Loading...
HomeMy WebLinkAbout20210364 Ver 1_RES Buffer Mitigation Transfer Certificate - Partial_20220803Strickland, Bev From: Amy Staley <astaley@res.us> Sent: Wednesday, August 3, 2022 1:07 PM To: Cohn, Colleen M Cc: John Farmer; DePalma, Alicia Knowles; Morris, Tom E.; Keith Gualtieri; Daniel Ramsay; Caroline Irvin; Breanne Loveland Subject: [External] Mitigation Transfer Certificates - PNG Line 142 Pipeline Attachments: Thunder Swamp Phase II Mitigation Transfer Certificate - DWR - PNG Line 142 Pipeline.pdf; Thunder Swamp - UMB - Buffer Preservation Credit Ledger 080322.pdf; Thunder Swamp - UMB - Buffer Credit Ledger 080322.pdf; Bucher Mitigation Transfer Certificate - DWR - PNG Line 142 Pipeline.pdf; Bucher - BBMB - Buffer Credit Ledger 080322.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Colleen, Attached are the Mitigation Transfer Certificates for the PNG Line 142 Pipeline project; along with the corresponding credit ledgers. Please let me know if you need anything else. Thank you! Amy Staley Credit Sales Manager RES I res.us Direct: 919.209.1055 Restoring a resilient earth for a modern world 1 fires August 3, 2022 Duke Energy 4720 Piedmont Row Drive Charlotte, NC 28210 Attn: Tom Morris 3600 Glenwood Avenue, Suite ioo Raleigh, NC 27612 Mitigation Credit Transfer Certificate Prepared by Environmental Banc & Exchange, LLC Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2 Riparian Buffer Credits Purchased: 74,897.631 (ft) 8 digit-HUC — 03020201 Neuse River Basin Project Name: PNG Line 142 Pipeline, DWR Project # 20210364 You have elected to fulfill your permitted nutrient mitigation requirements for the PNG Line 142 Pipeline project by paying into the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site). This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20210364 and is 575,700.00 ft2. The Thunder Swamp Phase II site is providing 69,913.368 ft2, Thunder Swamp preservation is providing 4,984.263 ft2, and Bucher is providing 25,489.369 ft2, the remaining credits will be purchased elsewhere. You must also comply with any other state, federal or local government permits, or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or astaley@res.us. Thank you, V / l_ Amy Staley Credit Sales Manager cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator DWR — Colleen Cohn Energy Land & Infrastructure, PLLC — John Farmer res.us ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK Thunder Swamp Phase Il, HUC 03020201 Buffer Preservation Credit Ledger 8/3/2022 DWR Bank Parcel Project Number: 2021-0306v2 Total Credits Released to Date:10,061.210 square feet Credits Released/Available to Bank Credits Debited/Sold from Bank Buffer Credit Balance Transaction Number Sale/ Release Date Purchaser or % Credit Release Project Name HUC of Project Square Feet Acres Square Feet Acres Square Feet Acres Local Gov't Requiring 1 5/19/22 Task 1: Credits Released (15%) 4,311.947 0.099 0.000 4,311.947 0.099 DWR 2 6/17/22 1258 North Main Development LLC Richland Creek Outfall Replacement and Short I Extension (20220223) 03020201 4,311.947 0.099 0.000 0.000 DWR 3 6/30/22 Task 2: Credits Released (20%) 5,749.263 0.132 5,749.263 0.132 DWR 41 7/26/22 Jeramie Kyle Hockman 1306 Wicklow Drive (20220677) 03020201 765.000 0.0181 4,984.263 0.114 DWR 51 8/3/22 1 Duke Energy PNG Line 142 Pipeline (20210364) 03020201 4,984.263 0.1141 0.000 0.000 DWR 10,061.2101 110,061.210 0.000 ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK Thunder Swamp Phase II, HUC 03020201 Buffer Credit Ledger 8i3i2022 DWR Bank Parcel Project Number: 2021-0306v2 Total Credits Released to Date: 122,349.436 square feet Credits Released/Available to Bank Credits Debited/Sold from Bank Buffer Credit Balance Transaction Number Sale/ Release Date Purchaser or % Credit Release Project Name HUC of Project Square Feet Acres Square Feet Acres Square Feet Acres Local Gov't Requiring 1 5/19/22 Task 1: Credits Released (15%) 52,435.473 1.204 0.000 52,435.473 1.204 DWR 2 6/3/22 DR Horton - Terramor LLC Winston Pointe (20041488 v9) 03020201 10,856.000 0.249 41,579.473 0.955 DWR 3 6/7/22 Highfill Infastructure Engineering, P.C. Big Branch Sewer (20200597 v2) 03020201 45.720 0.001 41,533.753 0.953 DWR 4 6/17/22 1258 North Main Development LLC Richland Creek Outfall Replacement and Short Extension (20220223) 03020201 1 13,484.753 0.310 28,049.000 0.644 DWR 5 6/30/22 Task 2: Credits Released (20%) 69,913.963 1.605 97,962.963 2.249 DWR 6 7/19/22 Lennar Carolinas, LLC Cayden Cove (20210782) 03020201 23,025.000 0.529 74,937.963 1.720 DWR 7 8/3/22 Duke Energy PNG Line 142 Pipeline (20210364) 03020201 69,913.368 1.605 5,024.595 0.115 DWR 122,349.436 117,324.841 5,024.595 ores Mitigation Credit Transfer Certificate Prepared by EBX-NE USE I, LLC August 3, 2022 Duke Energy 4720 Piedmont Row Drive Charlotte, NC 28210 Attn: Tom Morris Bucher Bank Parcel ID: DWR Project # 2016-0977v2 Riparian Buffer Credits Purchased: 25,489.369 (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: PNG Line 142 Pipeline, DWR Project # 20210364 You have elected to fulfill your permitted buffer mitigation requirements for the PNG Line 142 Pipeline project by paying into the Bucher Mitigation Bank (Bucher Site). This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20210364 and is 575,700.00 ft2. The Bucher site is providing 25,489.369 ft2, the Thunder Swamp Phase II site is providing 69,913.368 ft2, Thunder Swamp preservation is providing 4,984.263 ft2, the remaining credits will be purchased elsewhere. You must also comply with any other state, federal or local government permits, or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact me at 919-209-1075 or cparker@res.us. Sincerely, -A yl - Amy Staley Credit Sales Manager Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator DWR — Colleen Cohn Energy Land & Infrastructure, PLLC — John Farmer Resource Environmental Solutions, LLC . 3600 Glenwood Avenue, Suite 100 . Raleigh, NC 27612 EBX-NEUSE I, LLC - BUCHER RIPARIAN BUFFER MITIGATION BANK Bucher Site, HUC 03020201 Buffer Restoration & Preservation Credit Ledger 813/2022 DWR Bank Parcel Project Number: 2016-0977v2 As -Built Credit Total: 254,893.637 square feet Total Credits Released to Date: 57,351.069 square feet Credits Released/Available to Bank Credits Debited/Sold from Bank Buffer Credit Balance Transaction Number Date Purchaser Name or UMBI Task Completed Project Name HUC of Project Square Feet Acres Square Feet Acres Square Feet Acres Local Gov't Requiring 1 6/18/2020 Tasks 1 Credits Released (12.5%) 31,861.705 0.73 - 31,861.705 0.73 2 10/4/2021 Mun o Homes Georgia's Landing Subdivision and Offsite I Sewer Force Main - 20201613 v2 03020201 1 1 31,861.700 0.73 0.005 0.00 DW R 3 7/8/2022 Tasks 2 Credits Released (10%) 25,489.364 0.59 25,489.369 0.59 4 8/3/2022 Duke Energy PNG Line 142 Pipeline 20210364 03020201 25,489.369 0.59 0.00 DW R 57,351.069 57,351.069 -