Loading...
HomeMy WebLinkAboutSW6211203_Email_20220518 Farkas, Jim J From:Farkas, Jim J Sent:Wednesday, May 18, 2022 2:50 PM To:jamal@jandkbuilders.com Cc:Lawyer, Mike; rfarrell@hokecounty.org; Carlo Pardo; Kitchen, Matthew W Subject:RE: SW6211203; McCain Gas Station Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on March 14, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW6211203, dated May 18, 2022, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Mubarak Shahbain, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): 211 Shopping Center, LLC Attn: Mubarak Shahbain, Managing Member 1184 Fayetteville Road Raeford, NC 28376 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Wednesday, February 9, 2022 2:20 PM To: 'Carlo Pardo' <cpardo@bowman.com>; 'jamal@jandkbuilders.com' <jamal@jandkbuilders.com> Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: SW6211203; McCain Gas Station Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on December 16, 2021. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Monday, December 20, 2021 11:09 AM To: 'Carlo Pardo' <cpardo@bowman.com>; 'jamal@jandkbuilders.com' <jamal@jandkbuilders.com> Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: SW6211203; McCain Gas Station Good Morning, We received your post-construction stormwater permit application for the above mentioned project on 12/16/2021. Reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review will probably be closer to 45 days than 30). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6211203 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 3 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Tuesday, November 16, 2021 1:22 PM To: Carlo Pardo <cpardo@bowman.com>; jamal@jandkbuilders.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: McCain Gas Station, NC Highway 211, Raeford, Hoke County Good Afternoon, We received your application for a new post-construction stormwater permit on 11/15/2021. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/16/2021) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. - 2x signed & sealed hard copies of a plan sheet showing the following: o Delineated drainage area to the proposed infiltration basin (Required per Section IV, 8o of the Application & 15A NCAC 02H .1042(2)(g)(iv)). It is noted that a drainage area delineation has been provided in the stormwater management report, however, the drainage area delineation is required to be provided in the main set of plans. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review): If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer to 45 days than 30). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: 4 Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 5