Loading...
HomeMy WebLinkAbout20141116 Ver 1_401 Application_20141014JACOB D GRIEB, PE 218 W Holston Ave Johnson City, TN 37604 502.314.9162 iacob.arieb@email.com TO NC DWO. W8SCP Unit 1650 Mail Service Center Raleigh , NC 27699 WE ARE SENDING YOU Q Shop drawings ❑ Copy of letter LETTER OF TRANSMITTAL DATE 1 10/20/14 JOB NO 14001 ATTENTION. 10/20/14 SUBJECT: PCN Tracy Grove Road Commercial 10/20/14 11 x 17 Exhibit 1 10/20/14 Q Attached ❑ Under separate cover via ❑ Prints ❑ Plans ❑ Samples ❑ Change Order ❑ Agreement & Resolution the following items ❑ Specifications COPIES DATE NO DESCRIPTION 1 10/20/14 ❑ PCN 1 10/20/14 11 x 17 Exhibit 1 10/20/14 Agent Authorization Form 1 10/20/14 Check Application Fee THESE ARE TRANSMITTED as checked below ❑ For approval ❑ For your use Q As requested ❑ For review and comment ❑ For BIDS DUE ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections 20 ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Please see attached for review If you have any questions please let me know COPYTO file SIGNED Jacdb Grieb, PE Cs c 2 0 1 4 1 1 1 6 Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 Pre - Construction Notification (PCN) Form AIE A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number 39 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d Type(s) of approval sought from the DWQ (check all that apply) ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes X❑ No For the record only for Corps Permit ❑ Yes ❑X No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1g Is the protect located in any of NC's twenty coastal counties If yes, answer 1h below ❑ Yes NX No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ❑X No 2. Project Information 2a Name of project Tracy Grove Road Commercial Development 2b County Henderson 2c Nearest municipality / town Hendersonville 2d Subdivision name Dana Road 2e NCDOT only, T I P or state project no 3. Owner Information 1, 3a 3a Name(s) on Recorded Deed Hooper's Creek Property Management, LLC 2 2 M4 , 4 3b Deed Book and Page No DB15882 PG470 3c Responsible Party (for LLC if applicable) Dennis Dorn 401 $ BUFFER P `SL7iJFiCES ERMrTT�NG 3d Street address 730 Sugarloaf Rd 3e City, state, zip Hendersonville, NC 28792 3f Telephone no 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 1 4 January 2009 4. Applicant Information (if different from owner) 4a Applicant is ❑X Agent ❑ Other, specify 4b Name Jacob D Gneb, PE 4c Business name (if applicable) 4d Street address 218 W Holston Ave 4e City, state, zip Johnson City, TN 37604 4f Telephone no 502 - 314 -9162 4g Fax no 4h Email address Jacob grieb @gmail com 5. Agent/Consultant Information (if applicable) 5a Name Jacob D Gneb, PE 5b Business name (if applicable) 5c Street address 218 W Holston Ave 5d City, state, zip Johnson City, TN 37604 5e Telephone no 502 - 314 -9162 5f Fax no 5g Email address Jacob grieb @gmail com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) 9579128256 1b Site coordinates (in decimal degrees) Latitude Longitude 1c Property size 298 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Devils Fork 2b Water Quality Classification of nearest receiving water C 2c River basin French Broad 3. Project Description 3a Existing Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application conditions are open space with overgrown vegetation throughout the site General land use with in the area is highway business 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 1260 3d Explain the purpose of the proposed project Provide development for commercial use space 3e Describe the overall project in detail, including the type of equipment to be used Overall project will consist of an approximately 11000 sq ft building to house golf and rental equipment including parking, drives, & stormwater BMPs 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No X❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? --T[3 Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts: 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites Impacted 3a Stream Impact number Permanent (P) or Temporary (T) 3b Type of Impact 3c Stream name 3d Perennial (PER) or intermittent (I NT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 P Culvert Unnamed Tributary PER DWQ 15 150 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 150 31 Comments Proposed culvert to provide a efficient and user friendly development Page 4 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivii ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total: 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet 6g Zone 2 impact (square feet 131 Yes /No B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts 61 Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts In designing project Developed altrenative site plans to minimize stream impacts Use of LID and BMP to design stormwater quality devices 1 b Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques Use of ConSPAN to limit strem impacts for entrance to site 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes, mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to In -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from In -lieu fee program Is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes No buffer mitigation? 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required- 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X❑ No within one of the NC Riparian Buffer Protection Rules? 1b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project'? 25% 2b Does this project require a Stormwater Management Plan? 0 Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan Construction of potentiial permeable pavement, rain barrels, filter strip, and wet detention Other BMP's may be used as well 2e Who will be responsible for the review of the Stormwater Management Plan? City of Hendersonville 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? City of Hendersonville 0 Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ❑Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑X No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes X❑ No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? El Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future Impacts) result in ❑ Yes ❑X No additional development, which could Impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative Impact analysis In accordance with the most recent DWQ policy If you answered "no " provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject faculty Site will be served by City of Hendersonville sewer department Page 9 of 10 PCN Form — Version 1 4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑X Yes ❑ No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? Fx� Yes ❑X No 5c If yes, indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Website, existing data from previous project within area 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑X No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑X Yes ❑ No 8b If yes, explain how project meets FEMA requirements Stream does not have a determined floodway Culvert will be desinged to not increse the floodplain more than a foot per FEMA regulations 8c What source(s) did you use to make the floodplain determination? FEMA and City of Hendersonville Applicant/Agent's Printed Name (O 1101 12-01y- Date p licant/Agent's Signature (Agent' ignature is valid only if an authorization letter from the applicant is provided Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION PIN# 9579128256 STREET ADDRESS 9999 Tracy Grove Road Hendersonville, NC 28792 Please print Property Owner Hooper's Creek Property Management, LLC The undersigned, registered property owners of the above noted property, do hereby authorize Jacob D Gneb, PE to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached Property Owner's Address (if different than property above) 730 Sugarloaf Rd Hendersonville, NC 28792 Telephone We hereby certify the above information submitted in this application is true and accurate to the best of our kno ledge Auth ized Sig ture Date 10' VIUM i Y IVIAV —NOT TO SCALE —- — PROPOSED DRIVE PROPOSED BUILDING FLOODPLAIN ELEV. 2084 I- 1 PROJECT AREA PLAN VIEW Ciraiar c„wwn� t Riae ';t-aamhan Malri ie�� r Inch cs r t Irnreri CULVERT PLACEMENT PROPOSED 60" HDPE PER DETAIL 1 \`111111111111] CAR o� °ope °ssio °° i = 0 L - 97 e .G ''ll 1111 Lu a m j