Loading...
HomeMy WebLinkAboutSW6220604_Supplement-EZ Form_20220926SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Proiect Area (ac) 4 Surface Water Area ac 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? HARRINGTON PLACE RESIDENTIAL DEV'T 77.12 0.6 Low No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell Bayfilter Filterra 0 25 0 26 0 FORMS LOADED DESIGNER CERTIFICATION 27 IName and Title: Or anization: Street address: Jeremy R. Thomas, PE 28 J THOMAS ENGINEERING INC. 29 143 CHARLOTTE AVE, STE 104 SANFORD, NC 27330 30 City, State, Zip: 31 Phone numbers : 919-777-6010 32 Email: JTHOMAS@JTHOMASENGINEERING.COM Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �?*y T'HL BCtI� pppppppe������orrrrrr�gk � rr Seal Signature o Designer Date 9-26-2022 DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM None none 5 Total drainage area (sq ft 3333200 3333200 6 Onsite drainage area (sq ft 3333200 3333200 7 Offsite drainage area (sq ft 0 0 8 Total BUA in project (sq ft 378600 sf 378600 9 New BUA on subdivided lots (subject to permitting) (sq ft 241500 sf 241500 10permitting) New BUA not on subdivided lots (subject to s 137100 sf 137100 11 Offsite BUA (sq ft sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft sf 0 -Sidewalk (sft sf 0 -Roof (s ft sf 0 - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft 121100 sf 121100 sf 0 16000 sf sf 16000 13 New infiltrating permeable pavement on Isubdivided lots (sq ft 0 14 New infiltrating permeable pavement not on subdivided lots (sq ft sf 0 15permitting) Existing BUA that will remain (not subject to s ft sf 0 16 Existing BUA that is already permitted (sq ft sf 0 17 Existing BUA that will be removed (sq ft sf 0 18 Percent BUA 11.4% 11.4% 19 Design storm inches N/A N/A 20 1 Design volume of SCM cu ft N/A N/A 21 1 Calculation method for design volume N/A N/A NAIL INFORMATION IIPlease use this space to provide any additional information about the I 22 drainaoe area(s): drive and parking area for trail (open space amenity) LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 4:1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 3.7 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Swale 23 has 3:1 sideslopes. Swale # Drainage Area ac BUA (ac) Pervious area ac C Q (cfs) Slope M V,,,ow (fps) . V-, (fps) Flow depth (ft) 1 0.50 0.13 0.37 0.50 2.00 1.10 5.00 2.00 0.50 2 2.30 0.53 1.77 0.40 7.30 1.00 5.00 2.70 0.80 3 0.10 0.03 0.07 0.50 0.40 2.40 5.00 0.80 020 4 2.80 0.46 2.34 0.40 8.80 0.90 5.00 2.60 0.70 5 0.40 0.11 029 0.44 1.40 120 5.00 120 0.50 6 5.00 0.51 4.49 0.40 15.80 1.00 5.00 320 0.90 7 0.30 0.07 023 0.40 0.90 120 5.00 1.00 0.50 8 3.00 0.31 2.69 0.40 9.50 120 5.00 3.00 0.70 9 0.05 0.01 1 0.04 0.40 020 1120 3.50 1.40 1 020 10 0.30 0.01 029 0.30 0.70 7.50 4.50 1.60 0.30 11 025 0.11 0.18 0.70 1.40 5.70 4.50 2.30 0.40 12 020 0.10 0.14 0.70 1.10 1.00 5.00 0.90 0.60 13 5.30 022 5.08 0.40 16.70 1.00 5.00 3.30 1.10 14 0.30 0.06 024 0.40 0.90 1.10 5.00 0.90 0.50 15 1.30 022 1.08 0.40 4.10 1.10 5.00 2.40 0.70 16 0.30 0.14 0.16 0.70 1.70 520 4.50 2.30 0.40 17 120 027 0.93 0.40 3.80 1.90 5.00 2.80 0.40 18 5.50 1.00 4.50 0.40 17.40 0.90 5.00 320 120 19 0.10 0.03 0.07 0.50 0.40 1.00 5.00 0.70 0.40 20 020 0.05 0.15 0.50 0.80 1.00 5.00 0.80 0.50 21 025 0.06 0.19 0.50 1.00 720 4.50 1.80 0.40 22 0.05 0.02 0.03 0.60 020 3.70 5.00 0.90 020 23 16.80 2.62 14.18 0.41 55.00 0.50 5.00 3.60 1.80 24 1.50 0.32 1.18 0.50 5.90 2.70 5.00 3.60 0.40 25 1.70 0.42 128 0.52 7.00 1.40 5.00 2.90 0.60 26 0.30 0.10 020 0.50 120 2.00 5.00 1 1.50 0.50 27 0.40 0.12 028 0.50 1.60 2.00 5.00 1.60 0.50 28 0.60 0.12 0.48 0.46 220 4.70 5.00 2.40 0.50 29 1.60 0.38 122 0.40 5.10 3.10 5.00 3.60 0.60 r30 0.50 0.10 0.40 0.40 2.00 3.10 5.00 2.00 0.50 Pervious area (ac) Slope Vactu 1 (fps;