HomeMy WebLinkAbout20210364 Ver 1_RES Buffer Mitigation Transfer Certificate - Partial_20220803Strickland, Bev
From: Amy Staley <astaley@res.us>
Sent: Wednesday, August 3, 2022 1:07 PM
To: Cohn, Colleen M
Cc: John Farmer; DePalma, Alicia Knowles; Morris, Tom E.; Keith Gualtieri; Daniel Ramsay;
Caroline Irvin; Breanne Loveland
Subject: [External] Mitigation Transfer Certificates - PNG Line 142 Pipeline
Attachments: Thunder Swamp Phase II Mitigation Transfer Certificate - DWR - PNG Line 142
Pipeline.pdf; Thunder Swamp - UMB - Buffer Preservation Credit Ledger 080322.pdf;
Thunder Swamp - UMB - Buffer Credit Ledger 080322.pdf; Bucher Mitigation Transfer
Certificate - DWR - PNG Line 142 Pipeline.pdf; Bucher - BBMB - Buffer Credit Ledger
080322.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Colleen,
Attached are the Mitigation Transfer Certificates for the PNG Line 142 Pipeline project; along with the
corresponding credit ledgers. Please let me know if you need anything else.
Thank you!
Amy Staley
Credit Sales Manager
RES I res.us
Direct: 919.209.1055
Restoring a resilient earth for a modern world
1
fires
August 3, 2022
Duke Energy
4720 Piedmont Row Drive
Charlotte, NC 28210
Attn: Tom Morris
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2
Riparian Buffer Credits Purchased: 74,897.631 (ft)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: PNG Line 142 Pipeline, DWR Project # 20210364
You have elected to fulfill your permitted nutrient mitigation requirements for the PNG Line 142 Pipeline project by paying
into the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred
in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20210364
and is 575,700.00 ft2. The Thunder Swamp Phase II site is providing 69,913.368 ft2, Thunder Swamp preservation is providing
4,984.263 ft2, and Bucher is providing 25,489.369 ft2, the remaining credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this activity
including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable.
If you have any questions or need additional information, please contact me at 919-209-1055 or astaley@res.us.
Thank you,
V /
l_
Amy Staley
Credit Sales Manager
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Colleen Cohn
Energy Land & Infrastructure, PLLC — John Farmer
res.us
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Thunder Swamp Phase Il, HUC 03020201 Buffer Preservation Credit Ledger
8/3/2022
DWR Bank Parcel Project Number: 2021-0306v2
Total Credits Released to Date:10,061.210 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
5/19/22
Task 1: Credits Released (15%)
4,311.947
0.099
0.000
4,311.947
0.099
DWR
2
6/17/22
1258 North Main Development LLC
Richland Creek Outfall Replacement and Short
I Extension (20220223)
03020201
4,311.947
0.099
0.000
0.000
DWR
3
6/30/22
Task 2: Credits Released (20%)
5,749.263
0.132
5,749.263
0.132
DWR
41
7/26/22
Jeramie Kyle Hockman
1306 Wicklow Drive (20220677)
03020201
765.000
0.0181
4,984.263
0.114
DWR
51
8/3/22
1 Duke Energy
PNG Line 142 Pipeline (20210364)
03020201
4,984.263
0.1141
0.000
0.000
DWR
10,061.2101
110,061.210
0.000
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Thunder Swamp Phase II, HUC 03020201 Buffer Credit Ledger
8i3i2022
DWR Bank Parcel Project Number: 2021-0306v2
Total Credits Released to Date: 122,349.436 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
5/19/22
Task 1: Credits Released (15%)
52,435.473
1.204
0.000
52,435.473
1.204
DWR
2
6/3/22
DR Horton - Terramor LLC
Winston Pointe (20041488 v9)
03020201
10,856.000
0.249
41,579.473
0.955
DWR
3
6/7/22
Highfill Infastructure Engineering, P.C.
Big Branch Sewer (20200597 v2)
03020201
45.720
0.001
41,533.753
0.953
DWR
4
6/17/22
1258 North Main Development LLC
Richland Creek Outfall Replacement and Short
Extension (20220223)
03020201
1
13,484.753
0.310
28,049.000
0.644
DWR
5
6/30/22
Task 2: Credits Released (20%)
69,913.963
1.605
97,962.963
2.249
DWR
6
7/19/22
Lennar Carolinas, LLC
Cayden Cove (20210782)
03020201
23,025.000
0.529
74,937.963
1.720
DWR
7
8/3/22
Duke Energy
PNG Line 142 Pipeline (20210364)
03020201
69,913.368
1.605
5,024.595
0.115
DWR
122,349.436
117,324.841
5,024.595
ores
Mitigation Credit Transfer Certificate
Prepared by
EBX-NE USE I, LLC
August 3, 2022
Duke Energy
4720 Piedmont Row Drive
Charlotte, NC 28210
Attn: Tom Morris
Bucher Bank Parcel ID: DWR Project # 2016-0977v2
Riparian Buffer Credits Purchased: 25,489.369 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: PNG Line 142 Pipeline, DWR Project # 20210364
You have elected to fulfill your permitted buffer mitigation requirements for the PNG Line 142 Pipeline
project by paying into the Bucher Mitigation Bank (Bucher Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer
impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and
verified by DWR in project #20210364 and is 575,700.00 ft2. The Bucher site is providing 25,489.369 ft2,
the Thunder Swamp Phase II site is providing 69,913.368 ft2, Thunder Swamp preservation is providing
4,984.263 ft2, the remaining credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization
associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks.
This payment into the Bank is not transferable. If you have any questions or need additional information,
please contact me at 919-209-1075 or cparker@res.us.
Sincerely,
-A yl -
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Colleen Cohn
Energy Land & Infrastructure, PLLC — John Farmer
Resource Environmental Solutions, LLC . 3600 Glenwood Avenue, Suite 100 . Raleigh, NC 27612
EBX-NEUSE I, LLC - BUCHER RIPARIAN BUFFER MITIGATION BANK
Bucher Site, HUC 03020201 Buffer Restoration & Preservation Credit Ledger
813/2022
DWR Bank Parcel Project Number: 2016-0977v2
As -Built Credit Total: 254,893.637 square feet
Total Credits Released to Date: 57,351.069 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
6/18/2020
Tasks 1 Credits Released (12.5%)
31,861.705
0.73
-
31,861.705
0.73
2
10/4/2021
Mun o Homes
Georgia's Landing Subdivision and Offsite
I Sewer Force Main - 20201613 v2
03020201
1
1 31,861.700
0.73
0.005
0.00
DW R
3
7/8/2022
Tasks 2 Credits Released (10%)
25,489.364
0.59
25,489.369
0.59
4
8/3/2022
Duke Energy PNG Line 142 Pipeline 20210364
03020201
25,489.369
0.59
0.00
DW R
57,351.069
57,351.069
-