OUT: 785.41 8" PVC (77 - CO) 77 - CO 786.05 INV IN: 785.32 INV OUT: 785.32 8" PVC (79 - CO) 78 - RD 785.68 INV OUT: 784.93 8" (79 - CO) 79 - CO 785.59 INV IN: 784.84 INV IN: 784.84 INV OUT: 784.84 8" PVC (81 - CO) 80 - RD 785.20 INV OUT: 784.45 8" (81 - CO) 81 - CO 785.11 INV IN: 784.36 INV IN: 784.36 INV OUT: 784.36 8" PVC (83 - CO) 82 - RD 784.69 INV OUT: 783.97 8" PVC (83 - CO) 83 - CO 784.62 INV IN: 783.88 INV IN: 783.88 INV OUT: 783.71 10" PVC (88 - CO) 84 - RD 785.48 INV OUT: 784.75 8" PVC (85 - CO) PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 02 - DI 18-DI 785.57 783.87 15" 87.79' 1.94% RCP 52 - CO 19-DI 787.56 787.07 12" 24.36' 2.00% PVC 36 - CO 19-DI 787.47 786.95 12" 26.10' 2.00% PVC 18-DI 19-01 783.67 783.11 15" 56.53' 0.99% RCP 59 - CO 20-DI 787.57 787.06 12" 25.44' 2.00% PVC 19-DI 20-DI 782.36 781.93 24" 86.61' 0.50% RCP 75 - CO 22-CB 782.45 781.00 12" 72.46' 2.00% PVC 88 - CO 23-CB 783.41 781.46 12" 97.33' 2.00% PVC 22-CB 23-CB 779.12 776.89 15" 97.01' 2.30% RCP 28 - RD 29 - CO 788.45 788.37 8" 4.33' 2.00% PVC 30 - RD 31 - CO 789.43 789.34 8" 4.33' 2.00% PVC 31 - CO 33 - CO 789.34 788.50 8" 42.00' 2.00% PVC 32 - RD 33 - CO 788.59 788.50 8" 4.33' 2.00% PVC 33 - CO 35 - CO 788.34 787.92 10" 21.00' 2.00% PVC 34 - RD 35 - CO 788.17 788.08 8" 4.33' 2.00% PVC 35 - CO 36 - CO 787.92 787.64 10" 13.93' 2.00% PVC 29 - CO 36 - CO 788.37 787.80 8" 28.07' 2.00% PVC 40 - CO 38 - CO 786.82 786.49 12" 16.73' 2.00% PVC 37 - RD 38 - CO 786.91 786.82 8" 4.33' 2.00% PVC 39 - RD 40 - CO 787.24 787.16 8" 4.33' 2.00% PVC PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 64 - CO 65 - CO 785.53 785.30 8" 11.21' 2.00% PVC 66 - RD 67 - CO 785.41 785.31 8" 5.00' 2.00% PVC 68 - RD 69 - CO 784.80 784.70 8" 5.00' 2.00% PVC 67 - CO 69 - CO 785.31 784.70 8" 30.50' 2.00% PVC 70 - RD 71 - CO 784.08 783.98 8" 5.00' 2.00% PVC 69 - CO 71 - CO 784.70 783.98 8" 36.03' 2.00% PVC 72 - RD 73 - CO 783.36 783.26 8" 5.00' 2.00% PVC 71 - CO 73 - CO 783.81 783.09 10" 36.00' 2.00% PVC 74 - RD 75 - CO 782.88 782.78 8" 5.00' 2.00% PVC 73 - CO 75 - CO 782.93 782.45 12" 24.00' 2.00% PVC 76 - RD 77 - CO 785.41 785.32 8" 4.33' 2.00% PVC 78 - RD 79 - CO 784.93 784.84 8" 4.39' 2.00% PVC 77 - CO 79 - CO 785.32 784.84 8" 24.00' 2.00% PVC 79 - CO 81 - CO 784.84 784.36 8" 24.00' 2.00% PVC 80 - RD 81 - CO 784.45 784.36 8" 4.39' 2.00% PVC 81 - CO 83 - CO 784.36 783.88 8" 24.00' 2.00% PVC 82 - RD 83 - CO 783.97 783.88 8" 4.33' 2.00% PVC 84 - RD 85 - CO 784.75 784.67 8" 4.33' 2.00% PVC 86 - RD 87 - CO 784.00 783.91 8" 4.33' 2.00% PVC 85 - CO 87 - CO 784.67 783.91 8" 37.90' 2.00% PVC STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 85 CO 785.39 INV IN: 784.67 INV OUT: 784.67 8" PVC (87 - CO) 86 - RD 784.72 INV OUT: 784.00 8" PVC (87 - CO) 87 - CO 784.63 INV IN: 783.91 INV IN: 783.91 INV OUT: 783.91 8" PVC (88 - CO) 88 - CO 788.14 INV IN: 783.57 INV IN: 783.57 INV OUT: 783.41 12" PVC (23-CB) 89 - DI 787.16 EXISTING STRUCTURE AND PIPES Outfall - 1 774.00 INV IN: 769.00 PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 83 - CO 88 - CO 783.71 783.57 10" 7.06' 2.00% PVC 87 - CO 88 - CO 783.91 783.57 8" 16.94' 2.00% PVC 11 - MH Outfall - 1 770.45 769.00 36" 140.00' 1.04% RCP STRUCTURE TABLE STRUCTURE NAME STRUCTURE RIM INVERTS 24-CB 796.09 INV OUT: 791.66 15" RCP (25-CB) 25 CB 790.03 INV IN: 785.57 INV OUT: 785.57 15" RCP (26-CB) 26 CB 784.05 INV IN: 779.52 INV OUT: 774.69 15" RCP (27-FES) 27-FES 773.13 INV IN: 771.69 PIPE TABLE START STRUCTURE END STRUCTURE START INVERT END INVERT SIZE LENGTH SLOPE MATERIAL 24-CB 25-CB 791.66 785.57 15" 141.15' 4.31% RCP 25-CB 26-CB 785.57 779.52 15" 139.30' 4.34% RCP 26-CB 27-FES 774.69 771.69 15" 86.83' 3.46% RCP N ; 0CNI ci c �op 0 x ▪ N _c 0 Q4- ZNN O LO rn rn -(1) 0)0) • O rr) 1) C o - 44 rr)-C 00 N)U N. www.whnarch.com C U 0 U) `�tklltilll�lirffr 'O ( f ,e-,O �r S gt / � k� 049484 ffrr 4b BAF 0" ,,,\08.25.2022 f��llfll4114, STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU BE R WASTE WATER Solutions U N O ^L 0 HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 3. ---- 4. ---- 6. ---- STORM PIPE AND STRUCTURE TABLES Sheet Title 0-510 • WHN ARCHITECTS hereby reserves their common law copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.20 Drainage Area Maps.dwg Sep 20, 2022 - 2:04pm \ \ \ \ \\ \ \ \ \ N -- _----- 'tNN\\ \ q\ i ( I I i i „ 1 1 1 7 / / / , / N NNN \ I I N\\\\\ \\ \\` \\\\ \\\ \\ \ \\ — __k ' \ \\ \\ \ \ \N\\ \\ \\\ \\\\ \ \\ \ \\\\\ \\\\\ _ 16�// / // // / / \\ --I- \ \\ \\\�\ \ //// // / / \ \ _ _ \ \ / \ \ �� \� ��\ �\ \\ \\ - /i�, // � \\� TIME OF CONCENTRATION \� —� 755 �� // / / / \\ — �= \ \ \ - \CHANNEL FLOW / / / / / / _\\ \ \ \TOP ELEV: 737.00' _� _/� V \ \ \ BOT ELEV: 726.00' 750�/ i //� \ �\ \ FLOW LENGTH: 635.96 FT J i i / / \ \\\ \ _, SLOPE: 1.73% =� i �� `\\ WOODED GROUND COVER — — \\\ Tc = 1.4 MIN \ \ \ Nk\. \ �\ \ \ \\\\\\\\\ \\\ � \\\\\�\\\ \ \ >\ \ \ \\\ \\\\\ ="\ / — \\ \ — k\-z1A \ / // / \ \N NN \ \ \ \\\ / / / / \- \\ \ \ \ \ DRAINAGE AREA 2 14.29 AC Qi o = 8.73 cfs N NNN / / // // \ \ \\\ \ N � % / /// / // / N \ \ \\/ / \ \\ /// // // \ \ _ \ \\ \\ \>6'p\\ \\ 745 \\ \ —740 \\\NNr\\\\\ xNli I \ N \\\\ // ( z //7/ //(// / / // / / TIME OF CONCENTRATION SHALLOW CONCENTRATED FLOW TOP ELEV: 799.80' BOT ELEV: 737.00' FLOW LENGTH: 929.86 FT SLOPE: 6.75% WOODED GROUND COVER N \\\\/ // // / / N N \\ \\\ / / \ / //11 N\ \\\ I / \\ ) \,95 \x\ N\ \\\\\ / DRAINAGE AREA 1 5.58 AC / /// /( /7// 1) 1)/iii \\\\\ \\\ \\ \\ \\ /) //1/ /I )2/ 7/77/07// <0 N \\ fil(1111111(ilil((iir z, 7 / 7„7 /// // ./.77 // / 2 N\A / 1 1 z/z/ ) / \ ) z z \\ \p v NN \ \\ \ — NN \ \\ ____ --\ 1 I \ I \ \ \ \\\ \\\ \ \ \ \\ \\\ \ \ \\\ - / / \\ \\\ \\ \ \\ \ \\\ \ / \ \`\\ \\ NNN \\ \\ \ N \ \ \ \ \\\V NN N N \\\ \ \\ NNN N \\ N N N \ \\ N N NN \ \ \\ \ ''''" .--' \ \ \ \NN N\\ \k \\ \\ \\\\ \\ / j N\\\\ \\ \ \ \ , \ \\\\\\ \ \\\\\\\ \\\\ \ \ \ , \ N \ \N \ \O\ - NNNNN, --- -\` `„'"I;('iii) \\\\\\\\%\\"\\```` \\\\\\\\'\\\\"\ \N N \\ \ 'I TIME OF CONCENTRATION SHEET FLOW TOP ELEV: 802.00' BOT ELEV: 795.00' FLOW LENGTH: 100 FT SLOPE: 7.00% WOODED GROUND COVER Tc = 14.5 MIN \\\\N \\ TIME OF CONCENTRATION TOP ELEV: 795.00" SHALLOW CONCENTRATED FLOW BOT ELEV: 770.00' FLOW LENGTH: 233.72 FT SLOPE: 10.70% WOODED GROUND COVER Tc = 2.4 MIN NNN \ -*))//, 1 I — \\\ \\ j fly (t. NN\N \ NNNNN \:/-7,\ ,N\N:\\\ „\,\,\\ \\\:\\\\„\\ \\\ \ 0 \\ MI \\\\\! '\\\\V\ / / ( , —v ,e. \ \ \ \ —\ \v l'b° 0 ) \ \ \ \ ' \,\ \\ 7 i ' \ ' \'<\ 1 I I \ \ 7 \ , ,k,,• j I , \ v\\ I ;,! 1 \\j N `4\' \ \ NN NN ' ' N NNN N \N NN \\\ \NNN`\ \\\\\\\\\\ 770 805 /1 / / \% II ill '1 I 11 I \ III) \ (// //// \\ 1 I 1) ‘9J //////// / / V (#4 PEBA' ///// //I //// L ///, / /7 // // 71° / 0 Y/7 z 760 %y L 7 8 8 y/i/ 4/7 V ( I I / 2 791- /P/ / z 1519 LT 770 773- 774 r/i/ /// \ \\ /1//////i \ ///////87////i- \ 776 7//////// //1 \\\\ 7 777 qiJ///// ////////K .//////////// -79 ///////Pgr L—, //////// -78°- //// //////// 83 (07/// L 1-785 4//////////kil —810 ////4/ I— 89 /7/W / V N // 1) _79 /// y I\ I I 1)N-792 J// / / z )1 0/ / / (0 9N / // //11/// // ////// /' / / )///// / / //iii( \ ////',/ (/ \rii////i/ /// / \ \I I I I I k ‘9\ " / I/ / , , , ( ( / I.6°4 I I I \\ / / 2 / i 1 I \ \\ \ \ \ \ 1 1 1 0 i \ \ /H \ \ \ \ \ \ N / i / / 1 ) \\ 11 / / ) \ cP -810 810 TIME CONCENTRATION SHEET FLOW FLOW LENGTH: 100 FT SLOPE 10.2% WOOD D GROI"‘ID COVER EIR (#4 REBAR) E:1402534.01' EL:806.72' /// 805 785 790 815 820. !LINETYPE LEGEND: SYMBOL DESCRIPTION PROPERTY LINE STREAM BUFFER BZ (50') GRADING LEGEND: SYMBOL DESCRIPTION 200 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 25 50 100 NORTH CN cll 00 0 • rNrN www.whnarch.com 0 0 0 049484 • SEAL STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU CH NOLOGY WASTE WATER Solutions CO (13 ri LLI t CI) al (13 HUBER TECHNOLOGY co z ce Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 4. PRE -DEVELOPMENT (2018) STORM DRAINAGE AREAS Sheet Title C-520 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Controctors shall verify ond be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.20 Drainage Area Maps.dwg Sep 20, 2022 - 2:04pm / sN\\N\ .);\ \\\\ N NN, :NNNN \ \\\ \ NN NNN NN \V \\\\\ -)\\\\\\ \\I\ 78 \\\ 1\\\,\\ PYI?1\\\\ \\--14,\ \I\ I I \\ 0\\\\ NN \V*\\\\ \ \\\VV NN , NNV \\\ N I I \ / \-\\ \\1\_ A\A \\\ 15 n // /ii \\ I F R ( 73AR) / \\ \\\NNNN \\V \ / / 7/7/ \ \/ / / / _ _ ��\_ \\ \ °\ \\vJ / / / / \\ \\\ j / ( / \\\\\\\\N\\\, \ \ \ \\ \ _ /v/ // 7/ %;] NVN \\ ,\\\\\\\\\\\‘, \N \\ \\ \\ / NN N N N \ \\ —/ 760 -- •755//� / 750 ////j�-�\�\�\ \\\ / N // - l )//4 /(//// z z / ( z z 1 / / / Z / / / \\ \\\ Z 7 7 — r[i z \ � / N \ / \\ 90\\ \\\\ 1\1Pr--/ / //I -7‘ /// ////k-7 7% -= — 11 NN 1/8101,:--" j1/1/0/ _ \ \ //// // - �i _ \\\\\ Lt- ---4j/////////////////////, Iiivf1/9////-- Ltt JJ9/0////////1/7 z / ////////////.z \\4 \;,) \ If / .\;\N\\‘\\\1\(t,)\))\)\/;1)(/)//(i/1// N " \\ NN ( / \\\ NN, \\ , , \,\,\ \\ N\ \\ \\A\\ 11 44 \ \ \ N N \ 0 \ (_ I L ( ' \ \ I / \\\[\ \II 1,1 \ , , DRAINAGE AREA 1 4.43 AC Qio = 5.50 cfs \ci ( z (i(N (I ot-ZBAR 11 7) \\ 745 -74o ti / \ 0 DRAINAGE AREA 2 12.49 AC Qio = 15.5 cfs \is\ , ( 4, /7, AIR h ///,/, / // / ' /8/// / / / I I // / / / / / / / ( ) I 1 ' 1 / // // // // / // // SITE DENSITY IMPERVIOUS AREA / TOTAL SITE AREA LOW DENSITY / -7_ -7-7 I r)( _//7 7 / III Ill% f- I /I:: -2_, \ \ \ \\\ \\\, \\`` \\`` 2-7// II 11 1 1 I ( \\ ,!( \\\ \\ \\\ \\\\\ \\\ Jilin I A / L- / ////////////'; \\ L /// /////r NN -//////////////r --14/////////fi r,/ EIR (#4 REBAR) EL:806.72' N //' / / / / / / , ( / / / / / / / , ')(/// / / / (I/1 i ( , \ H\\ \ \ \ \-- \NN ` '''' \ ........, ' \\\\\\ \ \ \ \ , _ no \ \ \ z ' .---- - / / / ' / — (/ /C(// /// iI 1 ( / 7 ?::,p,66pptN.i:,"iii:/,g117A7/s//7//: i 1,1•1131°I'l Illi /7, / LINETYPE LEGEND: SYMBOL DESCRIPTION PROPERTY LINE STREAM BUFFER BZ (50') GRADING LEGEND: SYMBOL DESCRIPTION 200 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. • 20 40 • 80 NORTH co 0 • CNI if) cO www.whnarch.com 0 0 0 SEAL 049484 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 ER CH NOLOGY WASTE WATER Solutions 0 U) -1a° (13 0 al al HUBER TECHNOLOGY 00 Lt ce Ljj LLI a Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 4. PREVIOUS PHASE OF DEVELOPMENT STORM DRAINAGE AREAS Sheet Title C-521 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas ond designs. These plons, ideas ond designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Controctors shall verify ond be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.20 Drainage Area Maps.dwg Sep 20, 2022 - 2:04pm \\ \`' \ \ \ \\\\\ \ \\ \ \\\\\\\ \\ \ =\\ \\ \\ \ \\\\\\ \ N \ ---N"\\\\\\N \\\\\\\ \ \ \ \ \\\\\\\\\\ N N N N \ --..,•:- ----- __T-_-_ ___.\ \ \ \ \\\\ \ \ -�\ \\ \ \ \ \ \\\\ \ \ \\\ \ N _ \ \ \\ \ \\\ \N \ \ \\\\ \\\�_ \ \ \ \ \_ —_ ,1 \ I \\\\\\\\ �� ' \�\ 1 \\\\\\\\\� \ \\\ \ \ \ \ \\ �\\ \ \ \ \\ \\\ \ \\ \\\ \\\ 1 \\\ \\ \\ \\\ \\\ \\ \\ \N \ \ \\ \ \\ \ \- 2 \ \ \\ \\ \ N) / \\ \\\ \\\\\\\\ \\/ \\ \\\ N NN \\\ \ \ N \ \ \\ \\\\\\\\\ \ \\\ \\\ \\\\� \\ \ \\ \ \\ \\ \\\ \\ \\\ \\ \ \\ \ \ \N \�\ \\ \\ \\ \\\\ \\\\ \ --\)\\\ \\\\\ \\ \\ \ \ \\ \� \\ \\\\N \ \ \ \ \ \\\\\\\ \ \ \\\\\\\\ \ \ \ __v \;\VN - NiNNN \\\ \V\\ N 40 \\'\\\ \\- k0\\\\\\ 7.385 0 ‘\\\\4\\\ -\\\.,„\„\\ ok\\ \\16 \4?'\s,\; \\\\t\ \\\ NN \ \\\ // /% // "" \\\V\\\\\\' N\\\ \\:\ \\\\\\\:\7 \\ \\\\ \\\ \\ \\ \\\`` \\``'?1)111111111,1111111,11 // 760 // •7557/ 750 745 4/) EL 06.7 rif //0/)'-' yz NN \\\ J/////////K,_ `v /////////////- - ///////////' \\\ \\\ -\\\\ N //$7 DRAINAGE AREA #2 NEW IMPERVIOUS AREA = 5.77 AC 7,z , / / / // / / z z / z / / /7//7 / / / / / / / / / / ////// / / / / / / / . //// / / / / / / / / / / / / / 11/ / / // / / / / / / / / /( )//// 'JAN / v / / / / / SITE DENSITY IMPERVIOUS AREA / TOTAL SITE AREA 9.72 AC / 20.06 AC = 48.45% > 24% HIGH DENSITY \il, / / / 1/ / / / / // _ _ _ / / , z iiii/////////77///://,; iiii 1:i2.t7ioN4,137.1T/I I/ / iiii /1 (/// ////'% 1 i'it/o 1/// / , Ti2T6g8 L.,FL'odpi4: i 1 / z 7 i II 1 i 10/7 //' \ 1111 /II , !!. Illi I 1 / _-_ x / LINETYPE LEGEND: SYMBOL DESCRIPTION m LIMITS OF DISTURBANCE PROPERTY LINE BZ STREAM BUFFER (50') GRADING LEGEND: SYMBOL DESCRIPTION , PROPOSED JUNCTION BOX PROPOSED CATCH BASIN PROPOSED AREA DRAIN 11111111 -- m PROPOSED STORM DRAINAGE 200 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR NOTES: -I. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. • 20 SCALE: 40 • 80 NORTH co co Nri 1-6 www.whnarch.corn ;.+1 0 0 0 7-'1= IS" ; • 4881 -749. "ye r,t .6\ STEWART CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU ER ECHNOLOGY WASTE WATER Solutions clo 0 al CC' 0 CO (13 HUBER TECHNOLOGY co z ce LLI 0 Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET . 1 09.20.2022 LCNR - REVIEW COMMENTS 3. 4. 6. FINAL PHASE POSTDEVELOPMENT DRAINAGE AREAS Sheet Title C-522 VaiN ARCHITECTS hereby reserves their connnnon law copyright ond other property rights in these plons, ideas and designs. These plons, ideas and designs are not to be reproduced, changed or copied in ony form or manner whatsoever, nor are they to be ossigned to ony third porty without first obtaining the express written permission fixxn WEIN ARCHITECTS. Written dimensions on these drowings shall hove precedence over scaled dimensions. Contractors sholl verify ond be responsible for all dimensions and conditions on the job ond WHN ARCHITECTS must be notified in writing of any variations frcxn the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.20 Drainage Area Maps.dwg Sep 20, 2022 - 2:04pm \\\\\\\\\\ \\ ,\ \\ \\ NN ,53 \\\\\\ \\\ \\\\\\\\\\\ \\\ \\\\ \ Ze \ N N - N \„,„� ss \ \ \ \ 1 \ \ \ \\ \\\ \\\ \ \ \"\ \\ \, N' \ \ N \\\\I \�` STORM DRAINAGE AREAS / \ \ \\ \ i \\\ \\\\\\\ vvvA vvv I.a..\a v \ A \ 1 Is \\\ \ \ \\\ ' \ \ \ \ STORM DRAINAGE AREAS v(A\\\\\.\\\,\,,\\\\ \ NN NN LOCATION DRAINAGE AREA IMPERVIOUS FROM TO C sq. ft. acres sq. ft. 02-DI 18-DI 16246 0.37 6036 0.57 03-DI 04-CB 6649 0.15 0 0.35 04-CB 07-CB 4489 0.10 3918 0.87 • • 07A-DI 08-CB 547 0.01 547 0.95 08-CB 09-CB 7658 0.18 7658 0.95 09-CB 09A-CB 6576 0.15 ir 6576 0.95 09A - CB 10 - CB 2375 0.05 2375 0.95 16-CB 17-DI 39377 0.90 12565 0.54 18-DI 19-DI 1 0.00 1 0.95 19-DI 20-DI 4511 0.10 4511 0.95 20-DI 7B - DI 8549 0.20 8549 0.95 7B - DI 07A-CB 1022 0.02 1022 0.95 22-CB 23-CB 8762 0.20 8762 0.95 24-CB 25-CB 5110 0.12 432 0.40 25-CB 26-CB 17327 0.40 10811 0.72 26-CB 27-FES 20139 0.46 15531 0.81 \\\\\\\\\\\\ /:;'-T-----___1_,,,-1-----::i;--->-_--Z---->71-1-1_ 7z7 7,Z zz zzz:1----/ --- -1- z zz 7;/,--- ---- z: _ - , _ _ _> -//l__ "---, ,,,,,,,, __________________,7 //////////'LL„-\ '1((/(\//71)7,27//7(_ ___? ___ „,„________ r _____ ////, ---- __iiiiii ( IL____. _. ___,__, ,,,,,,,,,,,,,---„, __ / / , /,/,,,,- _ ,//// , i 1 ,,,,,_,„,,,, ,„„,,,,,„ _,,,,„, _-__. ,, i _--.-_---- 1 ,„_ ___ _ ,______,„ ,„,__:________ -, /////,/,/,,c_____ --:171//77///(1,7-c \ , ,IIIII iiiiiiiiii .\\\ \\ viiiiiiii 1, . ((/ SCALE: EL 3115 025 806.7 "•-="7,/v-.;;_ //li 11,,i', __ i ii,\\,\7,-;7' Aiii,//ll ii:////i\ 77 ' zz ri- -- 4/////,,J(//!///%///,;"-:::: 1/////////// ' /////1\-- _ /, -,_ i /1//y/ - //////0/1///////////rr -I/ //////7///' - , : // /// : / / /;// / : : // // / 1 : :: /11/y- - / / //.- - - ///////// / / / /7 7 / i //////////, / //// 7 - ;f//////////// /777 - //////, / / / z/z // //// / / / / z z / / ////// / / , / ///, / , z , , /0/////////// / //// / / / /////// / ,,,, ROOF DRAIN AREAS LINETYPE LEGEND: SYMBOL DESCRIPTION m m LIMITS OF DISTURBANCE PROPERTY LINE BZ STREAM BUFFER (50') • • ACCESSIBLE ROUTE GRADING LEGEND: SYMBOL DESCRIPTION PROPOSED JUNCTION BOX PROPOSED CATCH BASIN PROPOSED AREA DRAIN PROPOSED STORM DRAINAGE 200 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR - - 200 - - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND GRADING NOTES. 28 - RD 29 - CO 5453 0.13 5453 0.95 7.10 0.011 29 - CO 36 - CO 0 0.00 0 0.95 7.10 0.011 30 - RD 31 - CO 8800 0.20 8800 0.95 7.10 0.011 32 - RD 33 - CO 8145 0.19 8145 0.95 7.10 0.011 31 - CO 33 - CO 0 0.00 0 0.95 7.10 0.011 33 - CO 35 - CO 0 0.00 0 0.95 7.10 0.011 36 - CO 19-DI 0 0.00 0 0.95 7.10 0.011 37 - RD 38 - CO 7620 0.17 7620 0.95 7.10 0.011 39 - RD 40 - CO 7398 0.17 7398 0.95 7.10 0.011 41 - RD 42 - CO 5952 0.14 5952 0.95 7.10 0.011 43 - RD 44 - CO 6480 0.15 6480 0.95 7.10 0.011 42 - CO 40 - CO 0 0.00 0 0.95 7.10 0.011 38 - CO 7B-DI 0 0.00 0 0.95 7.10 0.011 48 - RD 49 - CO 1496 0.03 1496 0.95 7.10 0.011 50 - RD 51 - CO 2721 0.06 2721 0.95 7.10 0.011 49 - CO 51 - CO 0 0.00 0 0.95 7.10 0.011 52 - CO 19 - DI 0 0.00 0 0.95 7.10 0.011 57 - RD 58 - CO 3000 0.07 3000 0.95 7.10 0.011 55 - RD 56 - CO 2088 0.05 2088 0.95 7.10 0.011 62 - RD 63 - CO 1810 0.04 1810 0.95 7.10 0.011 60 - RD 61 - CO 2440 0.06 2440 0.95 7.10 0.011 / / / 58 - CO 59 - CO 0 0.00 0 0.95 7.10 0.011 59 - CO 20 - DI 0 0.00 0 0.95 7.10 0.011 61 - CO 63 - CO 0 0.00 0 0.95 7.10 0.011 63 - CO 04 - CB 0 0.00 0 0.95 7.10 0.011 68 - RD 69 - CO 8387 0.19 8387 0.95 7.10 0.011 70 - RD 71 - CO 8465 0.19 8465 0.95 7.10 0.011 72 - RD 73 - CO 6495 0.15 6495 0.95 7.10 0.011 74 - RD 75 - CO 3581 0.08 3581 0.95 7.10 0.011 67 - CO 69 - CO 0 0.00 0 0.95 7.10 0.011 69 - CO 71 - CO 0 0.00 0 0.95 7.10 0.011 71 - CO 73 - CO 0 0.00 0 0.95 7.10 0.011 75 - CO 22 - CB 0 0.00 0 0.95 7.10 0.011 80 - RD 81 - CO 5280 0.12 5280 0.95 7.10 0.011 82 - RD 83 - CO 5333 0.12 5333 0.95 7.10 0.011 86 - RD 87 - CO 5963 0.14 5963 0.95 7.10 0.011 84 - RD 85 - CO 984 0.02 984 0.95 7.10 0.011 78 - RD 79 - CO 5280 0.12 5280 0.95 7.10 0.011 76 - RD 77 - CO 7133 0.16 7133 0.95 7.10 0.011 77 - CO 79 - CO 0 0.00 0 0.95 7.10 0.011 79 - CO 81 - CO 0 0.00 0 0.95 7.10 0.011 81 - CO 83 - CO 0 0.00 0 0.95 7.10 0.011 83 - CO 88 - CO 0 0.00 0 0.95 7.10 0.011 85 - CO 87 - CO 0 0.00 0 0.95 7.10 0.011 87 - CO 88 - CO 0 0.00 0 0.95 7.10 0.011 88 - CO 23 - CB 0 0.00 0 0.95 7.10 0.011 CN 00 r CL rri www.whnarch.corn ;.+1 LLJ 0 ikt 049484 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU ER WASTE WATER Solutions coo 0 LLI CO (13 HUBER TECHNOLOGY co ce Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET . 1 09.20.2022 LCNR - REVIEW COMMENTS 3. 4. 6. INLET DRAINAGE AREAS Sheet Title C-523 WHN ARCHITECTS hereby reserves their common law copyright ond other property rights in these plons, ideas and designs. These plons, ideas and designs are not to be reproduced, changed or copied in ony form or monner whatsoever, nor are they to be ossigned to ony third porty without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drowings shall hove precedence over scaled dimensions. Contractors sholl verify ond be responsible for all dimensions ond conditions on the job and WHN ARCHITECTS must be notified in writing of any variotions from the dimensions, conditions and specifications on these drowings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.90 Storm Drainage Details.dwg Sep 20, 2022 - 2:03pm NOTES: 1. ALL DRAINAGE AREAS TO A SAND FILTER FACILITY ARE TO BE STABILIZED PRIOR TO INSTALLATION OF SAND. 2. CLEAN OUTS IN THE UNDERDRAIN SYSTEM ARE TO BE PROVIDED EVERY 50' MINIMUM. CLEAN OUTS SHALL HAVE WATER TIGHT, VANDAL PROOF CAPS AND EXTEND 6" ABOVE THE SURFACE. 3. DEMONSTRATION OF APPROPRIATE SAFETY FACTORS AGAINST FAILURE THROUGH GEOTECHNICAL ANALYSIS BY I A LICENSED PROFESSIONAL ENGINEER SHALL BE REQUIRED FOR EMBANKMENT SLOPES STEEPER THAN 3:1. RIP -RAP APRON 4. WATER -TIGHT SEAL MUST BE PROVIDED BETWEEN ALL RISER AND PIPE JOINT CONNECTIONS. WQ� 00 70 00 PERFORATED STANDPIPE .ITI EARTHEN III _ BERM 11E11=111E11 11E111E111E111E11 1=111=111=1I 1 I=1I 1 I=1 =111E_111E111E111=111= V%%�\\j\/V,Vj\/j\%%›. �. LEVEL SPREADER OR RIP RAP APRON INSET \\ (1) INFLOW PRETREATMENT SEDIMENTATION CHAMBER (FOREBAY) SEE INSET FOR OPTION WQv 0 FOREBAY CLEANOUT PLAN VIEW #57 WASHED STONE SAND FILTER DETAILS RIP RAP ALL RIP -RAP BERM CLEANOUT PROFILE VIEW UNDERDRAIN COLLECTION SYSTEM . . SAND FILTER BED WQv ALL EMBANKMENT SLOPES 3:1 MAX • SAND FILTER BED UNDERDRAIN COLLECTION SYSTEM OUTFLOW OVERFLOW SPILLWAY AS NEEDED OVERFLOW SPILLWAY AS NEEDED OUTFLOW SPECIFY SEEPAGE CONTROL MEASURES NTS N N N N N N N N N SEDIMENT CHAMBER (2,700 SF) \ \ \\ \ UTFALL -1 • 14 \N. \ \ \ \ \ \ 6 ERFORATED PVC UNDERDF041�I \ N \ PIPE @ t.Q0% SLOPE \ \ \ \-..______„ \ RIP -RAP BERM TOP OF BERM: 772.00 SAND FILTER PLAN VIEW SECTION \ \ \ \ \ \\ \ \ \ \ \ \\ \ \\\ \ \ \\\ 14-MH \ \ \ \ \\\\ \ \ \ \ \\ \\ \\ \ \ THE TOP OF THE SAND FILTER MEDIA MUST BE PROTECTED. FILTER FABRIC WITH A LAYER OF WASHED #2 STONE ON TOP. 12" MINIMUM SAND FILTER MEDIA NOTES: ALL DRAINAGE AREAS TO A SAND FILTER FACILITY ARE TO BE STABILIZED PRIOR TO INSTALLATION OF SAND. 2. UNDERDRAIN PIPES SHOULD BE MIN. 6" PERFORATED SCHEDULE 40 PVC (PER AASHTO M278) OR DOUBLE WALL HDPE (PER AASHTO M252). PERFORATIONS SHOULD BE 3A" SPACED 3" ON CENTER ALONG 4 LONGITUDINAL ROWS SPACED 90° APART. TYPICAL SECTION PRECAST STRUCTURE W/ MONOLITHIC BASE A FILTER FABRIC FILTER FABRIC PERFORATED PIPE/GRAVEL UNDERDRAIN SYSTEM 0 36" RCP TRASH RACK A 4.0 0' (2) \\\\\***e °.v 1 1 6, • iwAta4 • • .1001 I I 141. PLAN OUTLET CONTROL STRUCTURE #1 GRAVEL/STONE SURFACE V 50-YR W.S.E. 773.07 V 25-YR W.S.E. 772.99 V 10-YR W.S.E. 772.84 7 2-YR W.S.E. 772.24 0 WQv 771.85 -\ FINISHED GRADE 0 N N 6" PVC PERFORATED UNDERDRAINS (EMBEDDED IN GRAVEL) CONNECTED TO 10" PVC HEADER 769. SAND FILTER MEDIA (ASTM C-33 SAND OR EQUIVALENT) 0 NTS \ \\ X \ SEEbp\ L 1APRON 4/C-490 \ \ \ \\ \ \\ \\\ A 11P' \\ ,A11,411110111 I Wirt (411Kr7 N� \ l i� a1 \ \ EMERGENCY SPILLWAY INV: 773.00 13-OCS OUTLET CONTR.-DI-STRUCTURE STRUCTURE SEA ETAIt 2/C-590 SANDFILTER AREA (2,200 SFr - SEE DETAB-I/C=590 imielV0145111111111.1111"1111 - 12" E EV 772.0 10 TOP OF BERM ELEV. 774.00 Lr J L J 4 L J L J 4.00' L- J L J INV, ELEV. 766.00 7.00' I 6" TYP, DOUBLE BUTYL MASTIC SEALS ALL JOINTS, TYP. STANDARD STEPS PER NCDOT STD DTL 840.66 PRECAST STRUCTURE W/ MONOLITHIC BASE 36" RCP 0 5.95% SLOPE 4 SECTION A -A www.whnarch 211 �+1 U 0 U U U�) H- U 0.k11111l�l1rl1 CA 0 rfJ`�r ,¢OF f�'L•„/„. SEAL y 049484. 09. 1 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU TECHNOLOGY WASTE WATER Solutions 0 CO CZ HUBER TECHNOLOGY CO CN Lil N- j Lil 0 Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 5. SCM DETAILS Sheet Title C-590 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plans, ideas ond designs. These plans, ideos and designs are not to be reproduced, changed or copied in ony form or manner whatsoever, nor are they to be assigned to any third party without first obtoining the express written permission from WFIN ARCHITECTS. Written dimensions on these drowings sholl have precedence over scoled dimensions. Controctors sholl verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of ony variations from the dimensions, conditions ond specificotions on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.90 Storm Drainage Details.dwg Sep 20, 2022 - 2:03pm N C 0 I -I -v m 0 rn m ID I --I rn z r H03 ONIMVHO OHVONV1S HSI1ON3 SHEET 1 OF 1 840.14 1 PLAN WITH GRATE & FRAME REMOVED SEE NOTE SECTION X-X 2" WEEP HOLES BRICK COPING(INCIDENTAL) TOP ELEVATION STD. 840.16 FRAME & GRATE DOWEL(SEE NOTE) GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 640.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. PIPE THIS SIDE - 18" fO SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. TOTAL CONTAL FOR MINIMUM HEIGHT, H C.M. R.C. 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" /� f 2'-3" f J 0.648 0.023 0.036 18" / / 2'-6" / / 0.703 0.033 0.049 24" / /// 3'-0" fff rr 0.814 0.059 0.085 30" 3'-0" 2'-0" 3'-6" 0.222 0.222 0.925 0.092 0.127 6- DOWEL a. 0 SHEET 1 OF 1 840.14 CONCRETE DROP INLET NTS N 2 2 C 01 13 H m 0 z C, m m C, c) 2 co 0 H z H03 ONIMVHO aHYaNVIS HSI1ON3 SHEET 1 OF 2 840.02 BACK OF CURB X m ?•d PLAN TOP ELEVATION D m CD 1 0-� A o• �-r SECTION Y-Y RISER HT. VARIES - 6" WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES FRAME GRATE AND HOOD SEE STD.NO. 840.03 0' A WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION P] 6" TOP ELEVATION Ilrillt SEE NOTE SECTION X-X FRAME GRATE AND HOOD SEE STD.NO. 840.03 6" GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. STEPS - STD. NO. 840.66 TOP ELEVATION SEE NOTE T 6" SECTION J-J WHERE 30" TO 36" PIPE IS USED PLAN TOP ELEVATION SECTION M-M WHERE 42" TO 54" PIPE IS USED PLAN ENGLISH STANDARD DRAWING FOR z I --I U) a DO 11- LLI V 11- W CC Z 0 C.) SHEET 1 OF 2 840.02 C3) CONCRETE CATCH BASIN (1/2) NTS SILT FENCE WIRE MES TERRACE DETAIL 2' BENCH SHOULD BE GRADED AT 0% LONGITUDINAL SLOPE (ON -CONTOUR) 3' WIDE BENCH 0.5% 1 OR FLATTER 2 _11 OR FLATTER 2 10' MAX. 10' MAX. NTS N --I x 73 C rn rn 0 11 71 m NOIl3NnI' 313U3NOO 0 X H03 ONIMVHO OHYONVIS HSI1ON3 SHEET 1 OF 1 840.31 INLET PIPE 6" .15 E OPTIONAL MANHOLE SEE STANDARD 840.54 FOR MANHOLE COVER & FRAME OPTIONAL BRICK MAY BE USED TO ADJUST FRAME & COVER TO SURFACE ELEVATION MAX. 1' SECTION X-X SECTION Y-Y OUTLET PIPE E OR F SECTION C-C OR D-D GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1". USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS TO CONSTRUCT THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. N L DOWEL DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE REINFORCEMENT BARS "A" TOP SLAB DIMENSIONS CUBIC YARDS IN BOX TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU.YDS. PIPE SPAN WIDTH HEIGHT D A B H NO. LENGTH E F TOP SLAB BOTTOM SLAB WALL/ FT. OF HT. LBS. REINF CU. YDS. MIN. "H" C.S. R.C. 12" 2'-0" 2'-0" 2'-3" 12 2'-9" 3'-0" 3'-0" 0.167 0.167 0.185 22 0.750 0.015 0.024 15" 2'-3" 2'-3" 2'-6" 12 3'-0" 3'-3" 3'-3" 0.196 0.196 0.204 24 0.902 0.023 0.036 18" 2'-6" 2'-6" 2'-9" 14 3'-3" 3'-6" 3'-6" 0.227 0.227 0.222 30 1.065 0.033 0.049 24" 3'-0" 3'-0" 3'-3" 16 3'-9" 4'-0" 4'-0" 0.296 0.296 0.259 40 1.434 0.059 0.085 30" 3'-6" 3'-6" 3'-9" 18 4'-3" 4'-6" 4'-6" 0.375 0.375 0.296 51 1.860 0.092 0.127 36" 4'-0" 4'-O" 4'-3" 20 4'-9" 5'-0" 5'-0" 0.463 0.463 0.333 64 2.341 0.132 0.178 42" 4'-6" 4'-6" 4'-9" 22 5'-3" 5'-6" 5'-6" 0.560 0.560 0.370 77 2.878 0.180 0.243 48" 5'-4" 5'-4" 5'-3" 26 6'-3" 6'-4" 6'-4" 0.743 0.743 0.407 111 3.623 0.235 0.317 54" 5'-10" 5'-10" 5'-9" 28 6'-7" 6'-10" 6'-10" 0.865 0.865 0.444 126 4.283 0.297 0.401 60" 6'-6" 6'-6" 6'-3" 30 7'-3" 7'-6" 7'-6" 1.042 1.042 0.481 145 5.090 0.367 0.495 66" 7'-1" 7'-1" 6'-9" 32 7'-10" 8'-1" 8'-1" 1.210 1.210 0.518 169 5.917 0.444 0.589 ENGLISH STANDARD DRAWING FOR 0 CONCRETE JUNCTION 12" THRU 66" SHEET 1 OF 1 840.31 CONCRETE JUNCTION BOX NTS N 2 2 C U1 13 I -I 'v m H03 ONIMYHO auvaNb1S HSI1ON3 SHEET 2 OF 2 840.02 6" #4 BARS "V" @ EQUAL SPACES #4 BARS "V" @ EQUAL SPACES 3" E--j 6” Ii�rr ' 1 } co 2 m HE a w 0 a IL S� } PLAN OF TOP SLAB 6"#8 "W" BARS SECTION R-R a 6" co Q m @ EQUAL SPACES LL SECTION S-S N 6" DOWEL #4 BAR EXPANSION JOINTS 4'-6" 4'-6" STD. 840.03 FRAME,I GRATE & HOOD IIIIIIIIIIIIIIH N\ \ „ , , -- '- 111111111111III I--- 6' 0" PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP USE ON GRADES TOP FLAT ELEV.EXPANSION JOINT 2% AND UNDER GRADES 6" EXPANSION JOINT 8" USE ON GRADE-SIIVER 2% EXPANSION JOINT r/ 1'-O" 10" MAX. A I_ .v. DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES EXPANSION JOINT TOP ELEV. ) NORMAL GUTTER LINE 6" DEPRESSED GUTTER LINE 6'-0" ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU.YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U BARS-V BARS-W TOTAL LBS. TOP SLAB BOTTOM SLAB 3TOT.CONC. G NININII IGHT• H D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH C.M. R.C. 12" 3'-0" 2'-2" -- -- 2'-9" -- -- -- -- -- -- -- -- -- -- 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-O" 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-0" 4 1'-5" 2 3'-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-0" 4 1'-11" 3 3'-9" 3 3'-9" 43 0.161 0.358 1.714 0.132 0.178 42" 3'-0" 2'-2" 4'-5" 5'-3" 1'-5" 3'-2" 4 1'-8" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 48" 3'-0" 2'-2" 5'-O" 5'-9" 2'-0" 3'-2" 4 2'-3" 3 2'-11" 3 2r-11" 35 0.145 0.352 2.052 0.235 0.317 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.180 0.386 2.387 0.297 0.401 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT ENGLISH STANDARD DRAWING FOR z H N a DO 11- C.) LU 11- W CC C.) 0 C) SHEET 2 OF 2 840.02 (4) CONCRETE CATCH BASIN (2/2) NTS N ; 0 O Z 0 N w 0_ CT_ OUTER vv////// II HAUN1CIHINGI BEDDING I I I Do/3 -� ~ I I I III I I I - III- III -(III /AA/TR NCH WIDTH MUST BE WIDE �� /\, ENOUGH TO ACCOMODATE / COMPACTION EQUIPMENT. \/ \/\i\i\\i\\i\i/\/, \/EXCAVATED TRENCH WIDTH/ \j\‘\jvvvv i 9.1 RCP PIPE DIA. 2"-15" 8" 18"-24” 10" 30"-48" 18" RCP PIPE (6) STORM PIPE TRENCHING I I -I 1 BEDDING AND HAUNCH I:MATERIAL TO BE 1CAGORY I,II,&III SOIL PE 11-11' IMIDDLE I -I BEDDING -LOOSELY PLACED AND I 11 I I11 I I1 UNCTYPED 4P NCSTAL BEDDINGTED TIIONS* I I 1 1EXCEPT IN I * REFER TO AMERICAN CONCRETE PIPE ASSOCIATION DESIGN DATA 40 FOR MORE INFORMATION NOTES: 1. PROVIDE BEDDING IN ACCORDANCE WITH SPECIFICATIONS. 2. SOIL IN OUTER BEDDING, HAUNCH, AND LOWER SIDE ZONES SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS THE MAJORITY OF THE SOIL IN THE OVERFILL ZONE. NTS www.whnarch.com C F- 0 U 0 ) U U U uJ 0 U) O Qn `�tk11111l�l�rffr \\ CA 11 04SLAL { . f /• •:''G1NFC "/ 'Ib t3AFkO ��� 08.25.2022 fI�!)IIIT1l4�5 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU WASTE WATER Solutions 0 CO (13 CI 0 (13 CO HUBER TECHNOLOGY oo _1 1_ < o z cz Lil LLI Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET GRADING AND STORM DRAINAGE DETAILS Sheet Title C-591 • WHN ARCHITECTS hereby reserves their common law copyright ond other property rights in these plans, ideos and designs. These plans, ideos ond designs ore not to be reproduced, chonged or copied in any form or monner whotsoever, nor ore they to be ossigned to ony third party without first obtoining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify ond be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-05.90 Storm Drainage Details.dwg Sep 20, 2022 - 2:03pm ,-75/ 1" DEPRESSION „ u g - . / a 1 u . %////////I I////////I i SECTION G—G 2'-31/4" 1 16 „y SECTION H—H " Cr) N 4,,NI 15/8„ FG 1 1'-75/8" I� H 412" 1'-75/8" PLAN OF GRATING CAST IRON 1/8„ 1" 21/8 „y f 3'-33/4" - 1/8„ 3' 2" 3'-134„ 3'-6„ SECTION E—E 1/8 „ E 3'-6" F 1 F- - PLAN OF FRAME CAST IRON 1/8"� 1/8" /$ „ 1" 1/8" 21/8'_ E _f 2'-134" N N 2'-6" SECTION F—F 0 co r} QQ CC LLJ0HZ 00co_ CC W QQLL_ QC -)=OH (OW0J H CC 00U)cc Z H 0 H r W 0 0 T ROADWAY STANDARD DRAWING FOR FOR USE WITH STD. DWG.S 840.14 AND 840.15 SHEET 1 OF 1 840.16 DROP INLET FRAME AND GRATES NTS Co A 43" B C C C C C ) ) I ) C ) ) B PLAN FRAME, GRATE, & HOOD ASS'Y SECTION - AA SECTION - KK NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED. A ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT } WALL SECTION SECTION - BB 6" I 2, O„ 6" 3 3'-0" C 3 C M a 1 III I 3'-0%8" R N 21/8, I I F— SECTION - LL 1 I1 1:11 SECTION - PP 11/2" 3/ 2'-0 II 434" /is11 " 2-111/2" R f HOOD ELEVATION N - 21/8" SECTION - MM 13/8" SECTION - NN 0 N Ln� 711 F— Lt) SECTION - JJ 55/" 45/8" SECTION - RR ROADWAY STANDARD DRAWING FOR O O CATCH BASIN mo U Q UJ Q z Q CC cnl— o E W Q CC LL CC 0 LL SHEET 1 OF 2 840.03 (3) FRAME, GRATES, AND HOOD (1/2) NTS NOTE: FABRICATED FITTINGS ARE AVAILABLE IN TEES, WYES, REDUCERS, 45° BENDS. WATERTIGHT (WT) JOINTS SHOWN. SOIL -TIGHT (ST) FITTINGS ARE ALSO AVAILABLE. FINISHED GRADE INSERT INJECTION MOLDED, GASKETED SPIGOT BY BELL REDUCER NYLOPLAST CLEANOUT END CAP ADJUST GRADE PER GRADING PLAN (USE METAL END CAP IF IN PAVEMENT) FABRICATED HDPE ST 45° WYE N COLLECTOR LINE SEE GRADING AND STORM DRAINAGE PLAN (2) DOWNSPOUT CONNECTION U' U' BUILDING FACE DOWNSPOUT ADAPTER INSERTED IN RISER PIPE FABRICATED HDPE ST DBL. MITER 90° BEND FABRICATED HDPE ST DBL. MITER 90° BEND WT BELL -BELL COUPLER (TYP) 6" HDPE PIPE (TYP.) NTS t I. t, J 4 a 4 4 4 P 4 DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. TYPE "G" TYPE "E" TYPE "F" /A WATER FLOW SAG WATER FLOW WATER FLOW SAG F WATER FLOW TYPE "F" TYPE "E" TYPE "G" 2'-113/4" A co 014111 v 41. v v B 0UiI1111i1i1i11111i1i111�1 21/4 " I L 1/2„ A 1 1/2 " 234 „ 9 /8" 9/8" SECTION B-B SECTION A -A RAISED FLOW ARROW HIGH 23�r._ TYPE - F I TYPE - E z 0 H H Q Q H cc 0 LL0HZ 00co_ LL'aa�= QU°COH CnHWOJ 0 CC O U) Q z cc co CL r W 0 1 0 RAISED FLOW ARROW /6„ HIGH 23/ 2'-113/4" p TYPE G /8„ SECTION A -A ROADWAY STANDARD DRAWING FOR z 0 H 0 0 CC 0 z I— C') z 0 W Cl) D cc 0 U- SHEET 2 OF 2 840.03 (4) FRAME, GRATES, AND HOOD (2/2) NTS DESIRABLE DRIVEWAY GRADES BERM 6" A am- 5'-O" 5'-0" 5'-0" ROADWAY PAVEMENT 3" . . 6" 6' *+2% GRADE WHEN THIS IS SIDEWALK LOCATION +2% GRADE WHEN THIS IS SIDEWALK LOCATION *SIDEWALK LOCATION (DO NOT PLACE SIDEWALK ON BERMS LESS THAN 6' WIDE.) +8% OR FLATTER -2% OR FLATTER +15 % OR FLATTER — +15 % OR FLATTER _ — — — — — -8% OR FLATTER 15 0 — — — — _ o OR FLATTER DESIRABLE OR MAXIMUM DRIVEWAY GRADES BERM WIDTH A B DIST. GRADE DIST. GRADE 8' OR LESS 5'-0" +2%* 2'-6" +5% 8' OR LESS 2'-0" +6% 5'-6" +2%* 10' 4'-0" +4% 5'-6" +2%* 12' & OVER 4'-6" +4% 7'-0" +2%* MAXIMUM DRIVEWAY GRADES BERM A B 5'-0" 5'-O" *+2% GRADE WHEN THIS IS SIDEWALK LOCATION * +2% GRADE WHEN THIS IS SIDEWALK LOCATION ROADWAY PAVEMENT + 16% — -4% 0 --- -150 -- 5'-0" `250- z O Cr) H Q LL J a 0 0 = CC a w Q Q L Q O cc H U)HuOJ OCC OU)cc CO I—. T W C1 ROADWAY STANDARD DRAWING FOR DRIVEWAY TURNOUT DRIVEWAY GRADES SHEET 2 OF 2 848.02 (5) DRIVEWAY NTS N ;o N x L c Do 0 N _c 0 Cr) a, +,Z NN 0 Loco rn rn (1) 0) 0) o-C 00 N)U N. www.whnarch.com F- U 0 U) U C U `tklltiIIpj rffr \\ CA� ( SLAB { . 049484 /, 4D BAR-0.- 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU E R WASTE WATER Solutions HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 3. ---- 4. ---- 6. ---- GRADING AND STORM DRAINAGE DETAILS Sheet Title 0-592 ■ WHN ARCHITECTS hereby reserves their common law copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C6.00 Utility Plan.dwg Sep 20, 2022 - 2:05pm • - \\\ \ \` NN \ \ \\\\ � \�\ \\__�__ \\ \\ \\\\ \ \ N, W \X \\\\\\ \� N\\ TOP OF BANK —ELEVATION: ELE V TION: 776.00'\\ \ \\\ \ \_ BOTTOM OF POND ELEVATION: 771.00' \‘A NN \ \ \ \ PROPOSED 6" PVC FIRE SERVICE \ \ \ • N PROPOSED 6" FIRE HYDRANT ASSEMBLY \\\\\\\\\ \ \_ \\\ \ \ \ \ \ N 1 REMOVE EXISTING BLOW -OFF AND GATE \ \ \\\_ \ \ —\ VALVE AND EXTEND 6" PVC FIRE SERVICE \ \ \ \\\_\\ \\ N \ \\ \\ \ \ \ \ \\ \\ \ \ \ / \ \ \ \\\\ \\\\\ \N \ \ / \\\\ ,\\ \ \\N\\ \, \ „,, ,\\ \\\,„ \(\\,\,\\V.\\* \ ,, \\ \\\_\ _,,\ \\_\,,, — I \\\\ 1 \\ \\ \ \\\,,„ \ \ \ \ \\ ,,,„ ,,„ i\ \ \\\\ \\ \\� \\\ N\\ \\ \\ \ 1 ,�\ \ \ \ \\_ \ \\\ \\\ \ « 1 �\ ,, \\„_ \N\\\ \_\\ , � , \\ \\ IR( 41Y1 B R\ -_ `� \ \\_\\ \\ \\\ \\\\\_\\_ \ \__ \ \� _\ ___ N , ___,__ \\_ -,, \\ \\\\ _ \ \\N \\ \\ \\\� \\ \ _ \, \— \ \,, \\ \ . \ \ \ \ \ \ \ \ \ \ \\ \\_\\\ \ N \\\ \\N \\ \\\ NN‘ \NNNN\NNNN NN l \\ \ \\ \ _ \ // //7//// :_ \ \ / / / /_ / •1:::: •, ,.r tr_N iir --L. C,Y:- Wit:. i 1 / / zzz //= i z� %/// ///� //N N\\\\\\\\,\N\7\,\)\)/1)))J ��� \\A/ N\\\\\\\%\\\\\\\---- - Y ////////7 — --i / /7/ 7 / /7P•-- J i ((770 ( -- N ililiiii 1 ill 1(i(( III i II III/11111i i III ili 1, \ )2 // bi)i)(/(/(11/1/((' _ - //P/ II / 5-CO RIM ELEV = 791.09 INV IN = 784.83 INV OUT = 784.83 CONNECT 2" PVC DOMESTIC WATER SERVICE TO BUILDING (REFER TO PLUMBING PLANS) CO 1 RIM ELEV = 792.06 INV OUT = 780.44 PROPOSED 4" PVC SANITARY SEWER GRAVITY LINE 1-CO RIM ELEV = 791.93 INV IN = 780.75 INV OUT = 780.75 PS 1 RIM ELEV = 791.93 INV IN = 780.33 INV IN = 780.33 INV IN = 780.33 USE EXISTING E-ONE DUPLEX DX152 IN NEW LIFT STATION 2-STORY 1.5" PVC FORCEMAIN METAL BUILDING 2-CO RIM ELEV = 791.73 INV IN = 783.69 INV OUT = 783.69 EXISTING LIFT STATION TO BE DISMANTLED. EXISTING PUMPS TO BE RELOCATED TO PS-1 PROPOSED 90° ELL ON EXISTING 1.5" PVC FORCEMAIN 8-CO RIM ELEV = 792.00 INV OUT = 789.24 SERVICE/TO PASSIVAIN f / 7 / // II It' 11 1 ( 1\1 I )f) V111--81.11 j I / di/ / z 6-CO RIM ELEV = 791.84 INV IN = 788.31 INV OUT = 788.31 —f• //p///////, --/0/1/y/K — / 11///- — ' / / // — ///////// -1/11/// /////////// / Z / / / 7 / / Z / 1 / I / // / / ///// / / Z 7 ij //71////1 // / / / / / // /////// ////////// z WASTEWATER FROM PASSIVATION PLANT TO BE DISCHARGED THROUGH EVAPORATION SYSTEM ///////// PROPOSED 2" PVC DOMESTIC WATER SERVICE / 7 7 6" GATE VALVE EIR (#4 REBAR) REMOVE EXISTING BLOW -OFF AND GATE VALVE AND EXTEND 6" PVC FIRE SERVICE M PROPOSED 2" TAPPING SLEEVE AND VALVE ON EXISTING DOMESTIC WATER SERVICE DISCONNECT EXISTING 4" / SANITARY SEWER GRAVITY SERVICE FROM EXISTING PUMP STATION AND EXTEND TO PS-1 —ri 74e-1LI ) EIR /,/,/////;,:////////y/ // / / // // // z yz z zz 7> / ///////;/, ///, / / / / / z7 z / ir//;//// // / / / / / / / z z //////////, / / // / / / / / z / / / / ' / / / , / / / / / / / ' / / / / / / / / // / / ' / / ..// / / / / Al;/1,N,I,v7=:8(iiii/M/) / / / / / / / / / / / / / / / / // / / / / / / / / / 1 / / / ( 1 ( / / / / // / / / / ) I I l' / ' I / I ( (11 / / / / \ \ / / NO I () i I ,/ c \ \ ' \ \ i'\ A \ \ \\ ' \ ' \ \ \ \ \ s \ \ N I 0 \ \ \ \ \ '-- \ \ \ \ \ , \ \ I \ \ N \ ` '` \\\ \ \ \\ \ / 2 / / \ \ _ K / / c \ \ \ \ \ \ \ \ ( \ \ N ---- --_ 1 \ ---- \ - BAR) / /1/ //7/ /,; / i ii / // //////r/2 1 / / (/ / / / / / 1 / /tit i 1 i i i / / , 7 1 I I I ii I( / / r 1 il ! I 1 1 1 1 i 1 // /' LINETYPE LEGEND: SYMBOL DESCRIPTION m m LIMITS OF DISTURBANCE PROPERTY LINE — EASEMENT SETBACK RIPARIAN BUFFER BZ (50') TP TREE PROTECTION FENCE • • ACCESSIBLE ROUTE UTILITY LEGEND: SYMBOL DESCRIPTION 6411": 0 0 0 0 FDC PROPOSED FIRE HYDRANT PROPOSED WATER VALVE EXISTING SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER MANHOLE PROPOSED FIRE DEPARTMENT CONNECTION (FDC) PROPOSED BACKFLOW METER PROPOSED POST INDICATOR VALVE (PIV) PROPOSED GREASE INTERCEPTOR PIV • 000 W EXISTING WATER LINE W PROPOSED WATER LINE SS EXISTING SANITARY SEWER LINE SS PROPOSED SANITARY SEWER LINE 300' HYDRANT COVERAGE CIRCLE NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND UTILITY NOTES. • 20 40 • 80 NORTH 00 0 • Lo 00 www.whnarch.com 0 0 00111.111+ SEAL r 049484 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU BE TECHNOLOGY WASTE WATER Solutions HUBER TECHNOLOGY oo 11 Lil LLI 0 Date Issued: AUGUST 19th, 2022 1 09.20.2022 LCNR - REVIEW COMMENTS UTILITIES PLAN Sheet Title C-600 • WHN ARCHITECTS hereby reserves their common law copyright ond other property rights in these plons, ideos and designs. These plans, ideos ond designs ore not to be reproduced, chonged or copied in any form or monner whotsoever, nor ore they to be ossigned to ony third party without first obtoining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify ond be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C6.00 Utility Plan.dwg Sep 20, 2022 - 2:05pm / . \ • MANUFACTURING BUILDING EXPANSION ) 20' -STORY METAL UILDING 17B60, 1-CO TO PS-1 PROFILE VERT SCALE: 1" = 4' HORIZ SCALE: 1" = 40' 805 -0+25 0+00 0+50 PROPOSED 4" SANITARY SEWER GRAVITY SERVICE LINE PROPOSED 4" SANITARY SEWER GRAVITY SERVICE LINE 2-STORY METAL BUILDING 1+00 1+50 AIR SYSTE V& TAN 2+00 2+25 \7-7 805 8-CO I III ill/ '1/III � III // I� 1 „b' �I I II / / I I' / � I \ PROPOSED 1.5" SANITARY SEWER I FORCEMAIN LINE I / I ,/ \: � II HI///I/ J/\7) 800 800 IN / t5u.33 (l.0 I) ( IN 780.33 (4-CO) IN 780.33 (1-CO) 795 795 EXISTING GRADE PROPOSED GRADE I 790 790 785 a 785 o ct Lo 780 16 LF 4" PVC 780 @ 1.97% 139 LF 4" PVC @ 2.12% 775 13 LF 4" PVC @ 3.29% 775 770 770 rn N- A rn rn oo cn w r N- N- F0 -0+25 0+00 0+50 1+00 1+50 2+00 2+25 PUMP TITI EXISTING 1.5" SANITARY SEWER FORCEMAIN LINE 4.7 I EIR I� �I 11 / I / II II #4 R BAR) i /////, # / /////' / / // --r///91// 9////////// "1414 i////// // / i / / // /7 1 if //////4///// i ///////////// // ' / // //// i /////////// ii////////;//////////, 11-7%///// // / / //////////// /// ///// // // 0 / / / '0/;/////// / / / / 0/ / / / / / //7/4///// / /, 7/ // il/ //// ///////11d/NNI \;:=877//39998/;i:/10\jlj/T(1/) /: ( / / / / i I ( / / !U\ \ \ \ \ i \\ \ \ . I 0 \ \ \ \ \ \ \ \ li/ / \ \ L 8-CO TO PS-1 PROFILE VERT SCALE: 1" = 4' HORIZ SCALE: 1" = 40' 815 -0+25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+75 815 810 810 805 805 800 UHUMP SIAIION) - 93 J 1) CO) — PROPOSED 2" DOMESTIC _ 800 SERVICE TO PASSIVATION PLANT 795 795 / — PROPOSED GRADE SERVICE PROPOSED 2" DOMESTIC TO MANUF. BUILDING _ 790 \ I ' PROPOSED 6" FIRE \ I SERVICE TO MANUF. BUILDING 790 ' / 785 . 1 18 LF 4" PVC @ 2.70% ' / N I 1r V a _ j 17LF4"PVC@2.70% 785 o co / M 129 LF 4" PVC @ 2.70% \ / co/ N v 780 \ \ \ 138 LF 4" PVC 2.70% @ 780 24" RCP 29 LF 4" PVC @ 2.70% 775 I PROPOSED 1 5" FORCEMAIN 775 INV: 781.40 770 770 1,--1,- co r O 0) M cooci r CA co W cocci N co CON co C) r LC) N-. 1,..:O r 6) CO CO coO r M CO COr O r O O -0+25 0+00 PROPOSED FORCEMAIN PROFILE VERT SCALE: 1" = 4' HORIZ SCALE: 1" = 40' 820 -0+25 0+00 0+50 1+00 0+50 1+50 1+00 2+00 1+50 2+50 2+00 3+00 2+50 3+50 3+00 4+00 3+50 3+75 4+50 5+00 5+50 5+75 820 815 815 810 810 / / 805 805 / 800 V / 800 INV IN 780.33 (1-CO) INV OUT 781.40 (FM) i / i / 795 EXISTING GRADE / / / // / 795 — PROPOSED GRADE / i N / 790 / 790 / j EXISTING 1.5" FORCEMAIN ..-_,..,-.------ ----- .......-_—_------ 785 EXISTING 15" RCP .....------- 785 CONNECT TO EXISTING 1.5" PVC FORCEMAIN 780 CI 780 PROPOSED 1.5" PVC FORCEMAIN 775 775 770 770 co• O Lf) O r r I.c`l O N N- O O 1-- co co. O 1-- co co • O N-r` N O • y, O 1--r` W r 7., O r c V 6 O r r coco O r 0o M V O O co p W />< -0+25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 +00 5+50 5 75 0 20 40 80 NORTH SCALE: 1 "=40' a.) C O x www.whnarch.com _C U 0 U) U U F- 0 klltillllllrll SEAL {: 049484 fdr3 { ,!G1Ne -•''\ '/{ ,4C) nARo '' 08.25.2022 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU .— E R TECHNOLOGY WASTE WATER Solutions 0 CI CO (13 W 0 .� ■> V / U (/) (13 CO U a) 0 0 HUBER TECHNOLOGY C) 0 Co N >- < QZ J 0 L.L Q U w_ 1- fl QO 0 Z ‘-w Z w 0 Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 3. ---- 4. ---- 6. ---- SANITARY SEWER PROFILES Sheet Title 0-610 ■ WHN ARCHITECTS hereby reserves their common law copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-C6.90 Utility Details.dwg Sep 20, 2022 - 2:06pm X'.\LCPW STANDARD DETAIL AND SPECIFICATICNSG013 DRAFT\04 STANDARD DETAILS\LCPW WL-01.DWG FLANGE SET 2" MIN. OVER FINISHED GRAD MIN. OR AS APPROVED 2'-6„ /\/ n 0 / \ \ <\\ , /$ \ 18" MIN. 24" MAX. COMPACTED EARTH 1 CUYD MIN. #57 WASHED STONE • ro A , NIpIW EBBA IRON MEGALUG OR APPROVED EQUAL REFER TO LCPW DETAIL WS-7 NOTES 1. ALL HYDRANTS SHALL BE MUELLER SUPER CENTURION OR KENNEDY K-81A 2. ALL HYDRANTS SHALL BE THREE WAY WITH 1-41& PUMPER NOZZLE AND 2- 2l HOSE NOZZLES WITH NST THREAD 3. ALL HYDRANT SHALL OPEN CCW 4. ALL HYDRANTS SHALL BE PAINTED WITH ENAMEL HYDRANT PAINT SAFETY YELLOW IN COLOR 5. ALL HYDRANTS SHALL BE NEW AND MANUFACTURED WITHIN THE CURRENT YEAR OF CONSTRUCTION. 6" C.I. GATE VALVE 6" D.I. WATER MAIN VARIABLE ALL CONCRETE BLOCKING PER LCPW STANDARD DETAIL WS-1 12" / DETECTION TAPE OVER PIPE MATERIAL LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 STANDARD HYDRANT INSTALLATION APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WL-01 STANDARD HYDRANT INSTALLATION XDLCPW STANDARD DETAIL AND SPECIFICATIONS\2013 DRAFT04 STANDARD DETAILS\LCPW WL-02.DWG TYPICALLY CLASS III BACKFILL. USE CLASS II BACKFILL WHERE UNSUITABLE TRENCH MATERIAL IS ENCOUNTERED OR AS DIRECTED BY THE ENGINEER. PIPE ZONE CLASS II BACKFILL 6" LIFTS UNDISTURBED SOIL TRACER WIRE J UNDISTURBED SOIL 18" + PIPE DIA \\/\ DEPTH VARIES <AN _1/ / 12" K>. -/\ PIPE DIA \j //\ 6" WIDE MAGNETICALLY DETECTABLE TAPE 18" - 24" BELOW GRADE USE FOR ALL TYPES OF PIPE ENTIRE BARREL OF PIPE TO REST ON BOTTOM OF TRENCH BELL HOLES CUT BY HAND NOTES: 1. BACKFILL TO A MINIMUM 95% OF MAXIMUM DENSITY WHERE EXCAVATIONS CUT THROUGH PAVEMENT, CURBS, AND UNDER OR ADJACENT TO STRUCTURES. 2. WELL TAMPED #57 STONE IS REQUIRED TO 6" BELOW OR HALF THE PIPE DIAMETER WHICHEVER IS GREATER WHERE ROCK OR WET/UNSUITABLE MATERIAL IS ENCOUNTERED. 3. ALL PIPE SHALL HAVE 36" MINIMUM COVER 4. TRACER WIRE SHALL BE MINIMUM 14 GAUGE NON COATED COPPER SECURED WITH MINIMUM 2 WRAPS OF TAPE TO THE MAIN AT 10' INTERVALS LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 STANDARD WATER MAIN TRENCH APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WL-02 STANDARD WATER MAIN TRENCH LCPW STANDARD DETAIL AND SPECIFICATIONST013 DRAFT., STANDARD DETAILS,GPW WL-03.DWG 2" THREADED COUPLING WITH 2 " PLUG COPPER, BRASS, OR BRONZE TYPE "K" HARD COPPER OR RED BRASS \ %\ // / \ 27;7%3 //,//\/ 2" THREADED 90° BEND COPPER, BRASS, OR BRONZE ;4 ; Y I VALVE BOX (SEE WS-7) VVVVVVVVVV \ \\\ \\ n n n In BRICK OR BLOCK TYPICAL THREADED ROD / (SEE NOTE) • • GATE VALVE SIZED TO LINE MJ PLUG TAPPED 2" CONCRETE BLOCKING (SEE WS-1) NOTES 1. ALL VALVES SHALL BE RESILENT SEAT GATE VALVES. 2. BLOCKING AND RODDING SHALL BE SIZED ACCORDING TO DESIGN CRITERIA 3. ALL BLOWOFF ASSEMBLIES WITH OPERATING NUTS DEEPER THAN 6' MUST PROVIDE A VALVE STEM RISER a'- 4 v. • LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 BLOW OFF DETAIL APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WL-03 �7� BLOW OFF DETAIL X:\LCPW STANDARD DETAIL AND SPECIFICATIONS\2013 DRAFT\04 STANDARD DETAILS\LCPW WS-04.DWG NOTES: 1. REFER TO APPLICABLE PERMIT FOR MINIMUM REQUIREMENTS GOVERNING HIGHWAY OR RAILROAD UNDERCROSSINGS. 2. STEEL ENCASEMENT PIPE SHALL CONFORM TO ASTM-139 WITH A MINIMUM ALLOWABLE YEILD STRENGTH OF 35,000 PSI THE DIAMETER AND THICKNESS OF THE CASING PIPE SHALL BE AS LISTED IN THE TABLE SHOWN IN THIS DETAIL. 3. ALL CASING SHALL BE A MINIMUM OF 3' BELOW GRADE AND EXTEND AT A 1:1 SLOPE FROM EDGE OF PAVEMENT OR BACK OF CURB. SEE AGENCY PERMIT FOR ADDITIONAL LENGTH AND DEPTH REQUIREMENTS. 4. USE CASING SPACERS (SEE DETAIL) TO MOVE CARRIER PIPE INTO CASING PIPE. SPACING OF SPACERS WILL BE DICTATED BY THE LENGTH OF CASING PIPE AND NUMBER OF JOINTS OF CARRIER PIPE. 5. USE A MINIMUM OF 2 SPACERS PER JOINT OF PIPE. 6. THERE SHALL BE NO WELDING OF CASING UNDER PAVEMENT. 7. IN CASE OF A CONFLICT BETWEEN THIS DETAIL, THE LCPW MINIMUM STANDARDS, AND A PERMIT, THE STRICTEST REQUIREMENT SHALL GOVERN. 8. SEAL CASING ENDS WITH TYPE II CONCRETE GROUT AND CONCRETE BRICKS, SO AS TO PREVENT THE ENTRANCE OF SOIL. LEAVE A GAP TO ALLOW LEAKAGE TO PASS IN CASE OF A MAIN BREAK. 9. FOR FURTHER REQUIREMENTS AND CLARIFICATIONS. SEE THE MINIMUM STANDARDS. REFER TO MINIMUM CASING REQUIREMENTS. L J L J L J r r r r r r r r k\\\ /UNDISTURBED SOIL CARRIER PIPE JACK AND BORE PROFILE / END OF CASING PIPE TO EXTEND AT A 1:1 SLOPE FROM EDGE OF PAVEMENT/BACK OF CURB SEAL END OF CASING WITH CONCRETE BRICK AND MORTAR (SEE NOTE 8) RESTRAIN PIPE BY RESTRAINING JOINTS OR RESTRAINING GASKETS MINIMUM CASING REQUIREMENTS RESTRAINED JOINT DIP CARRIER PIPE SIZE (INCHES) MINIMUM CASING SIZE (INCHES) MINIMUM CASING THICKNESS NCDOT(INCHES: MINIMUM CASING THICKNESS RR (INCHES) 4 8 0.188 0.188 6 12 0.188 0.250 8 16 0.250 0.281 10 16 0.250 0.281 12 20 0.281 0.344 16 24 0.344 0.375 24 36 0.406 0.532 30 42 0.500 0.625 CASING PIPE SPACER BY CASCADE MFG. OR APPROVED EQUAL SPACER DETAIL LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 JACK AND BORE CASING AND PIPE DETAIL APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WS-04 i� JACK AND BORE CASING AND PIPE DETAIL 2� X:\LCPW STANDARD DETAIL AND SPECIFICATIONS\2013 DRAFT\04 STANDARD DETAILS\LCPW SS-04 DWG \\ - III III III III III III - 111111111111111111111111 -I 1 I 1 I -I 1 I -I 1 I -I 1 /2" MINIMUM /\�\//\�//V/.VAN/A\//\\! //. 2' MINIMUM NATIVE BACKFILL ONLY IF MATERIAL IS SUITABLE - COMPACTED TO 95% STANDARD PROCTOR DENSITY / j\\/\/\ \ j\\� / VC/ 1 CLASS B (TYPICAL GRAVITY �� EFi) �I�I�I�I • • I • • I ♦4 \//\/ COMPACTED GRANULAR BEDDING LOAD FACTOR 1.9 12" MIN III III III / CAREFULLY COMPACTED SELECT BACKFILL 95°/0 STANDARD PROCTOR DENSITY (COMPACTED IN 6" LIFTS) SPRING LINE HAUNCHING # 57 WASHED STONE COMPACTED GRANULAR MATERIAL 95% STANDARD PROCTOR DENSITY 1/4 D (4" MINIMUM) IIIIIIII I�> I I� I 111-111-> 1-I / 0.5 D CLASS C (TYPICAL FORCEMAIN) SHAPED BOTTOM LOAD FACTOR 1.5 LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 STANDARD BEDDING FOR SEWER PIPE APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : SS-04 `5) STANDARD BEDDING FOR SEWER PIPE X:LLCPW STANDARD DETAIL AND SPECIFICATIONS \2013 DRAFT04 STANDARD DETAILS\LCPW WL-00.DWG NOTES: 1. STAINLESS TAPPING SADDLES ARE NOT PERMITTED FOR SIZE -ON -SIZE TAPS. UNLESS APPROVED IN WRITING BY LCPW. 2. USE MUELLER OR EQULIVENT DUCTILE IRON OR 316 STAINLESS STEEL TAPPING SLEEVES FOR TAP SIZES 3" - 24". 3. USE THRUST BLOCKING FOR WET TAPS UNLESS OTHERWISE APPROVED BY LCPW. 4. DEPTH FROM GROUND SURFACE TO TOP OF BLOCKING SHALL BE GREATER THAN HEIGHT OF BLOCKING. 5. THE END OF THE TAPPING SLEEVE SHALL BE NO CLOSER THAN 5 FEET TO A JOINT. 6. ALL PRESSURE TESTING SHALL BE WATER TESTING ONLY. NO AIR TESTING PERMITTED. TEST DURATION WILL BE 2HRS AT 1.5 TIMES STATIC PRESSURE OF THE LINE BEING TAPPED (200 PSI MINIMUM) . M.J. WITH LCPW APPROVED RESTRAINING GLAND CONCRETE SUPPORT BLOCKING UNDER VALVE TAPPING VALVE MUELLER T-2360-16 OR EQUILIVENT FLANGE JOINT M.J. TAPPING SLEEVE IiIiIiIiIiIiI MINIMUM CONCRETE STRENGTH 3000 PSI. �� // ;//% //%%i w TYPICAL T D PRANG SLEEVE TAP SIZE DIMENSIONS IN FEET W H D 3"&4" 1.6 1.2 1.0 6" 2.0 1.4 1.0 8" 3.5 2.0 1.4 10" 4.0 2.5 1.8 12" 5.0 3.0 2.5 LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 TYPICAL TAPPING SLEEVE INSTALLATION APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WL-06 eTYPICAL TAPPING SLEEVE & VALVE INSTALLATION X:ALCPW STANDARD DETAIL AND SPECIFICATIGNS2013 DRAPNSI_STANDARD DEPAILSLLCPW WSRLDWG THRUST BLOCK SPECIFICATIONS AND DIMENSIONS FITTING AREA (IN2) TEES AREA OF THRUST BLOCK (FT^2) 90° BENDS AND DEAD MAN (FT) AREA OF THRUST BLOCK (FT^2) 45° BENDS AND "Y"'S (FT) AREA OF THRUST BLOCK (FT^2) 22.5° BENDS (FT) AREA OF THRUST BLOCK (FT^2) 11.25° BENDS (FT) AREA OF THRUST BLOCK (FT^2) SIZES (IN) A (FT) B (FT) A (FT) B (FT) A (FT) B (FT) A (FT) B (FT) A (FT) B (FT) 6 28.3 2.1 1.0 2.1 2.4 1.2 3.0 1.8 0.9 1.6 1.3 1 0.6 0.8 1.3 0.6 0.8 8 50.3 2.7 1.4 3.8 3.3 1.6 5.3 2.4 1.2 2.9 1.7 0.9 1.5 1.7 0.9 1.5 10 78.5 3.4 1.7 5.9 4.1 2.0 8.3 3.0 1.5 4.5 2.1 1.1 2.3 2.1 1.1 2.3 12 113.1 4.1 2.1 8.5 4.9 2.4 12.0 3.6 1.8 6.5 2.6 1.3 3.3 2.6 1.3 3.3 14 153.9 4.8 2.4 11.5 5.7 2.9 16.3 4.2 2.1 8.8 3.0 1.5 4.5 3.0 1.5 4.5 16 201.1 5.5 2.7 15.1 7.1 3.0 21.3 4.8 2.4 11.5 3.4 1.7 5.9 3.4 1.7 5.9 18 254.5 6.4 3.0 19.1 18.0 CY 27.0 5.4 2.7 14.6 3.9 1.9 7.4 3.9 1.9 7.4 20 314.2 7.9 3.0 23.6 22.2 CY 33.3 6.0 3.0 18.0 4.3 2.1 9.2 4.3 2.1 _ 9.2 24 452.4 22 CY 33.9 32.0 CY 48.0 17.3 CY 26.0 5.1 2.6 13.2 5.1 2.6 13.2 UNDISTURBED SOIL (TYP.) 24" MIN.-12" DIA. OR GREATE PLAN -BENDS 18" MIN.-10" DIA. OR LESS SECTION X-X BENDS & TEES -A- XfJ PLAN -TEES x 24" MIN.-12" DIA. OR GREATER X 18" MIN.-10" DIA. OR LESS 4' MINIMUM UNDISTRUBED SOIL PLAN-DEADMAN MEGALUG PIPE RESTRAINT #4 REBAR 12" ON CENTER MIN. SECTION X-X DEAD MAN BLOCKING NOTES: 1. BASED ON 200 PSI STATIC PRESSURE PLUS AWWA WATER HAMMER ALLOWANCE ASSUMING 4000 PSF BEARING CAPACITY OF SOIL 2. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND. 3. THRUST BLOCKS TO BE USED AT ALL LINES OPERATING UNDER PRESSURE. 4. THESE DETAILS IN NO WAY LIMIT THE SIZE OR LOCATION OF ADDITIONAL BLOCKING WHEN REQUESTED BY THE COUNTY ENGINEER. 5. DEPTH FROM GROUND SURFACE TO TOP OF BLOCKING SHALL BE GREATER THAN HEIGHT OF BLOCKING 6. ALL FITTINGS, VALVES, ETC. SHALL BE WRAPPED WITH VISQUEEN OR POLYWRAP BEFORE CONCRETE IS PLACED, TO PREVENT CORROSION OR BONDING OF THE CONCRETE TO THE BOLTS, FITTINGS, OR PIPE. 7. WIDTH OF THE THRUST BLOCK SHOULD BE AT LEAST TWO TIMES THE HEIGHT OF THE THRUST BLOCK. 8. CUBIC YARDS OF CONCRETE IS SPECIFIED TO OPPOSE THE THRUST FORCE WHEN DIMENSION "A" EXCEEDS 8 FEET 9. ALTHOUGH THE BEARING STRENGTHS USED IN THIS TABLE HAVE BEEN USED SUCCESSFULLY IN THE DESIGN OF THRUST BLOCKS AND ARE CONSIDERED TO BE CONSERVATIVE, THEIR ACCURACY IS TOTALLY DEPENDANT ON ACCURATE SOIL IDENTIFICATION AND EVALUATION. THE ULTIMATE RESPONSIBILITY FOR SELECTING THE PROPER BEARING STRENGTH OF A PARTICULAR SOIL TYPE RESTS WITH THE DESIGN ENGINEER. LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 THRUST BLOCKING DETAIL APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : WS-01 3) THRUST BLOCKING DETAIL X \LCPW STANDARD DETAIL AND SPECIFICATIONS \2013 DRAFT04 STANDARD DETAILS\LCPW SS-05.DWG 0 m 4'-0" CONCRETE • 4" THREADED CLEAN OUT PVC PLUG FINISHEDIRADE GUARD STAKE REQUIRED / AT CLEAN OUT LOCATION. UNTIL. LANDSCAPING IS' / COMPLETED • 4" PVC • `••'N\ // SDR36 OR 34, • yj\///\/j 4" CI SOIL PIPE BARREL OF PIPE TO REST ON UNDISTURBED SOIL //\\//\\ . \\\\\/\\//\ TAPPING SADDLE OR TEE .: -• "• ��� i1I MA l 1/4" PER FT. MIN. CORE & NEOPRENE BOOT BY DEVELOPER ON NEW MH PROPERTY LINE PLUG UNTIL HOUSE SERVICE CONNECTION IS MADE COMB NATION LONG TURN PATTERN Y AND 1/8 BEND PROPERTY OWNER'S RESPONSIBILITY FROM M.H. OR MAIN TO STRUCTURE (SEE TAP SPECIFICATIONS) NOTES: 1. WHEN A SADDLE IS USED, THE HOLE SHALL BE INSTALLED BY CORING 2. THE FULL LENGTH OF THE SERVICE DITCH SHALL BE COMPACTED IN 6" LAYERS WITH MECHANICAL TAMP. LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN STREET LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 LATERAL CONNECTION TO EXISTING SEWER APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE : SS-05 (6) LATERAL CONNECTION TO EXISTING SEWER TO FDC 6" DIP FIRE SUPPLY 12"MIN. 12" OF #57 WASHED STONE I9 FDC CHECK VALVE STANDARD 4' MANHOLE RING AND COVER. NOTE: COVER SHOULD BE LABELED WATER. 111=1 * 111-111-1 I L 1 1 I I 111III111 -III„ 1111i111I1,1111 APPROVED SWING CHECK VALVE WITH HORIZONTALLY MOUNTED BALL DRIP VALVE BETWEEN FIRE HYDRANT AND FDC MEGA -LUG 6" DIP FIRE SUPPLY -IIIIIIIIIIIIIIII " I-III=III=III=III=1 � 1-1 � 1- =111E111E111E111E111-1 11- liI 11 11T1 lllll1111 1111 11 111=111 i i I „ ITII 111=I l'1 111 � ; /11111111 CMU SUPPORT OR PIPE STAND TO FIRE HYDRANT www.whnarch.com U U 0 0 SEAL 1111111* STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU BE TECHNOLOGY WASTE WATER Solutions 0 CO (13 0 (13 HUBER TECHNOLOGY 00 fl ce Lil LLI Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET UTILITY DETAILS Sheet Title C-690 • WHN ARCHITECTS hereby reserves their common law copyright ond other property rights in these plons, ideos and designs. These plans, ideos ond designs ore not to be reproduced, chonged or copied in any form or monner whotsoever, nor ore they to be ossigned to ony third party without first obtoining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify ond be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. 50' RADIUS CANOPY CO RAGE (TVP) i __• TREE RADIUS (TVP) IIL.•.��-- Ij�IIL - _ Ij�I1L ..� `�- p .,.�•.< E. ■I::r�':e_:..�1 ....11_..._ _.:i►:._..a_.- ��iw!!_._■_ ••I■.._.::_■_:: REIIIHME •• ••••MniE11_:: •••1=1i0••• p:::� �!`!�.;:;;rJ;ll!!!!■:_..'y::.e r�::irm11 rrr■il imli •" Timj��__ -i;il !rr�llla...-� ::�111 11�� .�...■III�� _ arl�jll p1 :.r;�rr;�!■; . - •Iili, s r-��.�I�- - ii %; III.. I!_. rrra-.r - n� ■r.1iIL..._... �, I II1111 ..; 11SIT/ . - ::err e!:� a.l 11._ � r r♦♦_...� � � 4�.._ - � Nat! ..- �.r ' !.IL!..._ L..: : :a 111�..� :: rll...:�.:.0:.. jl, -, _ � 1�.._r r_ ialll�7i=117•NliMilII ;..�i- 111..� �I/I,i�-=�F::CmIIr:- ■i- :__:.�Lrr..:r.r- /■d...t __ia1::._._.rr. /1:ir l••N1_ � r r.• � :.��.r-�._�....�,i1.�..._..- . 1�■ 1 r 1 � rI 1� r r r/r r■ � r r 1 ' �- I r::r�•:: :r■�:rr l !:i�:0: III-'::�:r�l::_5�Ill:'I�j:- _ p•e � i�lii► , IIL.. IIL.. '1 - - � � .. . ... � 1 1[ n III.. 11! � i,l► - Iw I/ r- - I e€ �-.o .•- ter.-�..:�.:- - �.- r1..- ./-- _ '::'�••-/�.. ''a _...- lur.._..: 1/u.. r�r -r--�,-..::-�:o ■o�...-.. /I ._�=�.::��. 1 ..I.�:.. rl 111 _...� :' iI1�A�_..._ :: - 111-...-�:::_ _ I(� r..- -s r_7:4;411 .- -,1 iZ _ - - - III...._■■■ • I��nr_■. _► r �11�..../ _.-�.-•rr•/prlr'r_•. 1■r� il�..._...�- 1�r• •I/...�...-r■.� A/..1�=.._.,.. CAI/.:.lrr1 wing-U� - `� 'n`. .■�r111:'"-■:: Irrlhli■■■_:: �1■ _S: ..n■i1I - rll. �.� !ii = z ��.;�1�1.:.`-..•!� rr:�nv:: a JIYtnsr"i I r' 11.�� _ i'.� !il�:: "'�illCll'.�:::��.CIII�... R�%r.�■ �i-r�=i� �A��..� �•./11__:..�_.. ■11 ���._-.p._ /I .�...,.� :.' II _......__ rll► ,.�. - . �■r �: � �■`.■i:` �•■■_ :._■:.■. .�. /III�....�,. � r �..� pa-..�.::�-it/,.r _._.:_._ _� � 111-..._-.. ,,..._:.,.te _.: ..: •_: --- ; eIL...:: �_:i- �... I/i_�� ....rr- •.._ �„ ... Ir_. �::_-� .�....: T'Ir'':■.��..._ 'rl��! •:'err' /I!.:: lr' 11.- -.. @�11:.=__::: ter' ••fir■■r-..■_r.--�..�- .rr-_._._= rn_-.■.■� :: - I�..�.% r1 el'..'-'-= rr1�l�,. �r A�...�. _- 11-..._:■�-- /IIC- ► �rel�� �..._..._ �---- -• r� _..._...,..,.�• �.°_ _..r I ./...._ _, ;�_ - ,• - -=imer r�-•- -•-� r rim!..,_.-:_... /1.. .� R., .■ter. __�� �■� 11 11 1 ■■C.---...� c - 11�.. s ■!. - fib �\ r r 1 / r ••./ pnr/: � �a�::��ip/��!�.!1=1iii!r11/I � �-pri:ailO�L ,,. ,�,'i, :II�s-.�.. �rr.i!ir�.u:.�.:,Wum ! r/rrrr/! p.� l�!�p =!/ i ...�1. 1� rIII�;;;-.■.,,1! !1� rr�rr� �-._■.-_�::■� p=1": :■fir : r ::� _-- , ::/:._-illy r � L .�_.._.._ Ill�e ■1 ■11 _ - �% n! - AI/ _ � .... ..--_= �'-- .::� � .. � _ .._III/ -- Irri ..�._:..., r' il!:♦ ..vrr�ir-:_ �:._:ri�� - � 1'�rl:� ::�! �0..� ■1��l:�:'.:�; :E jil�� �. � ��:.�.. J„1�/:I'.� 'rr/•'!er:� I11/�:� .,. !eC::.�:::-•--- ,.--_=..: ---':I�.nC.- _..._- O.G.---..:-•� I!.C:.. •I�' ADD.:.� ::/ �• rl!_.r:�: --r► i'V :11�:": '� • II/rI� ` • 11 �...� :.mill/III►_...ems : �Iii/rr �_ 'I•G::I�ji�/..�=_:�.:i=�!; :ir:�C::�::v... 111�:�:� ' �,�• Il J: �I�Q.: : � ° III��--`� illifi E:_� ._1 r/In!_:=::-ii:�::: ?: a:'3:f oe�Ti: S :■�;I;:._ ,="% %IIIl rn�!::a••:==-•s,l!� 1�-!:_ =::•-1�!Il�r:: :r-- IYI�111_::... ..r_ III/:::�: -' �liilC=�1 :::�� - .�Ji!•' r::�irL : , "L - � .::::'/ I'A"LM,- 7uli�i L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-L1.00 Landscape Plan.dwg Sep 20, 2022 - 2:07pm (17,510 sf) SPHE I,1E11 11 I�ji' Al lIim A I figk wlll'�Ij�q �1111�IIL �711LI�111 I ui,duzwift j1ii1111 P 1' III•Ijj�i!L�1, ;1i ;_:::_:: xim 1/L�j11111 lr!, .� 111A111�1i :ITV" 1IIYI�f �I ,11YY�III1( li/IL/Illl 'jl w 4/ iI!' �Ij�IIL.... ,■II��IIIII. 4 / ;1�11111 1' kW '1M111111 Il_ Illlzi�;: II II II II II II II II II II ti ti A I (4) ACRO LINETYPE LEGEND: SYMBOL DESCRIPTION LIMITS OF DISTURBANCE PROPERTY LINE EASEMENT SETBACK RIPARIAN BUFFER BZ (50') TP • TREE PROTECTION FENCE • ACCESSIBLE ROUTE NOTES: 1. SEE SHEET C0.10 FOR GENERAL AND PLANTING NOTES. PLANTING NOTES: 1. VERIFY ALL QUANTITIES AND REPORT ANY DISCREPANCIES OR INACCURACIES IN THE PLANS TO THE OWNER'S REPRESENTATIVE PRIOR TO PLANTING. 2. LANDSCAPE WORK SHALL INCLUDE THE FURNISHING, INSTALLATION, AND WARRANTY OF ALL PLANTING MATERIALS WITHIN THE PROJECT AREA. 3. THE LANDSCAPE CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL EXISTING AND NEW UNDERGROUND UTILITIES PRIOR TO EXCAVATION FOR PLANTING. DAMAGES TO UTILITIES CAUSED BY THE LANDSCAPE OPERATION SHALL BE CORRECTED BY THE LANDSCAPE CONTRACTOR AT NO COST TO THE OWNER. 4. LANDSCAPING SHALL REMAIN CLEAR FROM ANY FIRE HYDRANTS ON THE SITE. 5. ALL TREES TO BE A MINIMUM OF 2" IN CALIPER AND MUST MEET THE AMERICAN STANDARD FOR NURSERY STOCK. 6. TREE PROTECTION NOTE: TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 7. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 8. ROOT ZONE PROTECTION AREA: VARIES BASED ON LOCAL JURISDICTION HAVING AUTHORITY. CONTRACTOR SHALL COMPLY WITH LOCAL JURISDICTIONAL REQUIREMENTS. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. 9. SEED BED PREPARATION: ALL AREAS TO BE SEEDED ARE TO BE RECEIVE A MINIMUM OF 2" OF APPROVED TOPSOIL. ALL DEBRIS, ROCKS, ETC. LARGER THAN .5" ARE TO BE REMOVED. ALL LARGE CONCENTRATIONS OF GRAVEL & DEBRIS REGARDLESS OF SIZE ARE TO BE REMOVED PRIOR TO SEEDING OR PLANTING. 10. ALL PLANT BED AREAS ARE TO RECEIVE A MINIMUM OF 6" OF APPROVED TOPSOIL. 11. SOIL SHOULD BE TESTED AND AMENDED WITH LIME AND FERTILIZER FOR HARDWOOD TREES ACCORDING TO NCDA PROCEDURES. SCARIFY PLANT PIT WALLS. CONSULT LANDSCAPE ARCHITECT FOR ALTERNATE COMPLIANCE. 12. SHREDDED HARDWOOD MULCH 3" DEEP EXCEPT AT CROWN OF PLANT UNLESS OTHERWISE NOTED. FLARE AT CROWN SHOULD BE REVEALED. BACKFILL CONSISTS OF THOROUGHLY BROKEN UP NATIVE SOIL. TOTAL VOLUME OF BACKFILL SHOULD BE AMENDED WITH UP TO ONE THIRD PINE BARK MULCH. PIECES SHOULD BE NO LARGER THAN WHAT PASSES THROUGH A ONE INCH SCREEN. IF ADDITIONAL SOIL IS REQUIRED FOR BACKFILL DUE TO DETRIMENTAL SUBSOIL DRAINAGE CONDITIONS, USE SOIL SIMILAR TO EXISTING NATIVE SOIL. ADDITIONAL SOIL TO BE APPROVED BY LANDSCAPE ARCHITECT. MAXIMUM SAUCER HEIGHT IS 6 INCHES. 13. TOP OF ROOTBALL TO BE RAISED 2-3 INCHES ABOVE EXISTING GRADE. 14. FOR B&B PLANTS, NATURAL FIBER BURLAP SHOULD BE TURNED DOWN BY 1/3 TOTAL HEIGHT OF ROOT BALL. PLASTIC FIBER BURLAP AND WIRE BASKETS SHOULD BE REMOVED TO 2/3'S OF TOTAL HEIGHT OF ROOT BALL. 15. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE TREE UPRIGHT AND PLUMB THROUGHOUT THE WARRANTY PERIOD. IF STABILIZATION IS NECESSARY SEE STAKING IN TREE DETAIL, ORANGE FLAGGING TAPE SHOULD BE ATTACHED TO SUPPORT WIRE. STAKING SHOULD BE REMOVED BY CONTRACTOR AT END OF ONE YEAR WARRANTY PERIOD OR AS DIRECTED BY GROUNDS MANAGEMENT. 16. USE STANDARD "GATOR" BAGS FOR WATERING TREES IN AREAS NOT UNDER IRRIGATION. INCORPORATE TERRA -SORB (OR EQUAL) AS PER MANUFACTURERS RECOMMENDATIONS, FOR AREAS NOT UNDER IRRIGATION. 17. USE "BIO-BARRIER" OR EQUIVALENT ACCORDING TO MANUFACTURER'S RECOMMENDATION FOR TREES THAT WILL BE PLANTED WITHIN 10' OF PAVEMENT 18. LANDSCAPING/C.O. STANDARDS NOTE: ALL LANDSCAPING MUST BE IN PLACE PRIOR TO REQUEST FOR A CERTIFICATE OF COMPLIANCE. PLANT SCHEDULE TREES CODE QTY BOTANICAL / COMMON NAME CONTAINER CALIPER HEIGHT SPACING NOTES 00 VPOCTOBER ACRO 12 ACER RUBRUM 'OCTOBER GLORY' GLORY RED MAPLE B&B 1.5 IN 8 TO 10 FT AS SHOWN GROUND COVERS CODE QTY BOTANICAL / COMMON NAME CONTAINER --- HEIGHT SPACING NOTES N( IV IV '/( N( IV IV Y/ IN N( III ISI Ill IV Ill IV 10 Ill IV 10 Ill Ill IV 10 Ill Ill II( U(„,IS( „,IV„,WII,WI„,IS( „,IV„, I, CYDS CYDS 4,331 SF CYNODON DACTYLON 'SAHARA' SAHARA BERMUDA GRASS SEED GRASSES CODE QTY BOTANICAL / COMMON NAME CONTAINER --- HEIGHT SPACING NOTES W .1, J, J, W CYDA 16,795 SF CYNODON DACTYLON BERMUDA GRASS SOD S ■ 0 16 33 SCALE: 1" = 33' ■ 65 NORTH N ; 0 aN ) N - - Z 0 • O 0 0 U a.) C O x CL N LO (O rnrn 0) 0) �rr) re)N) 00 www.whnarch.com _C U 0 U) U C U F- I II)i _ e ' - .:.:. -,-q-, r ee'. \f:! l 1 °0.pee ''`{r kD -8-A.R. ARp \{x� I �b8. 25.2022 1111 STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU BE R TECHNOLOGY WASTE WATER Solutions HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET . 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 3. ---- 4. ---- 6. ---- LANDSCAPE PLAN Sheet Title L-100 • WHN ARCHITECTS hereby reserves their common law copyright and other property rights in these plans, ideas and designs. These plans, ideas and designs ore not to be reproduced, changed or copied in any form or manner whatsoever, nor ore they to be assigned to any third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall hove precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings. L:\Projects\2022\C22007 - Huber Tech Ph.2BIdg Expansion and Passivation Plant\DWGS\1 - CD's\3-Sheets\C22007-L1.90 Landscape Details.dwg Sep 20, 2022 - 2:07prr CENTRAL LEADER. (SEE CROWN OBSERVATIONS DETAIL). TRUNK CALIPER SHALL MEET ANSI Z60 CURRENT EDITION FOR ROOT BALL SIZE. ROOT BALL MODIFIED AS REQUIRED (SEE SPECIFICATIONS). ROUND -TOPPED SOIL BERM 4" HIGH X 8" WIDE ABOVE ROOT BALL SURFACE SHALL BE CONSTRUCTED AROUND THE ROOT BALL. BERM SHALL BEGIN AT ROOT BALL PERIPHERY. FINISHED GRADE. MODIFIED SOIL. DEPTH VARIES. (SEE PLANT SOIL PLAN). SCARIFIED SOIL. - TREE (TYPICAL) SECTION 3" LAYER OF SETTLED MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). ORIGINAL SLOPE SHOULD PASS THROUGH THE POINT WHERE THE TRUNK MEETS SUBSTRATE/SOIL. MODIFIED SOIL. DEPTH VARIES. (SEE PLANTING SOIL PLAN). BOTTOM OF ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL. III III III 'III III III III III III EQUAL ,!' EQUAL ,!' EQUAL 4\ SHRUB ON SLOPE (TYPICAL) SECTION TOP OF ROOT BALL SHALL BE FLUSH WITH FINISHED GRADE. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. 3" LAYER OF SETTLED MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). BOTTOM OF ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL. 4" 0 SOCK DRAIN CONTINUOUS AROUND BASE OF TREE. INSTALL 4" - 6" DEEPER THAN ROOT BALL FOR LOWERED PLANTING HOLE AS NEEDED WITH POOR DRAINAGE (SEE PLANTING PIT/BED DRAIN DETAIL). NTS PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. SCARIFIED SOIL. NTS TRUNK CALIPER SHALL MEET ANSI Z60 CURRENT EDITION FOR ROOT BALL SIZE. ROOT BALL MODIFIED AS REQUIRED (SEE SPECIFICATIONS). ROUND -TOPPED SOIL BERM 4" HIGH X 8" WIDE ABOVE ROOT BALL SURFACE ON THE DOWNHILL SIDE OF THE ROOT BALL. BERM SHALL DIE INTO SLOPE. MODIFIED SOIL. DEPTH VARIES. (SEE SOIL PREPARATION PLAN). EQUAL \ TREE ON SLOPE (TYPICAL) 2 SECTION ACCEPTABLE III III EQUAL ONE CENTRAL LEADER (NO CODOMINANT LEADERS) ASPECT RATIO IS LESS THAN 0.66. III III III EQUAL -4' CENTRAL LEADER. (SEE CROWN OBSERVATIONS DETAIL). FINISHED SLOPE SHOULD PASS THROUGH THE POINT WHERE THE TRUNK BASE MEETS SUBSTRATE/SOIL. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. 3" LAYER OF SETTLED MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). FINISHED GRADE (MAX SLOPE SHALL BE 3:1). BOTTOM OF ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL (SEE NOTE 8). 4" 0 SOCK DRAIN CONTINUOUS AROUND BASE OF TREE. INSTALL 4" - 6" DEEPER THAN ROOT BALL FOR LOWERED PLANTING HOLE AS NEEDED WITH POOR DRAINAGE (SEE PLANTING PIT/BED DRAIN DETAIL). r EXAMPLE A B Aspect Ratio 1.50" 0.50" 0.33 2.50" 0.90" 0.36 2.0" 1.00" 0.50 2.50" 1.60" 0.64 ASPECT RATIO OF B:A LESS THAN 0.66 AS MEASURED 1" ABOVE THE TOP OF THE BRANCH UNION. REJECTABLE MULTIPLE LEADERS (SEVERAL CODOMINANT LEADERS) ASPECT RATIO IS GREATER THAN 0.66. \ CROWN OBSERVATIONS - HIGH BRANCHED 2 SECTION EXAMPLE A B Aspect Ratio 2.50" 1.80" 0.72 2.0" 2.0" 1.0 2.50" 2.0" 0.80 4.0" 3.0" 0.75 ASPECT RATIO OF B:A GREATER THAN OR EQUAL TO 0.66 AS MEASURED 1" ABOVE THE TOP OF THE BRANCH UNION. NTS NTS 3" LAYER OF SETTLED MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). FINISHED GRADE. MODIFIED SOIL. DEPTH VARIES. (SEE PLANTING SOIL PLAN). III III III III III III III III III1.1 III III - ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL. SHRUB (TYPICAL) SECTION PLANTING NOTES: 1. DO NOT STAKE TREES EXCEPT WHERE SPECIFIED BY LANDSCAPE ARCHITECT. STAKING IS REQUIRED FOR TREES PLANTED ON SLOPES. 2. WHERE SEVERAL TREES WILL BE PLANTED CLOSE TOGETHER SUCH THAT THEY WILL LIKELY SHARE ROOT SPACE, TILL IN SOIL AMENDMENTS TO A DEPTH OF 4-6" OVER THE ENTIRE AREA. 3. FOR CONTAINER GROWN TREES, USE FINGERS OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER. 4. FOR FIELD GROWN TREES, CUT BURLAP, ROPE AND WIRE BASKET AWAY FROM TOP AND SIDES OF ROOT BALL. 5. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 6. THE PLANTING PROCESS IS SIMILAR FOR DECIDUOUS AND EVERGREEN TREES. 7. DO NOT WRAP TRUNK; MARK NORTH SIDE OF TREE IN THE NURSERY AND LOCATE TO THE NORTH IN THE FIELD. 3PLANTING NOTES , 4" HIGH X 8" WIDE ROUND - TOPPED SOIL BERM ABOVE ROOT BALL SURFACE SHALL BE CONSTRUCTED AROUND THE ROOT BALL. BERM SHALL BEGIN AT ROOT BALL PERIPHERY. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. SCARIFIED SOIL. 8. WIDTH OF PLANTING HOLE IS 3X ROOT BALL AT THE SURFACE, SLOPING TO 2X THE ROOT BALL DIAMETER AT THE DEPTH OF THE ROOT BALL. 9. BEFORE PLANTING, ADD 3-4" OF WELL COMPOSTED LEAVES, RECYCLED YARD WASTE OR OTHER COMPOST AND TILL INTO TOP 6" OF PREPARED SOIL. ADD COMPOST AT 20-35% BY VOLUME TO BACKFILL. 10. PERFORM PERCOLATION TEST FOR EACH TREE PIT TO CONFIRM THAT WATER DRAINS OUT OF THE SOIL. PROVIDE GRAVEL SUMP FILTER FABRIC & VENT PIPE IF DRAINAGE DOES NOT OCCUR WITHIN 24 HOURS. INCLUDE ALL SUMPS IN BASE BID. SHOULD SUMPS NOT BE NECESSARY AFTER PERCOLATION TEST, PROVIDE CHANGE ORDER DEDUCT TO OWNER. 11. IF PLANTING HOLES ARE DUG WITH A LARGE AUGER BREAKING DOWN THE SIDES WITH A SHOVEL CAN ELIMINATE GLAZING AND CREATE THE PREFERRED SLOPING SIDE. 12. TREES SHALL HAVE SINGLE LEADERS. TREES WITH 2 LEADERS WILL BE REJECTED. 13. DO NOT PLACE MULCH IN CONTACT WITH TRUNK. 14. PROVIDE GATOR BAGS FOR ALL TREES WHERE IRRIGATION IS NOT PROVIDED. NTS N CO a) a) Cn a) NO NO r7Nri tr) NO 00 www.whnarch.com C (r) F- U 0 U) E U U 11N-1 ::' ff111t1113tix STEWART 101 N. TRYON ST, SUITE 1400 CHARLOTTE, NC 28202 T 919.380.8750 FIRM LICENSE #: C-1051 www.stewartinc.com PROJECT #: C22007 HU B E R TECHNOLOGY WASTE WATER Solutions o co co ri W0 c ca ■� > VJ (i) al Cl 0_ CC6 HUBER TECHNOLOGY Project No. 19217 Date Issued: AUGUST 19th, 2022 Revisions: PERMIT SET 1. 1 09.20.2022 LCNR - REVIEW COMMENTS 2. ---- 4. 5. ---- LANDSCAPE DETAILS Sheet Title L-190 WHN ARCHITECTS hereby reserves their common low copyright and other property rights in these plons, ideas and designs. These plons, ideas and designs ore not to be reproduced, changed or copied in ony form or monner whotsoever, nor ore they to be assigned to ony third party without first obtaining the express written permission from WHN ARCHITECTS. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractors shall verify and be responsible for oll dimensions and conditions on the job and WHN ARCHITECTS must be notified in writing of any variations from the dimensions, conditions and specifications on these drawings.