Loading...
HomeMy WebLinkAbout20210364 Ver 1_USACE Provisional Verification_20220615Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, June 15, 2022 3:57 PM To: Morris, Tom E. Cc: Cohn, Colleen M; DePalma, Alicia Knowles; Keith Gualtieri; John Farmer Subject: [External] Provisional NWP 12 Verification, SAW-2021-01288, Piedmont Natural Gas / Line 142 Gas Line / Garner / Wake and Johnston Counties Attachments: 2021-01288 DRAFT Mitigation Responsibility Transfer Form - Blackbird.pdf; 2021-01288 DRAFT Mitigation Responsibility Transfer Form - Arrington Bridge 3.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Morris, This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived AND until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification, including the following: 1) 1) In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Forms (2). The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2) Temporary discharge of excavated or fill material into wetlands and streams will be for the absolute minimum period of time necessary to accomplish the work, and such authorized crossings will be restored per the following: a. All authorized temporary wetland impacts must be returned to pre -disturbance grade and contour and re -vegetated per "Line 142 Pipeline, E&SC Details, Clayton, North Carolina", Drawing Number PNG C- 142-0001085, Detail 15. In wetland areas where pipeline installation via trenching is authorized, wetland topsoil must be segregated from the underlying subsoil, and the top 6 to 12 inches of the trench must be backfilled with topsoil from the trench. Seeding of disturbed wetland areas must be done per "Line 142 Pipeline, E&SC Seeding Requirements, Clayton, North Carolina", Drawing Number PNG C-142-0001081, "General Seeding Requirements for Wetland Areas." b. All authorized temporary stream impacts must be returned to pre -disturbance grade and contour, and stabilized per "Line 142 Pipeline, E&SC Details, Clayton, North Carolina", Drawing Number PNG C-142- 0001082, Details 2 and 5 (Stream Impacts 531 and 535). Seeding of stream banks in these areas must be done per Drawing Number PNG C-142-0001081, "General Seeding Requirements for Riparian Areas." 3) Wetland crossings W2, W4C, W4D, W4A-A, W4E, W6A, and Stream crossings 57, 58, 59, 510, 511, 512, 518, and the Neuse River must be accomplished through trenchless methods, such as HDD or similar. Note that no discharges of dredged or fill material are authorized within the Neuse River whatsoever. 4) The permittee shall use a contracted environmental compliance officer(s) who will remain on -site throughout the construction period. This individual must ensure compliance with all general and specific Department of the Army and North Carolina Division of Water Resources permit conditions and certifications. Once construction begins within crossings subject to this authorization, compliance reports must be submitted to the Corps of Engineers, Raleigh Regulatory Field Office and North Carolina Division of Water Resources on a bi-weekly basis, until construction within these areas is complete. i Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Office: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. 2