Subject: Approval #f4O1 Water Quality Certification and Catawba Riparian Buffer
Authorization with Additional Conditions; Shoreline Stabilization, 524 Stonewater Bay
Lane, Mount Holly, Lake Norman
Dear Mr. Debelak:
You have our approval for the impacts listed below for the purpose described in your application dated
October 7, 2014 and received by the Division of Water Resources (Division) on October ZC\ 2014. These
impacts are covered by the Water Quality General Certification Number 3898 (attached), Catawba Buffer
Rules and the additional conditions listed below. This certification is associated with the use of Regional
Permit Number 198200030 issued by the U.S. Army Corps of Engineers and expires on the same day.
Please note that you should obtain any other applicable federal, state or local permits before proceeding
with your project, including those required by (but not limited to) the local lake management authority,
erosion and sediment control, non-discharge, and water supply watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certification, the general permit
and the following additional conditions:
1. The fnHovvimB impacts are hereby approved provided that all of the other specific and
general conditions of the Certification and Buffer Rules are met. No other impacts are
approved, including incidental impacts. Please note that this approval in for the repair and
stabilization of the existing shoreline but this approval does not allow any extension of
the mhmnuUnm into the take. [15A NCA[UlH .0508/b\' 15A NC4C 82H .0507(c) and 15A
NCAC 02B 0243(8)]
Type of Impact Amount Approved (sq. ft.) permanent
Open Waters � below normail pond N/A
Open Waters - above normal pond 2,020 sq. ft. (202 ft. x 10ft.)
Buffers — Zone 1 2,020 sq. ft.
Division of Water Resources -40& Buffer Permitting Unit
1617 Mait Service Center, Raleigh, North Carolina 278SS-1O17
Location: 512NSalisbury St. Raleigh, North Carolina 278Q4
Phone: 81Q-8O7-6JO0\ FAX: Q18-807-0494
|nterne1:vmww.ncwmbwnqua0ty»rA
An Equal Opportunity \ Affirmative Action Employer - Made in part by recycled paper
Jacoboebelak
ovvn#z+z1O4
401/aUppsnxppnov4L
Page ]ur3
l This approval is for the purpose and design described in your app|ication. The plans and
specifications for This project are incorporated by reference as part of the
Certification/Authorization. If you change your project, you must notify the Division and
you may be required to submit a new application package with the appropriate fee. If the
property is sold, the new owner must be given a copy of this approval' letter and
Certification/Authorization amd is responsible for complying with all conditions. [15A N[AC
02N .0506 and 15A WCACO28 .0243(8)l
3. The Division Mooresville Regional Office (610 East Center Avenue, Suite 301, Mooresville,
NC 28115) shall be notified in writing once construction at the approved impact areas has
commenced. [15/\NCA[02H.8502(e)]
4. Only those trees that are undermined or leaning can be memoved. K4inhnaU shaping and
sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
S. Beaches impervious patios, impervious walkways, etc. are not allowed in the buffer unless
specifically approved by the Division and must meet the Catawba Riparian Buffer Rule
requirements. [15A NCAC 02B .0243(4) and (6)]
6. Any access corridor shall not exceed 10 ft. in width and shall be restored to its original
condition prior to the project. [15A NCAC 02B .0243(6))
7. All staging, including spoil, stockpile and construction material, shall occur outside of the
8. Work is to be conducted from land as indicated in your application. 115A N[A[02H I502
and 15A NCAC 02B 0243(8)1
9. All stonnvvater shall be directed as diffuse or sheet flow (not piped) at non-erosive
velocities through the protected lake buffer and should not re-Concentrate before
discharging into the lake. [15AN[ACO28.0243(S)]
10. The applicant and/or authorized agent shall provide a completed Certificate of Completion
Fnnn to the DVVR401 and Buffer Permitting Unit within ten days of project completion.
(available et: or see
attached) [15A NCAC 02H .0507 (c) and 15A NCAC 02B.0243(8)]
This approval and its conditions are final and binding unless contested.
This [ert0Qratk)n/BufferAuthohzat|on can be contested as provided in Articles 3 and 4ofGeneral Statute
150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known asOAH). A petition form may be obtained from the OAH at or by
calling the OAH Clerk's Office at (919) 431-3000 for information.
Within sixty h6O\ calendar days of receipt of this notice, e petition must befiled with the OAH. A petition is
considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in
Jambn,bela*
oWxws4a1$4
401/euppsn4ppeOv4L
Page sofa
the OAH during normal office hours /Monday through Friday between 8:00am and 5:00prn' excluding
officiail state holidays).
The petition may be faxed to the OAH at(919) 432-S1O8,provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the 04H within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via &J Postal Service: If sending via delivery service (UPS, FedEx,eUc):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, N[27699-6714 Raleigh, NC27609-G285
One (1) copy of the petition must also be served toDENK:
John Evans, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC27699-16O1
This letter completes the review of the Division under section 401 of the Clean Water Act and the Catawba
Riparian Buffer Rules as described in 15A NCAC 02B .0243. Please contact Shelton Sullivan at 919-807-6361
or if you have any questions orconcerns.
Sincerely,
Karen Higkins, Supervisor
401 & Buffer Permitting Unit
Emdoownas: GC 3898; Certification of Completion Form
m:: KyzerCauthen, Vision Scape Group, PO Box 4057 Rock Hill, SC 29732
Duke Energy Lake Services, PQ Box 1Q06 Charlotte, NC 28201-1006
USACEAsheviU* Regulatory Field Office
DVVRMRO file copy
DVVR401 & Buffer Permitting Unit — file copy
Filename'. 141104Debelak524StonewaterBayLnMtHollyLkNorman(Gaston)-401—CRB